Cloud Discovery Workspace is where a discovery_admin builds schedules that find cloud resources through a service account and run on a MID Server. Errors and anomalies from those runs are worked in Discovery Admin Workspace Diagnostics. Cloud Discovery Workspace is now deprecated and no longer supported, so new work belongs in Discovery Admin Workspace.
What the workspace is for
Cloud Discovery Workspace gives a discovery administrator a guided way to point ServiceNow at a cloud provider and have it record what lives there. A schedule holds the settings for a cloud discovery run. A schedule discovers cloud resources through a service account; VMware can instead target the vCenter server IP address.
The cloud side of discovery sits in what ServiceNow calls the cloud metadata layer. That layer is an inventory of structural components such as virtual machines, networks and subnets, plus the relationships between those resources. Beneath it is the operating system layer, which covers installed software, active services, running processes and system configuration. The workspace schedules described here work at the cloud metadata layer through pattern-based Cloud Discovery. OS-level detail comes from IP-based Horizontal Discovery or from Agent Client Collector for Visibility Content. Service Graph Connectors add a limited OS-level view.
The providers covered are AWS, Azure, GCP, IBM Cloud, Oracle Cloud Infrastructure and Alibaba Cloud.
Where the workspace sits next to Discovery Admin Workspace
Two workspaces matter here, and they overlap. Discovery Admin Workspace is the central place to monitor and track discovery, with schedules, diagnostics, tuning and anomaly detection. Cloud schedules can also be created there, which matters because of the direction ServiceNow has set.
Cloud Discovery Workspace is deprecated: ServiceNow no longer supports it or allows it to be newly activated. Discovery Admin Workspace is the current experience for the same functionality, so an instance still running Cloud Discovery Workspace should plan the move. In practice, a team may therefore build a cloud schedule in one workspace and monitor it in the other, or do both in Discovery Admin Workspace. Access to Discovery Admin Workspace is through Workspaces > Discovery Admin Workspace, and its Schedules page counts IP-based and Cloud schedules together on the Overview, and has separate IP-based and Cloud discovery tabs for each type.
What you need before creating a schedule
Four things have to be in place.
- The role. The discovery_admin role is required.
- The application. Cloud Discovery Workspace must be installed. Installing it requires the admin role.
- A MID Server. At least one validated MID Server needs a status of Up. It must be able to reach the IP ranges to be discovered, and it must be configured with the Cloud Management capability.
- Credentials. Credentials for the service accounts to be discovered must already exist in the ServiceNow AI Platform.
Pattern-based discovery is the default. If the latest Discovery and Service Mapping Patterns application is missing, discovery fails and prompts you to install it or to migrate from CAPI-based discovery.
Creating a cloud discovery schedule step by step
The schedule procedure runs through a wizard. It starts at Cloud Discovery Workspace > Cloud Discovery > Dashboard.
- Select New discovery schedule.
- Choose the cloud provider on the Choose the provider form, then select Next.
- Select an existing service account or create one. The optional Test account button checks the connection. For a management account you can discover all member accounts, which is the default, or pick specific ones.
- Select datacenters. You can take all datacenters attached to the service account, or choose specific ones from the Select the data centers drop-down.
- Optionally enable VM and attribute discovery, then choose a MID Server or MID cluster. If you are unsure, Auto-Select MID Server is available.
- Build the schedule: choose an execution frequency, set a start time, optionally set criteria for cancelling the discovery, and activate the schedule.
- Finish with either Finish and run, which saves the schedule and runs it immediately, or Finish, which saves it and runs it according to the frequency.
VMware is the exception to the service account step. A VMware schedule can run without a service account by targeting the IP address of the vCenter server.
When subaccounts or datacenters do not appear
If subaccounts are missing from the list, select Refresh or run the account validation again. The same applies to datacenters, where the Refresh Datacenters option or a repeat validation brings them in.
Monitoring schedules on the Schedules page
The Schedules page in Discovery Admin Workspace is reached through Workspaces > Discovery Admin Workspace > Schedules.
Two actions are available from any tab. Quick Discovery runs an IP-based discovery in a few steps, and New Discovery lets you choose between IP-based, Cloud and Certificate discovery.
The Overview tab holds the visual summary:
| Visualization | What it shows |
|---|---|
| Active schedules | Total IP-based and Cloud schedules that are enabled and recur |
| Schedules completed without anomalies | Completed schedules with no anomalies in the period |
| Schedule trends | A line chart of events over a period, with links to discovery status and anomalies |
| Schedules by location | A map; selecting a region shows its schedules |
| Schedules with anomalies | A bar chart of failed, low-yield, high-error and slow schedules |
| Errors by category | A donut chart of error counts by category |
The Discovery status tab shows the status of scheduled discoveries. Selecting a status number opens the status details, which cover devices found, errors and anomalies.
Reading anomalies
Anomaly detection rates schedules by severity. A schedule that failed to run is Critical. A schedule with a low CI discovery rate is Major. A schedule with a long run time or a high error count is Minor. Anomalies are flagged when run time, error count or CI counts deviate from the average by a threshold set on the Settings page (default 20 percent).
On the Anomaly Detection tab of the Diagnostics page you can filter by schedule, by severity (Critical, Major, Minor) and by anomaly type: Failed schedule, Low CI discovery rate, Increased error count and Long run time. From Discovery Admin Workspace v1.11.0, anomaly detection needs at least five CIs to trigger. The tab appears when anomaly detection is enabled.
