After receiving, a stockroom stays accurate through four routines: picking assets for requests, putting them away in marked aisle-spaces, auditing counts against physical stock, and running stock rules that restock low models by transfer or vendor order. Picking and put-away are switched on per stockroom, so setup starts with the stockroom record.
Why stockroom work continues after receiving
Receiving gets an asset into the instance, but the record stays useful when the asset can be found, handed out and counted later. Hardware Asset Management groups this day-to-day work as inventory and stockroom operations: putting stock away, picking for deployment, auditing, and watching stock levels. For the intake step, see the stockroom receiving guide.
Setting up the stockroom record
A stockroom is a standalone entity in the Asset Management application, and assets are assigned to it. Each one has a name, an assignment group that primarily uses it, a physical location, a type such as Field Agent or On site, and a manager. Creating a stockroom requires the inventory_admin role.
The manager matters for restocking. That person receives restocking notifications and the requests tied to the stockroom’s stock rules. The restocking email needs the manager to have an email address on record, so check that before enabling any rule. The setup steps and pitfalls guide covers the rest of the configuration.
Picking and put-away are enabled per stockroom. Open the stockroom from the All stockrooms tab in the Hardware Asset Workspace and make the change there. Tick the Warehouse tasks required check box on the Stockroom Details form to mark the stockroom for warehouse tasks. The same check box also switches on the asset pick task.
Stock rules: thresholds and restocking quantities
A stock rule says that when the stock of one model in one stockroom reaches a threshold, a set quantity should arrive, either by transfer from another stockroom or by vendor order. The rule counts all assets of the model in the stockroom as one total.
| Field | What it controls |
|---|---|
| Threshold | The stock level that triggers restocking; must be greater than 0 |
| Restocking option | Stockroom (transfer) or Vendor (order); Stockroom is the only option when Procurement is inactive |
| Parent stockroom | The source of a transfer; required for the Stockroom option |
| Order size | The minimum quantity for transfers or purchases; must be greater than 0 |
Current stock counts Available and Reserved assets in the stockroom, plus assets on open transfer orders heading there. The restocking quantity is the shortfall rounded up to the nearest multiple of the order size. Take three laptops against a threshold of 10 with an order size of 4. The shortfall is 7, which rounds up to 8, so the transfer brings stock to 11.
A transfer order is created only when the parent stockroom holds enough Available assets to cover the full restocking quantity. Reserved and Pending Install assets do not count. With a restocking quantity of 5, a parent holding 1 to 4 available assets gets no transfer order. The order size applies to automatic transfers only, so a manual transfer can move any available quantity.
A Vendor rule sends the stockroom manager an email. A Stockroom rule creates a transfer order. With Hardware Asset Management active, a Vendor rule also creates a Hardware Inventory Stock Order request, which is sourced with a purchase order. Without that application, the system creates a purchase order and a line item directly. The Purchase option on the stock order needs an active vendor catalog item for the model, and the vendor company record needs the Vendor check box selected. Without an active catalog item, the request still forms, but Purchase is unavailable. A vendor rule also does not stack orders: while one is open, it creates no second one.
What the Stock Rule Runner creates
A Stock Rule Runner job runs daily. It checks stock against each threshold, creates tasks for stockroom managers and emails them. What it creates beyond that depends on the rule type and the active applications:
| Setup | What the runner creates |
|---|---|
| Neither Procurement nor Hardware Asset Management active | A task for the manager to replenish stock |
| Procurement active, Vendor rule | A purchase order and line items, for models published as vendor catalog items |
| Hardware Asset Management active, Vendor or Service Catalog rule | A Service Catalog request in the cart for the manager to review and approve |
| Stockroom rule | A transfer order, unless one is already in progress |
Duplicate protection runs on a flag called pending_delivery. While it is true, the rule is in progress and no duplicate tasks or orders are created. When it is false, the runner reprocesses the rule. Set it back to false once a rule has been handled, so the runner can run without redundant work.
