OBLYTECH Logo
OBLYTECH Logo

CMDB Alerts and Their Resolution

ServiceNow CMDB alerts can be investigated by checking the configuration items behind a group, inspecting their relationships, and reviewing the properties that control correlation. Start with the group’s dependency view, distinguish a shared infrastructure fault from an incorrect grouping, then validate the affected components before treating the alert investigation as complete.

Start a ServiceNow CMDB alerts investigation with the group

CMDB based alert grouping in Event Management organizes alerts using relationships between configuration items, or CIs. Related alerts can appear together because their CIs share an infrastructure or application connection. You will find these groups in the Express List inside Service Operations Workspace, where each one lists its correlated alerts. Treat that connection as a lead for investigation rather than proof of a particular failure.

For each investigation, record the alerts involved, the associated CIs, the suspected common component, and the symptom each team is seeing. Keep a working record of the alerts, associated CIs, suspected common component, and each symptom. It helps distinguish a grouping question from an infrastructure fault before someone changes correlation settings.

Consider a physical server and the virtual machines it hosts. A server hardware failure can generate alerts for both the host and its VMs. Hosting and containment relationships can bring those alerts into one group. Investigate the shared host while monitoring its dependent VMs, instead of assigning disconnected investigations without the common context.

If the CI terminology is unfamiliar, begin with the plain-language guide to ServiceNow CMDB. For this investigation, the key question is which recorded connection explains why two alerts belong together.

Open the Dependency map and trace the connection

For the procedure to view the Dependency map for CMDB alerts, the required roles are listed as evt_mgmt_user, evt_mgmt_operator. Check access for this specific action before treating an unavailable view as a correlation failure.

  1. Navigate to All > Event Management > All Alerts.
  2. Search for the CMDB group and open a CMDB group alert.
  3. Scroll down and select the Activities tab.
  4. Look for the grouping message that explains that alerts were grouped because of CI relationships.
  5. Select Open Dependency Map for CMDB Group Alerts to inspect the dependency view.

The map shows connections between CIs within the alert group. A CI outside the group can still appear on the map when it links two or more alerted CIs, so keep it in view when tracing the route. Do not discard an intermediate component merely because it has no alert in the group: its relationship can explain the route between affected components.

Work through the route one connection at a time. Compare the represented dependency with the environment you are investigating. If the connection looks wrong, capture the two endpoint CIs and the relationship involved before requesting a correction. The CMDB relationships diagram guide provides related context for interpreting that topology.

Use Link View to distinguish direct and indirect connections

Link View shows how attributes of alerts in a CMDB-based group connect. Each colored tag stands for a CI or another environment item linked to one of the alerts in the group. CMDB grouping considers topology proximity alongside alerts occurring within a time frame; a shared group does not necessarily mean a direct connection between the alert CIs.

Use the legend to interpret the connections. A solid line marks attributes shared by one or more alerts; a dotted line means they are linked by the group criteria. Hover over a node to see its tag name, class, severity, alert count, and, when applicable, whether it is primary, secondary, or a probable cause. You can move nodes to focus on an area, but refreshing the alert group returns them to their original positions. Record the route you reviewed before refreshing so the display change is not mistaken for a topology change.

Compare the group’s apparent scope with the dependency route. Decide whether the alerts point to one shared component, a chain of dependencies, or a relationship that should not influence grouping. Record which interpretation fits the observed symptoms instead of choosing a root cause from an alert’s position in the view.

For an indirect connection, write down what would make the grouping reasonable. For example, the same infrastructure component may sit between two alert CIs, while the symptoms point to different operational owners. Ask those owners to compare observations before deciding whether the common dependency explains the incident. This is an investigation step, not a recommendation to change the topology to fit the first hypothesis.

Check the properties behind missing or oversized groups

The following property behavior is based on Brazil; check the settings on your instance and release before changing them. Capture current values and agree on a test case first. This gives the team a baseline for deciding whether a change improves grouping.

Confirm correlation and the permitted distance

sa_analytics.agg.query_cmdb_correlation_enabled With this property on, grouping can use CI relationships when it aggregates alerts and creates CMDB groups. When an expected group is missing, include this property in the configuration review rather than assuming the dependency map alone establishes eligibility.

sa_analytics.agg.query_cmdb_graph_walk_nodes controls the maximum number of enabled relationships traversed when forming a group. A setting of 3 permits grouping within three hops. This setting affects the relationship types used for aggregation, Values above 4 can slow the alert aggregation job, so weigh that cost before raising the setting.

For a group that seems too broad, count the relevant connections before recommending a smaller value. For a missing connection, inspect the path before recommending a larger one. Increasing reach can include additional dependencies; it does not establish that the recorded relationships reflect the environment.

Determine whether all relationship types are included

evt_mgmt.related_cis_get_all_relation_types controls whether grouping uses all relationship types. For new users, the default is true. Setting it to false enables relationship filtering. In that filtered configuration, a relationship absent from CMDB Group CI Relations [em_suggested_relation_type] is not considered for alert aggregation.

sa_analytics.agg.query_cmdb_suggested_relationship_enabled controls use of suggested relationships in that table and is enabled by default. Review both the switch and the relevant relationship entries when the expected topology connection is missing from a group. The CMDB relationship table guide supports the related data investigation.

Review hosting, containment, and application flow

For advanced filtering, evt_mgmt.related_cis_use_containment_rules applies host-containment rules from the Metadata Editor. evt_mgmt.related_cis_use_hosting_rules applies hosting rules. Both are enabled by default; the hosting property is hidden and does not exist as an instance property until added for a change.

sa_analytics.agg.ignore_cmdb_applicative_flow, when true, prevents grouping based on applicative flow relationships in application services. It is also hidden and enabled by default. A microservice dependency investigation should therefore distinguish the desired grouping design from the instance’s current application-flow setting.

Check retained relationship graphs

Event Management stores a related-CI map for each processed CI in Event Management CI Graph Reuse [em_ci_graph_reuse]. The sa_analytics.agg.query_cmdb_graph_reuse_period property controls retention and defaults to one day, or 86,400 seconds. Setting the value to zero disables graph storage for advanced configurations. The property is not present in an instance by default; add it before changing that default. When investigating a missing or unexpected relationship, record the configured retention period with the grouping settings and test case.

When the disagreement concerns which dependencies should drive operations, define the intended behavior before changing several properties. For help planning this work, see ServiceNow implementation.

Resolve the fault and validate the grouping separately

Use two parallel questions during remediation: has the affected component recovered, and does the alert group represent the intended dependencies? Grouping related symptoms helps investigation, but a change to grouping configuration is not evidence that a server or application fault has been repaired.

Pair each remediation with the topology it touches. If a shared database slows several applications, the database owner and the application owners should work the same alert group together. When a host fails, the host team repairs it, and someone then checks each VM the host carried before the group is closed.

To finish, ask the responsible teams to validate their affected components and record unresolved symptoms. If the remaining problem is an incorrect CI connection or grouping boundary, give that issue a separate owner and acceptance case. Use the CMDB troubleshooting guide for the broader data investigation.

Before accepting a configuration change, repeat the agreed grouping case and compare the resulting scope with the baseline. Record which relationship should connect the alerts and which connection should remain excluded. Written down this way, the review can show whether the group now matches the topology, which a general request to reduce alert noise cannot.