The ServiceNow CMDB health dashboard scores your configuration items (CIs) on completeness, correctness and compliance, so you can see which records you can rely on and which ones will mislead a change, an incident or a report. Treat each red score as a specific fix rather than a general clean-up: find the CIs behind it, group them by owner and cause, and fix the group that blocks the most work first.
What the completeness, correctness, compliance and relationship scores measure
Completeness asks whether the fields the system dictionary marks as mandatory, and any fields set as recommended, are filled in on each CI. A server record with a name and nothing else is incomplete, even when the machine itself runs well. Correctness is built from three metrics: orphan CIs, stale CIs and duplicate CIs. A CI counts as stale when it has not been updated within the effective duration in its staleness rule, which the base system sets to 60 days for the Configuration Item class. Old values such as an address or a previous owner are not measured as a metric of their own.
Compliance comes from CMDB audits, which compare field values with the expected values in their template or scripted audit, so a database CI and a network switch can be held to different audits. The compliance KPI needs audit activated before it shows any results. Relationship scores check for duplicate relationships, relationships missing a parent or a child CI, relationships where either end is a stale CI, and whether relationships follow suggested, containment and hosting rules. You can choose which KPIs and metrics the dashboard includes, so read it on your own instance before you build reporting on top of it.
How stale, orphan and duplicate CIs get found
Stale CIs are records that have not been refreshed within the window your data policy allows. A record goes stale when scanning stops reaching its host, when an import fails without anyone noticing, or when the asset was decommissioned and the record was never retired. Orphan CIs fail an orphan rule. That rule checks for required attributes, and for CIs that have no relationships or lack specific ones. They inflate counts but cannot answer a question about a service, so a service owner usually spots them first when an impact report comes back empty.
Duplicate CIs are the same real-world item recorded more than once, often under slightly different names or from two sources. Duplicates inflate totals and split the history of one asset across two records. Before you trust a duplicate count, confirm which attributes your instance uses to match CIs, because identification rules decide what counts as a duplicate. For how these records should be classed and owned under a common service data model, see CMDB, CSDM and ITAM ownership.
Turning red scores into remediation work
A score on its own does not change any data. The useful step is to group the failing CIs by owner, by class and by the rule they break, then decide who fixes each group. Where your release supports it, de-duplication tasks can track the fix for duplicate CIs, so that fix is recorded instead of remembered. Where it does not, export the list and assign the groups through the work tracking you already use. Ownership is a governance question before it is a technical one, and how ownership and data quality governance work is covered on its own page.
| Signal | Usual first move |
|---|---|
| Low completeness in one class | Agree the mandatory fields for that class, then fill the gaps with the owning team |
| Correctness falling after changes | Find the change path that skipped the CMDB and close that gap first |
| Stale records | Confirm whether the data source still reaches the host, then retire what is truly gone |
| Orphans | Link each one to the service it supports, or retire it if nothing uses it |
| Duplicates | Merge against the trusted record and fix the matching rule that allowed the copy |
Work the groups in order of impact. Orphans in a business-critical service usually matter more than a retired test host with a worse score. If you would rather have someone review the first pass for you, the ServiceNow health checks and audits page describes how a review of this kind is scoped.
Scheduling, thresholds and trend tracking
Scores come from scheduled jobs, so the dashboard is only as current as the last run. Match the frequency to how fast your estate changes. A stable estate may be fine with a weekly run, while a fast-moving cloud estate needs more frequent checks. Each metric has a failure threshold, the number of CIs that can fail its test. When that number is reached, health processing stops for the metric for that cycle. When a metric reaches its failure threshold, review the rules behind it against your current baseline first, because strict rules on day one teach people to ignore the results. For the wider set of measures to report beyond this dashboard, see the CMDB measures worth tracking.
Trend tracking matters more than any single reading. Keep a record of the scores after each run, or export them, so you can see direction. A completeness score that climbs after a clean-up is evidence the work is landing. A score that drops back within a month points to a process that keeps creating the same bad data, and the fix belongs in how records get created, not in another clean-up round. The article on common hurdles in a ServiceNow CMDB program looks at why these patterns tend to repeat.
The five scoring jobs ship disabled and need switching on
In the base system, the five scoring jobs are disabled by default, so no completeness, compliance, correctness or relationship score is calculated until you enable them. The five jobs are four score calculations plus a relationship compliance processor. Enable the job for each KPI you want measured. The role required is sn_cmdb_admin or admin.