Working errors in Diagnostics
The Diagnostics page covers errors and anomalies in IP-based and Cloud Discovery schedules. Its path is Workspaces > Discovery Admin Workspace > Diagnostics.
The errors list
The errors list covers errors from all discoveries. In the Zurich and Yokohama releases, rows could be turned into tasks or ignored, and a row with a task showed the task name and priority. The newest documented release does not describe error tasks. The Zurich and Yokohama releases let you narrow the list by:
- schedule, using a drop-down
- error name, using the search bar
- category: CMDB, Configuration, Credentials, Internal or Network
- whether the error has a task, without a task, or either
Sort options differ by release; the newest documented release sorts by refined code, category, severity and occurrences. In the Zurich and Yokohama releases, selecting a Total Errors number opens the Error Stats page, which shows instructions, a related knowledge base article when one exists, and the task number when a task is attached.
In the Zurich release, the Action on selected list offered these actions for individual IP addresses: ignoring the error, retrying discovery, adding the address to the global exclusion list, or checking Shazzam port status.
The layout of Diagnostics changes between releases of Discovery Admin Workspace, so expect the exact tabs on your instance to differ from a description written for another version. The errors list and the Anomaly Detection tab are the parts to look for first.
How cloud discovery fits the wider discovery picture
A cloud schedule is one of several ways to collect cloud data, and knowing the others helps when a result looks thin. Pattern-based Cloud Discovery and Service Graph Connectors both produce the cloud metadata layer. Service Graph Connectors for AWS, Azure and GCP need read access to the provider’s system, and they do not need OS credentials or MID Server firewall access.
Pattern-based Cloud Discovery and IP-based Horizontal Discovery need OS and application credentials and firewall access from a MID Server. Agent Client Collector for Visibility Content works differently again. It does not require OS-level credentials and can be deployed with or without a MID Server, using system accounts, local service accounts or Microsoft gMSA. It covers AWS, Azure and GCP.
The practical reading is that a schedule built in the workspace tells you what the provider says exists. Installed software, running processes and system configuration need one of the OS-layer methods on top.
Does a Cloud Discovery Workspace purchase also cover cloud provisioning, governance or cost optimization?
Not by default. The workspace is a discovery tool for finding and recording cloud resources, so provisioning, governance and cost optimization are separate questions. Licensing documentation reviewed in October 2026 places Cloud Discovery Workspace within the Visibility subscription, and as of November 2026 the contract and quote decide what you are entitled to.
Four separate jobs under one cloud label
Four different jobs get sold under the word cloud. Discovery finds resources in a provider account and records them as configuration items. Provisioning creates resources. Governance checks that resources follow your rules. Cost optimization compares spend with usage. A discovery schedule does only the first job.
What the discovery entitlement counts
The discovery entitlement is a subscription counted in units. The contract determines which resource categories and ratios apply, so a raw count of CMDB rows is not the licensed quantity. As of September 2026, consumption statistics use a 90-day daily average.
Connectors add to the count too. The AWS Service Graph Connector, as documented in September 2026, requires an applicable ITOM Visibility or Discovery subscription, and newly managed eligible resources can increase consumption. As of September 2026, a CI managed by both Discovery and Service Mapping within the same product is deduplicated, so ask how other overlaps are counted.
Why a schedule does not provision
Provisioning means creating or changing resources, such as building a virtual machine or subnet from a request or template. A schedule only reads what the provider reports and records it. None of the steps in the wizard creates a resource, and that is the test to apply when a quote says a discovery line covers provisioning.
Governance and cost data sit elsewhere
Governance needs policy definitions first: who owns a resource, which tags must exist, which regions are approved. Cost optimization needs billing or usage data joined to those resources. A schedule collects neither. The common failure is presenting the discovered inventory as the governance or cost report, when it only answers what exists.
What to ask for before you sign or renew
Compare entitlement lines, not product names. As of October 2026, Discovery is an entry-level subset of Visibility, so a Discovery line may cover less. Ask for these in writing:
- The quote with each SKU, package name and underlying entitlement, reconciled to the licensing schedule.
- The resource categories and ratios that apply to the cloud accounts in scope.
- Which connectors the subscription covers, and how consumption grows with managed resources.
- Current subscription units on your instance and the averaging period used.
- Renewal and expansion terms for adding accounts, regions or providers.
- Whether the entitlement carries over when you move from Cloud Discovery Workspace to Discovery Admin Workspace.
As of November 27, 2026, Advanced and Prime pricing requires a quote, so the written quote is the only price to compare. Budget governance and cost tooling as separate lines in that quote.
Frequently asked questions
Which role do I need to create a cloud discovery schedule?
The discovery_admin role. Installing the Cloud Discovery Workspace application needs the admin role.
Do I need a MID Server?
Yes. At least one validated MID Server with a status of Up and the Cloud Management capability is required, and it must reach the IP ranges to be discovered.
What does Finish and run do?
It saves the schedule and starts it immediately. Plain Finish saves the schedule and runs it according to the frequency you chose.
Why are my datacenters or subaccounts missing from the wizard?
Use Refresh or Refresh Datacenters, or run the service account validation again.
Is Cloud Discovery Workspace being retired?
Yes. It is deprecated: ServiceNow no longer supports it or allows new activation, and Discovery Admin Workspace is the current experience for the same functionality.
What do the anomaly severities mean?
Critical is a schedule that failed to run, Major is a low CI discovery rate, and Minor is a long run time or a high error count.