An enterprise asset work order records one piece of physical work on an asset, such as a transformer, meter or pump, or on a group of related assets. In ServiceNow Enterprise Asset Management, the work order starts in draft, holds its work order tasks, and reaches closed complete once those tasks are finished.
What the work order holds and how it connects to the asset
The work order is the container. Its tasks carry the detail: who is assigned, the type of work, the time window and the asset state the job moves through. New to the term? The how work orders work in general explainer covers the wider model, and the IT asset management guides place this process within the full asset lifecycle.
A work order can point at a single enterprise asset, at a linear asset or linear segment such as a run of line, or, from Enterprise Asset Management version 10.0, at an asset group.
Utility field teams tend to work across a territory: a substation bay here, a span of poles there, a fleet of meters further out. Each of those is an enterprise asset. Teams that want the sector view can start with asset management for energy and utilities.
Setting up an enterprise asset work order record
Open the Enterprise Asset Workspace, go to Work management, select the Work orders tab and choose New. Creating a work order requires the enterprise asset manager role.
| Field | What to enter |
|---|---|
| Asset | The enterprise asset, linear asset, linear segment or asset group the work applies to |
| Location | The asset’s current location. For a linear asset, a map lets you pick a point between the start and end markers. |
| Contract | The contract that defines the lease terms on the asset, where one applies |
| Priority | How urgent the work is compared with other work |
| Template | A work order template that generates tasks, part requirements and checklist items |
| Due by | The date and time the work must be complete |
Saving places the work order in the Draft state, and the assets appear on the Affected assets tab. Select Ready to Work when the record is complete. To see template output while the record is still in draft, the enterprise asset manager role must make sure the Apply Work Order template in draft status field is enabled in the Field Service Management configuration. Templates live in the Field Service Catalog, part of the Field Service Management application. After installing Enterprise Asset Management from the ServiceNow Store, check that Field Service Management is active on your instance, because the draft-status template setting lives in that application. Teams running field crews can review the field service management for energy and utilities guide at this step.
Breaking the job into work order tasks
Each task carries a work type: break fix, install, planned maintenance, asset condition, shutdown, startup or calibration. The type also decides which mobile asset actions apply.
| Work type | What the crew can do to the asset |
|---|---|
| Break Fix or Planned Maintenance | Move the asset to the maintenance state while work is underway |
| Shutdown | Mark the asset as shut down, so it is unavailable during the job |
| Startup | Return the asset to the in use state afterward |
To add a task, open the work order, select the Work Order Tasks tab and choose New. The form takes an assignment group, an assigned agent, the work type, descriptions, a window start and end, and an estimated duration. Creating a task requires the wm_agent role.
Tasks often depend on one another. A startup task, for example, is usually planned to follow the maintenance it closes out. Record upstream and downstream dependencies on the task so the sequence is visible to whoever assigns the work. Templates hold the same sequence through the Depends on field on each template task.
Planning checklists, parts and sign-off steps
Checklist items sit on the Checklist items tab of a work order or task. Add them one at a time with a name and an order number, where order 1 is the first step, or apply a checklist template and refresh the list.
Missing parts show on the Part Requirements tab. Source Parts Request lists each requirement not yet requested, with all of them selected by default, and the request quantity can exceed the amount the requirement calls for. The sourcing finishes under Asset operations, Procurement, Requests, through the Source Request Items catalog task, and completing it requires the enterprise asset manager role.
In the Mobile Agent app, a technician can view part requirements and start a source parts request from a task’s Parts tab. The app cannot create a new part requirement, and the requirement moves from Not requested to Requested.
Moving assets through maintenance, shutdown and startup
The mobile app has three actions that change an asset’s state. Each needs its matching task in Work in progress, and each runs under the sn_eam.asset_technician role.
| Mobile action | Task it belongs to | Asset state after the action |
|---|---|---|
| Move to maintenance | Break fix or planned maintenance | In maintenance. Allowed from In use, In use and Pending repair, In use and In repair, or In use and Is shutdown. |
| Shutdown | Shutdown | Substate Is shutdown. The asset must be In use or In maintenance first. |
| Start up | Startup | In use |
A technician opens My Tasks, selects the task, taps Start Work on the Details tab and then opens the Related tab, where the affected assets and the action button appear.
Take a planned repair on a line of poles as an example. The shutdown task takes the affected assets out of use. The planned maintenance task moves them to the maintenance state while the crew works, and the startup task returns them to use.
Deploying, swapping and removing assets during the job
The Asset Usages tab holds three actions.
| Action | Condition before the action | Result |
|---|---|---|
| Deploy | The asset shows Not Used on the tab, or it is In stock in your personal stockroom with a Substate of Available or Reserved | The asset shows status Used on the tab. It also joins the affected assets list when the task already has one. |
| Swap | The replacement is In stock. When the affected assets list is populated, the swap-out choices are the listed assets and their descendants that have Hot swappable set to true | Both assets appear on the tab, and the replacement joins the affected assets list |
| Remove | The asset is In use, In maintenance or Consumed | The removed asset shows State In stock and Substate Pending disposal in the asset usages list, and it leaves the asset group when the task is based on one |
The choices in the swap and remove fields depend on the affected assets list. When it is empty, the task’s location drives the choices.
Completing and closing the work order
- In the Enterprise Asset Workspace, open Work management, select the Work order tasks tab and open the task.
- Select Start Work. The task moves to Work In Progress.
- Finish the asset usage actions, and any calibration events on the task. Calibration tasks create one event per asset carrying a calibration attribute, and a calibration event with a failed line can be remediated through a new work order.
- Select Close Complete. The task and its associated work order both move to Closed Complete.
Scheduling repeat work through maintenance plans
A maintenance plan manages routine maintenance for enterprise assets, linear assets and linear segments, and it runs on demand or on criteria. Create one from the Maintenance plans tab of Work management, with plan type Maintenance plan. Each plan record carries the prefix MP.
Triggers include Duration, which runs on a time pattern such as an interval, weekly, monthly or annually; Meter, which runs when an enterprise asset field matches a value; Condition, which runs on filter conditions; Script, which runs on advanced script criteria; and Duration or Meter, whichever comes first. Lead time sets the days the scheduled work needs.
To finish a schedule, apply a work order template on the Schedule Templates tab, then use Associate records to link the schedule to the plan’s assets. Each run creates a work order for each asset the plan applies to, unless that asset already has one.
For sequences across many assets, a work order plan suits better. It groups tasks such as shutdowns, safety inspections, calibrations, condition assessments and restarts, and moves through five stages: Details, Review affected assets, Review assignments, Review schedule and Track status. Teams planning this across a wider rollout can review asset management implementation support.
Frequently asked questions
What is the difference between a work order and a work order task?
A work order is the overall record for work on an asset or asset group. A task is one assigned piece of that work, with its own agent, work type and time window. Close Complete on the task also closes the work order.
Can one work order cover several assets?
Yes. Point the work order at an asset group, from version 10.0 onward, and the affected assets list fills with assets from parent groups and subgroups.
Why does a new work order show as Draft?
Saving creates the work order in Draft. Select Ready to Work to start it. If templates should generate tasks while the record is still in draft, the draft-status setting in Field Service Management has to be enabled first.
Does a maintenance plan create work orders on its own?
When a schedule runs, the plan creates a work order for each asset it covers, unless that asset already has one. You can also run a schedule on demand.