OBLYTECH Logo
OBLYTECH Logo

Contract Management Pro: Records, Renewals and AI Features

Contract Management Pro is the ServiceNow application for creating, executing and storing contracts. It keeps each signed agreement in a contract repository record, runs renewals as a dedicated request type, and adds AI skills for clause review, metadata extraction and natural language search. The sections below follow a contract along its usual path, using the Brazil release.

What the application covers

Administrators build contract document templates, clauses and clause variations, then start contract, amendment and renewal requests from them. For the template concept on its own, see the document template explainer. A clause is a collection of variations, and when a document is generated the variation that applies is chosen automatically from a condition such as a field value, user criteria or a script.

Requests can be tied to a business unit entity, such as a purchase requisition or a sourcing event, or raised as standalone requests with no parent record. The Contracts Dashboard shows contract request trends, the age of open requests and average completion time by contract type.

Contract records and their views

When a contract document is finalized and its signatures are complete, the application creates a contract repository record holding the changes from the request. The repository is secure, centralized storage inside ServiceNow, and signed documents can sit on the instance or in an external storage system. For the record and table terms used across this site, see the ServiceNow concepts index.

View What it shows
Details Contract dates, parties, contract type and other metadata fields
Contract documents Signed documents, including those generated during a renewal
Contract requests Renewed and amendment requests raised on the contract
Contract history Renewal history with linked contracts, dates and status

From the workspace, open Contract Requests on the Lists tab, open the contract, switch to the Contract repository tab and select the record. This path requires the sn_cm_core.contract_fulfiller role.

Request states

The State field shows where a request sits in its life cycle. Draft means not yet submitted, and New means waiting for a contract fulfiller. Work in progress means a fulfiller is working on it. Awaiting review and Awaiting approval mean an internal review or approval task is open. Awaiting signature means the document has gone out to signatories. Contract signed means all signatories have signed, and Closed complete means approvals and signatures are finished.

The Contract status field adds document detail such as Changes requested, Document ready or Signing declined. On a request with several documents, the approval status for cumulative approvals is taken from the latest revision of the documents.

Starting a renewal from a contract record

The contract must be Active with an end date, or Expired, and it cannot already have a renewal waiting. Select Renew in the record header, then choose Contract Amendment and Renewal in the pop-up. The request type is fixed to Renewal, and the linked contract, company, contract type and requested-for fields fill in from the original. Then:

  1. Choose Own paper or Third-party paper. Own paper renewals are generated from your template, while third-party renewals take an uploaded document.
  2. Set the renewal start date, which must be today or later. If the original contract has an end date, the start date defaults to the day after it.
  3. Attach documents. For own paper they are optional. For third-party paper at least one is required, and each must be classed as a supporting document or as the selected contract type.
  4. Choose the signature type: electronic, wet or offline.
  5. Add external signatories. Own paper needs at least one.
  6. Select Save as Draft to return later, or Submit.

An own-paper renewal with all required fields lands in Work in Progress, and the application generates Version 1.0 from the template with internal signatories already filled in. A third-party renewal with its required fields lands in New. Either way, the renewal links to the original contract through a previous-contract link.

Starting a standalone renewal request

Requesters can raise a renewal from Employee Center, under Help center and then Contracts. Fulfillers open the contract request list in their workspace, select New, choose Contract request and set the Request type to Renewal.

The contract is found through the Company and Contract type fields. Results cover active and expired contracts that have an end date, and a contract with a renewal already in progress cannot be picked. If the contract is missing, choose Enter contract details manually and upload one PDF. When the chosen contract ends in the future, the start date defaults to the day after that end date and can only move later.

Situation Resulting state
Own paper, previous contract linked, details complete Work in Progress
Own paper with no linked previous contract, or third-party paper New
Details incomplete Draft

Finishing a renewal request

A fulfiller selects Assign to me and then Start work. In Contract request details, the Previous contract record field needs a link. Its search lists active contracts with end dates and expired contracts with no pending renewal, filtered by contract type and company.

Revised text goes back in through Create Revision in the Contract documents tab. Each revision number is one higher than the last, and earlier changes are kept. Signatories can be added or removed on the Signatories tab, which for own-paper renewals works when the template includes signature blocks. Finalization uses an ad hoc approval, an internal review, an email to stakeholders or the signature workflow. When all signatures are in, the request moves to Contract Signed and then Closed complete, the new repository record is created, field values are copied across, and renewal history appears on the Contract History tab.

Running renewals alongside amendments

A contract can have an amendment and a renewal in progress together. The application does not block either request, but it warns where they could conflict. If an amendment finishes first, the record shows it as applied; when the renewal executes, the record states that the contract has been renewed as the new contract. If the renewal comes first, a warning appears before an amendment is submitted, noting that a renewed contract already exists.

Reconciling the two is a manual task. Check whether effective periods overlap, whether terms and pricing changes conflict, and whether effective and expiration dates line up.

Choosing a signature method

Signature type How it works
Electronic signature Signatories sign through a configured provider, such as Docusign or Adobe Acrobat Sign
Wet signature Signatories sign on paper, and the signed PDF is uploaded to the request
Offline signature The contract is signed outside the application, and no signature emails are sent

With electronic signature, the first signatory receives an email, and later signatories are called in the order set on the Signatories tab. Entries that share a signing order receive their requests together. If a signatory declines, the requester is emailed and the request returns to Work in progress. For the general email mechanism behind messages like these, see the notifications and email handling guide. Mixed workflows are possible: the fulfiller uploads a wet-signed PDF, and once everyone has signed the signature type reads Mixed signature.

