OBLYTECH Logo
OBLYTECH Logo

Add a CI relationship in CMDB Group CI Relations

To add a CI relationship in CMDB Group CI Relations, use an account with evt_mgmt_admin, open the Event Management administration module, and create an entry with Base class, Relationship, and Dependent class. Submit the entry, then check its direction and the underlying CI relationships before assessing the resulting alert groups.

Understand the class relationship before adding the entry

CMDB Group CI Relations supports accurate alert group generation by defining a relationship for a CI class. Start with the class pair you want grouping to recognize. Write down the base class, the relationship description, and the dependent class as one readable statement. This makes a reversed direction easier to spot before it becomes a saved configuration.

A relationship between individual configuration items consists of a parent CI, a child CI, and a relationship type. The grouping form instead asks for classes. Treat these as separate review tasks: establish the intended class relationship, then inspect representative CI records to understand the actual connections beneath it. A class-level entry is not a substitute for checking those records.

For example, the grouping configuration can contain Oracle with Is Hosted On and Linux Server. It can also contain Oracle with Is Hosted On and Solaris Server. The same parent class and relationship may appear more than once. A second target class therefore does not automatically make an entry a duplicate.

Use a CMDB relationships diagram when the class names alone do not make the intended direction clear. Keep the explanation focused on the dependency that should matter to grouping, rather than drawing unrelated infrastructure into the review.

Add a CI relationship in CMDB Group CI Relations

The role required for this action is evt_mgmt_admin. Confirm that the person making the grouping configuration change has this role; permissions for editing individual CMDB relationships are a separate concern. The following navigation and labels apply to Brazil, so check them against your instance and release before starting.

  1. Navigate to All > Event Management > Administration > CMDB Group CI Relations.
  2. Click New to open the entry form.
  3. Set Base class to the class you are using as the starting point for the relationship.
  4. Set Relationship to the type that expresses the connection you intend to use.
  5. Set Dependent class to the other class in that connection.
  6. Review the three fields together, then click Submit.

Base class can act as the parent or child, depending on the relationship type. Dependent class can likewise occupy either position. Do not assign direction from the word “base” alone. Read the selected relationship from the perspective of the selected class and confirm that the resulting statement describes the intended infrastructure dependency.

Before submitting, compare the complete combination with existing entries. Review all three fields rather than searching for the base class alone. For a proposed Oracle hosting entry, distinguish the Linux Server target from the Solaris Server target. Record why the selected target is needed, the representative CI pair and the observed grouping result, so a later reviewer can separate an intended configuration decision from a data-quality or permissions problem.

Check the underlying CIs and relationship direction

Choose representative CIs from the classes involved and inspect their relationships. This is a validation recommendation: a correct-looking class entry is easier to assess when you can point to a real connection that matches it. Note the identities of the two CIs, their classes, and the relationship type shown between them.

Parent and child describe the relationship’s direction, not a general ranking of infrastructure importance. A Depends on relationship expresses that a problem or change in the child may affect the parent. Runs on describes a software application connected to its hosting hardware or virtual machine. Select the meaning that fits the connection rather than a label that merely sounds familiar.

If the expected connection is missing, investigate its source before adding it manually. Discovery can load relationships automatically, and imported data can also supply relationships. Establish whether the relationship should be maintained through that data source or through a deliberate manual change. Otherwise, the grouping investigation can drift into unplanned CMDB maintenance.

The CMDB relationship table guide provides context for inspecting stored connections. Keep a short comparison of the intended class pair and the observed CI pair. If they do not line up, resolve the difference before treating an alert-group result as evidence that the new entry is correct.

Separate grouping configuration from CI relationship editing

Creating relationships between individual CIs through the relationship editor requires sn_cmdb_editor, asset, or itil. Those roles apply to the relationship editor. The grouping entry itself is listed under evt_mgmt_admin, so check that role for that step. Assign work according to the action each person needs to perform.

In the relationship editor, selecting Use suggested relationship starts with a relationship type and then suitable CIs. Without that selection, the workflow starts with the second CI and then the direction and type. In either approach, inspect the resulting parent and child before saving. The order of selection should not become a shortcut for deciding what the dependency means.

The editor’s downstream view places the base CI as parent, while the upstream view places it as child. These views can help diagnose a direction mismatch when reviewing existing connections. For the broader maintenance workflow, use the guide to creating, editing, and deleting CI relationships.

Apply access controls to the CI Relationship table, cmdb_rel_ci, and the editCIRelations operation on the * table when configuring CI relationship security. A permissions problem during CI inspection should be investigated separately from the contents of the grouping entry. Changing class selections does not address an access-control problem.

Review suggested relationships and assess the result

The sa_analytics.agg.query_cmdb_suggested_relationship_enabled property supports using suggested relationships to further enhance alert grouping. Include it in the configuration review when that behavior is relevant. The property is enabled by default, so record its current value before changing anything. Do not assume a different value because a group did not appear as expected.

Suggested class relationships identify relationship types appropriate for a CI class. Their definitions are held in Suggested Relationship, cmdb_rel_type_suggest, and can be managed through Configuration > Suggested Relationships or CI Class Manager. Distinguish this class guidance from the specific CI connections you inspected and from the Event Management entry you submitted.

For validation, compare a representative alert-group outcome with the dependency you intended to express. Record which CIs were involved and why you expected their relationship to matter. Treat the outcome as a check to investigate, rather than assuming that submitting one entry establishes the cause of a later grouping change.

If the result is unexpected, revisit the saved class pair, relationship direction, actual CI connections, and relevant property setting in that order. Keep observations separate from proposed fixes. This gives the next investigator a reproducible starting point and reduces the chance of changing several inputs before understanding which one mattered.

For help planning this work, see ServiceNow implementation.

Questions about adjacent relationship controls

Why might the CI relationship editor be unavailable on a new instance?

Starting with Brazil, the editor is being prepared for future deprecation. It is hidden and no longer activated on new instances, while existing use remains supported. Unified Map in CMDB Workspace provides the newer relationship-editing experience. This affects the inspection workflow, so establish which experience your administrators use.

Can Service Mapping endpoint relationship types connect ordinary CIs?

Implement End Point To:Implement End Point From, Use End Point To:Use End Point From, and Applicative Flow To:Applicative Flow From are reserved for Service Mapping endpoints. They cannot be used as relationship types between two CIs in the relationship editor. Choose a type appropriate to the actual connection.

Does viewing CI relationships require another role when the Table API ACL is active?

When that ACL is inactive, the viewing roles are sn_cmdb_editor, asset, or itil. When it is active, viewing also requires snc_platform_rest_api_access. Check the ACL state when one administrator can inspect a relationship and another cannot, rather than assuming the relationship data differs.

Should an identification dependency be deleted during troubleshooting?

Dependent relationships help the Identification and Reconciliation Engine identify dependent CIs and should not be directly deleted. For non-dependent relationships, Relationship Sources can provide source and scan information when tracking is enabled. Review ownership and identification implications before choosing deletion as a correction.

Will Relationship Sources automatically contain full tracking details?

The sys_rel_source table does not populate automatically by default, to avoid excessive IRE load. The glide.identification_engine.populate_sys_rel_source property controls that behavior. An empty tracking record set therefore needs interpretation; it does not by itself establish that a connection has no maintaining source.