Go to All > Configuration > Health Preference, choose Scheduled Jobs, then open the job, tick Active and set Run to a recurring schedule or On Demand. Leave the job script untouched, since changes to it can produce unexpected behavior. For background on scheduled jobs in general, see how a scheduled job works.
Three system properties change what the scores count
Three properties change what the dashboard counts, who it shows as owner and how long processing can run. Their defaults are false, managed_by_group and 120 minutes. Two sit under All > Configuration > Health Preference, System Properties, and the audit-only setting is found in the System Property table instead.
With glide.cmdb.health.src.cmdb_health_audit_only at false, a CI that Discovery marks as stale counts as stale for the correctness KPI, even when the CMDB health audit did not reach that finding. Set it to true to limit the dashboard to audit results. The attribute named in glide.cmdb.health.ci_ownership_field should reference the user or user group table, so if your teams record ownership in a different reference field on the CI, point the property at that field. For the ownership model, see how CMDB ownership is modeled.
glide.cmdb.health.metricProcessor.maxRunningTime caps the minutes one metric processor can run in each cycle. If a metric runs past it, processing halts until the next scheduled job. Keep it at 120 or below.
How do you fix a broken ServiceNow CMDB?
Fix the way records enter the CMDB before you clean the records already in it. Pick a small set of classes the business relies on, find which ingestion paths and identification rules create bad data, decide which source may update each attribute, then remove duplicates and retire dead CIs in capped batches with a test after each one.
Start with the sources that keep writing bad data
Discovery, Service Graph Connectors and imports can all create or overwrite CIs. Take a sample payload from each source and check how it is identified. If the identification and reconciliation rules stay as they are, a clean-up is temporary, because one integration still creates new records under a slightly different name.
Limit the first pass to a scope you can finish
Choose three to five principal classes that the services you report on depend on, and no more than two ingestion sources. Write down what sits outside the pass, such as whole-estate cleanup or mass deletion.
Work through the remediation in this order
- Baseline the scope. Record completeness, correctness and compliance for each class, plus the CI count behind each failure. Leave the rules unchanged so the baseline stays comparable.
- Build a root-cause register. Give each failing group one cause, such as an ingestion path that skips the identification rules, a mapping that writes to the wrong field, or a decommissioned asset.
- Write a source-authority matrix. For each key attribute, name the one source allowed to change it.
- Correct the ingestion path, then test it. Run sample payloads through the changed rules before any live run.
- Remove duplicates in approved batches. Merge each duplicate into the trusted record, log the merge, and confirm the next scheduled run does not create a new copy.
- Retire dead CIs through a lifecycle policy. A retired CI stays visible to CMDB processes, whereas archiving or deleting it brings separate retention and recovery effects. Check dependencies first, because a retired host may still be the only link in a service map.
What to ask for from anyone helping you
- A root-cause register that names a cause for each failing group.
- Before and after scores with the rules, job schedule and CI population behind each one.
- Test evidence showing that no unexplained duplicates were created.
- Caution with any promise of a fixed health score, since a score moves with configured rules and enabled jobs as well as with the data.
Failure points to check early
- Discovery coverage stays poor while the MID Server looks healthy. Network reachability does not prove Discovery can authenticate to a target. Test representative hosts and build a reachability and authentication matrix.
- Connector imports succeed but the CIs are wrong. An import that completes still needs its class mapping and identification checked.
- Correct values keep getting overwritten. Two sources compete for one attribute, so name one authoritative source.
Frequently asked questions
Do I need automated discovery to use the health dashboard?
No. The dashboard scores whatever data is in the CMDB, whether it came from discovery, an integration, an import or manual entry. Without discovery, records refresh when an integration, an import or a manual update touches them, so staleness becomes the score to watch most closely. Plan a manual or import-based refresh cycle and set the staleness window to match it, or many records may show as stale from the first run.
Who can see and act on the health dashboard?
Access depends on the roles and settings in your instance, and the roles that open the CMDB views vary by release and configuration. Confirm access with a test user before rollout. Remediation work should go to the people who own each CI, not only to the CMDB administrator, because they are the ones who can confirm what is really in place.
Can the scoring be tuned?
The schedule of each job and the rules behind each check can be adjusted, but what is configurable depends on your release and installed plugins. Change one thing at a time, note the reason, and compare scores before and after, so you can tell a real improvement from a rule change that moved the numbers. Changing the rules does not fix any data by itself.
Which score should I fix first?
Start with the score that blocks the most work. For most teams that means orphans and stale records in the services that matter most, because they break impact analysis and change planning. Clear those first, then move to completeness and correctness for the classes you report on. The ServiceNow CMDB guides and services hub lists the other pages in this section if you want the wider picture.