AI capabilities in Contract Management Pro

In the Brazil release the AI features are branded ServiceNow Otto for Contract Management Pro. The AI contract administrator installs the plugin and activates skills, the AI contract configurator maps use cases, and the AI contract fulfiller runs the analysis.

Capability What it does Limits and notes
Contract analysis Shows suggestions for non-standard and missing clauses in the contract document Available on renewals once the use case mapping for renewal requests is configured
Metadata extraction Pulls metadata from a signed contract into the Document Intelligence interface Starts automatically or manually, set by a system property. Not available when the manage contract repository agentic workflow is enabled.
Obligation extraction Extracts obligations into a contract playbook Runs through the manage contract repository agentic workflow
Conversational search Answers natural language questions about metadata and document content Covers contract metadata fields and contract document content. Not supported in the Virtual Agent panel

The manage contract repository workflow also calculates reminder dates from the end date and renewal clauses, and users review the results in a playbook before the repository changes. Generative AI skills can use Now LLM Service, Azure OpenAI, Google Gemini or Anthropic Claude as the model provider. AI Control Tower defines the available options, and the AI Admin Hub console sets skill-level preferences. For another set of generative AI features in a different ServiceNow application, see Now Assist for ITSM.

Connecting an external AI tool through the MCP server

The Contract Management Pro MCP Server lets MCP-compatible AI tools retrieve the approved playbook for a contract type. Playbooks hold clause-level organizational positions and fallback language, and each contract type gets its own playbook, selected automatically. An administrator installs the MCP Server application, which requires Contracts Core (sn_cm_core) to be active. The MCP server’s OAuth 2.0 authentication is set up afterwards. For the general authentication setup this relies on, see the OAuth profile explainer.

Fulfillers can retrieve the playbook while the contract is in Work in Progress, and reviewers while it is Awaiting Review with the review task in progress. Generative AI can produce inaccurate output, so redlines should be checked before they are accepted. For the vendor side of supplier agreements, see the vendor risk management guide.

What should a renewal price-change breakdown separate, given that packaging and AI entitlements can change the comparison?

A renewal price-change breakdown should separate the net unit rate on each entitlement already held from added quantities, new modules, package migration, AI entitlements and services. Keeping those lines apart shows whether the same thing cost more, or whether the bill grew because the buyer bought more or different things.

Keep the unit rate separate from the quantity

The first line is the net unit rate for an entitlement the contract already holds, in the unit the contract uses, such as a fulfiller or active user. Extra fulfillers are a quantity change and belong on their own line, even though they raise the total the same way.

Show package migration as its own line

When products move into a new package, old and new items are often different entitlements. A migration can bundle functions, drop others or change the consumption basis. Ask for a map from each old entitlement to its package equivalent, with the price difference on each swap. An unmapped line is unexplained, not a unit-rate increase.

Break out AI entitlements and included allowances

As of ServiceNow’s April 9, 2026 announcement, AI, data, security, and governance are included across its new offering model. Inclusion does not tell you how much AI capacity the renewal grants or whether it replaces something already paid for. Record the allowance, its consumption basis and any charge once it is exceeded.

Separate modules and services from the subscription

New modules and services often sit on the same quote as the subscription, hiding them in one total. Give each module a start date and term line. Services buy delivered work and subscriptions buy access, so do not compare the two.

Compare protected pricing against the full bill

The 2025 amendment materials posted for San Francisco describe maximum net unit price changes for each renewal year. The protection covers net unit prices, not the city’s total bill, and the posted materials are not a verified executed order. It also required renewed quantities to equal or exceed the cumulative quantity of the expiring term, so cutting seats can remove the protected price. Show the right-sized option beside the protected one.

Ask for the breakdown in writing

  1. The net unit rate for each existing entitlement, before and after renewal.
  2. Added quantities, priced on their own line.
  3. New modules, each with its start date and term.
  4. A package migration map from each old entitlement to its new equivalent.
  5. AI entitlements, with the included amount, consumption basis and overage trigger.
  6. Services, support and optional items, each on its own line.
  7. A total that reconciles back to the lines above it.

Packaging and AI entitlements can change renewal economics, but the reviewed sources do not show every buyer facing the same increase. If the vendor says the contract grew, ask which lines account for it. A larger total can come from more users, modules or years, so it explains nothing alone.

Frequently asked questions

Can I renew a contract that already has a renewal in progress?

No. A contract with a renewal in progress cannot be selected for another renewal request, and a contract with a completed renewal no longer offers the Renew option.

Does a renewal sit under the original contract in the family hierarchy?

No. The renewed contract is a new record connected to the previous one through the renewal link, not a child of the original.

Can conversational search read a scanned contract?

Conversational search works on the content of contract documents. Optical character recognition (OCR) converts scanned contracts or PDFs into searchable, editable text within ServiceNow.

Do metadata and obligation extraction work on amendments?

They run on a request type once a use case mapping is configured for that type. Renewal requests are one such type.