OBLYTECH Logo
OBLYTECH Logo

Dispose of consumable assets

To dispose of consumable assets in ServiceNow, open the consumable record and use Mark for disposal for the quantity no longer needed. The Planned for disposal column identifies records selected for disposal. A partial quantity creates a separate record with a pending disposal substate; a full quantity updates the existing record.

Check the stockroom quantity before selecting disposal

A consumable record represents a quantity of items of the same model. It does not provide the same individual tracking as a separately recorded hardware asset. Before marking anything, reconcile the record with the stock that is actually being removed. Confirm the Model, Stockroom, State, Substate, and Quantity so that a decision about one group does not affect another.

Start with the physical decision: which items are no longer needed, where are they stored, and how many are involved? Treat those as operational checks before changing the record. An incorrect stockroom or an outdated quantity can make a technically successful disposal action describe the wrong inventory. Resolve that discrepancy before choosing a total or partial quantity.

Use the stockroom management and hardware receiving guide when the discrepancy begins with receipt or stockroom records. Disposal should follow a clear stock decision rather than become a way to hide a receiving mismatch.

The steps here use Brazil behavior; check the controls and terminology on your instance and release. For the disposal procedure, the required role is asset, itil, or itil_admin. Keep that requirement attached to disposal rather than assuming it grants permission for unrelated model or asset administration.

Dispose of consumable assets with the correct quantity

The Consumable [alm_consumable] table includes the Planned for disposal column. Use that indicator to distinguish a record already selected for disposal from stock that has not yet been marked. The action is performed from the consumable record, so inspect the record behind the row before proceeding.

  1. Navigate to All > Asset > Consumables and open the intended consumable record.
  2. Check that the asset is in stock and has not already been marked for disposal.
  3. At the top right of the record, select Mark for disposal.
  4. In the Planned for disposal dialog box, enter the total quantity or the partial quantity that should leave usable stock.
  5. Review the resulting record and reconcile the quantity selected with the items being removed from the stockroom.

Mark for disposal appears for consumables that are in the in-stock state and are not already marked. After marking, the action no longer appears. If you reopen a record and the action is absent, check the existing disposal indicator and state before treating this as a permissions problem.

A consumable must be marked for disposal to be included in a disposal order. Keep marking and disposal completion distinct in your operating checklist. The marker establishes disposal intent; the physical handoff and completion details still need to be checked through the applicable disposal process.

Understand partial quantities and separated records

Choosing a partial quantity creates another consumable record with the substate pending disposal. Choosing the total quantity changes the existing record’s substatus to pending disposal and returns you to that record. That difference determines where the operator should look after making the selection.

For example, suppose a stockroom holds a keyboard record for a group of desks and only part of that group is being retired. The check is that the selected quantity matches the keyboards physically leaving storage, and that the remaining quantity still matches the physical count. This is a quantity reconciliation example, not a reason to create a second record manually before using the disposal action.

After a partial selection, identify the record that represents the disposal quantity. Compare its model and stockroom with the original selection. Then reconcile the remaining stock against the physical count. Review both sides of the split so that staff do not mistake a newly visible record for an accidental duplicate.

Marked consumables do not merge with another consumable record. A separate disposal row can therefore be expected even when the model looks identical to stock elsewhere in the list. A marked consumable does not merge with another record. In practice, that separate row is what shows the disposal decision, so avoid combining it just to shorten the list. The Planned for disposal value explains why the record needs separate attention.

For a total selection, check the original record rather than searching for a newly created one. Record which quantity was reviewed before marking it. If the physical count later changes, pause the stockroom handoff and reconcile the difference before continuing. For a partial selection, give the person collecting the items enough detail to identify the separated group: model, stockroom, and selected quantity. Give the person collecting the items the model, stockroom and selected quantity so they can find the separated group.