Whether cart requests submit themselves depends on the glide.sc.checkout.twostep system property. Its default is false, which submits items automatically so the runner’s flow continues. If it is set to true, items reach the cart but wait for a separate submission step, so teams changing the setting should plan for that step.
Picking and put-away: aisles, spaces and drop-off locations
The Asset pick task is enabled explicitly for each stockroom. Once it is on, the task is added automatically to Standard Hardware Asset requests, Hardware Asset Refresh requests and the sourcing workflow. Add the stockroom’s aisles and spaces in the Hardware Asset Workspace so staff can locate each asset. Open hardware asset pick tasks are listed per stockroom.
The Asset put away task tracks movement from the receiving bay into a designated space. Once warehouse tasks are enabled on a stockroom, its Asset put away task is created automatically. Staff can also create one manually for an in-stock asset that has no aisle and space set, from the Inventory overview or from a stockroom’s open put-away tasks.
| Field | Purpose |
|---|---|
| State | Set to Open when the task is created |
| Assignment group and Assigned to | Routing, and the person primarily responsible |
| Drop off location | The aisle and space where the asset goes; required to close the task |
Closing a task needs a Drop off location value, so place the asset first, add the value, then close. Saving without closing keeps the task open.
On a phone, put-away runs in the ServiceNow Agent application, where an inventory user scans the available assets and then scans the designated drop-off location.
Auditing stock: scheduled and blind checks
An audit reconciles the physical assets in a location with the instance. Assets are identified by scanning their asset tag, serial number or model barcode. The system then checks the scans against the records and generates an audit result. Scheduled audits are created as audit records in Hardware Asset Management. Blind or unscheduled audits are created with the ServiceNow Agent app, which supports single-scan and multi-scan completion.
Audit records are saved to one of two tables, depending on the sn_hamp.migrate_hamaudit system property. When it is true, records go to the common Asset Audits table. When it is false, they go to the older Hardware Asset Management audit table. From version 15.0.0 the common table is the target, and any records still In progress or New should be completed before switching.
Access to audits depends on role:
| Role | Stockroom scope | Can delete |
|---|---|---|
| sn_itam_common.asset_audit_user | All stockrooms | No |
| sn_itam_common.asset_audit_admin | All stockrooms | Yes |
| sn_itam_common.personal_stockroom_audit_user | Assigned personal stockrooms | No |
| sn_itam_common.personal_stockroom_audit_admin | Personal stockrooms | Yes |
Stockroom details and repairs
The stockroom record gives a quick health check. Its Details tab shows cards for the open orders, audits and requests tied to the stockroom, and a task timeline lays out its stockroom tasks by date. A Sourcing by AI agents section offers auto-consume, auto-transfer and auto-purchase options.
Defective stock moves through the repair flow: an asset manager raises repair orders, a technician troubleshoots, repairs and evaluates the asset, and it is put back into use or disposed of. An order is fulfilled once all its repair asset tasks are complete.
Frequently asked questions
Why did a stock rule not create a transfer order?
The parent stockroom probably did not hold enough Available assets to cover the full restocking quantity. Reserved and Pending Install assets do not count toward that total.
Does a transfer trigger a restocking email?
The Stockroom option creates a transfer order. Restocking emails are sent through the Asset Restocking email action, whose trigger conditions and recipients can be customised.
Why is the Purchase option missing on a stock order?
The model needs an active vendor catalog item, and the vendor company record needs the Vendor check box selected.
Why was no put-away task created for a stockroom?
The stockroom needs the Warehouse tasks required check box ticked. A put-away task also cannot be closed until it has a Drop off location.
Which audit table holds my records?
It depends on the sn_hamp.migrate_hamaudit property. True stores records in the common Asset Audits table, and false stores them in the older table.
Teams that want outside help with configuration can look at the ServiceNow services section of this site, and the Hardware Asset Management hub groups the related guides.