Cancel a disposal selection before proceeding

Use Cancel from disposal when the disposal decision changes and the action is available. It appears when Planned for disposal is true and the Disposal number field is blank. Check both conditions before attempting to reverse the selection; the indicator alone does not establish that cancellation is available.

  1. Open the consumable record selected for disposal.
  2. Select Cancel from disposal.
  3. In the Cancel from disposal dialog box, select a stockroom. If a stockroom is already selected, the Stockroom field is read-only.
  4. Select a substate and click OK.
  5. Verify that Planned for disposal is false and that the resulting stockroom and substate fit the intended inventory position.

If the consumable was added to a disposal record, cancellation deletes the planned asset record. Include that consequence in your review so that a removed planned entry is understood as part of cancellation. Do not assume that reversing the marker leaves the disposal planning records untouched.

If cancellation is unavailable, record the disposal indicator and whether the Disposal number field is populated before escalating. Avoid changing unrelated fields to manufacture the conditions for the button. The hardware asset management troubleshooting guide provides a broader route for investigating unexpected asset behavior.

Review the inventory and disposal trail

After marking or canceling, inspect the record that actually changed. Check quantity, stockroom, state or substate, and Planned for disposal together. A single flag cannot explain whether the right items were selected. For a partial selection, include the original and separated records in the same review.

Consumable records can hold Disposal reason, Scheduled retirement, Retired date, and Work Notes. Use the applicable fields to preserve the business decision and the actual sequence of work. As an operating recommendation, record why stock is being removed and the quantity checked, so the next operator can understand the selection without reconstructing it from memory.

Disposal order number, Disposal vendor, Vendor disposal order ID, and Disposal date appear on the consumable form when Hardware Asset Management is installed from the ServiceNow Store. Disposal date represents completion of the disposal order process. Do not treat a planned retirement date or a true disposal marker as interchangeable with completion evidence.

For help planning this work, see ServiceNow implementation.

Place this checkpoint within your hardware asset lifecycle process. The stockroom team should be able to distinguish the decision to remove inventory, the quantity set aside, and the completed disposal record without relying on a single status label.

When another consumable record appears after receiving, compare more than its model name. Normal merging also depends on matching fields such as location, stockroom, install status, substatus, parent, asset function, and assignment. Records on an active transfer order are not eligible for merging. Merging happens on receipt, when a received consumable matches an existing record on fields including model, location, stockroom and planned-for-disposal status. Records on an active transfer order do not merge. A row that stays separate because it is marked for disposal is correct, not a duplicate to fix.

Questions about related consumable records

Issued accessories are consumed, not disposed of

For accessories being issued for use, the consumption action serves a different purpose. Consume requires State In Stock and Substate Available, with role itil, asset, or itil_admin. It supports associating the quantity with an asset and a user. Choose the action that describes what actually happened to the items.

Procurement does not track individual consumables after receipt

After receipt, individual consumables are no longer tracked within Procurement or displayed on receiving slip lines. Purchase order related lists do not display consumable asset details. Reconcile the consumable quantity in the asset records rather than expecting a purchase order to identify each item awaiting removal.

A model’s lifecycle phase does not change a consumable’s disposal selection

Model lifecycle fields (phase, source and phase dates) sit on the consumable model. Nothing on that model links an End of Life phase to a consumable’s disposal selection, so check the consumable record’s Planned for disposal value directly before deciding what to remove.

A consumable with a parent asset has read-only Assignment and State

When a consumable has a Parent asset, its Assignment and State fields are populated from that parent and become read-only. Check the parent relationship before treating the field as broken. This helps explain the record’s behavior without assuming that the disposal indicator controls state editing.

Enterprise Asset Workspace consumables are created in the Build state

Enterprise Asset Workspace uses Build as the default State on Create New Consumable. Creating a consumable there requires sn_eam.enterprise_asset_manager. Do not assume that a newly created record is ready for the in-stock disposal action; inspect its actual state before planning the next inventory step.