To configure Discovery for hosts with attached storage, prepare the UNIX or Linux host account, add its credentials to the Discovery Credentials table, create a Discovery Schedule for each host IP address, and run network discovery. The configuration requires discovery_admin. Assess elevated host privileges and, for NAS or SAN connections, prepare the SMI-S Provider and CIM credentials.
Configure Discovery for hosts with attached storage: preparation
Discovery can collect information about a UNIX or Linux host and its attached storage. Start with the host whose storage information you need to record. Identify its operating system, the IP address intended for discovery, the account Discovery will use, and whether the host also connects to a NAS or SAN storage array. These details separate the host configuration work from the additional array preparation.
Build a short worksheet for the initial host. Record who owns the operating system account, who can approve its permissions, and who manages any connected storage array. This is a planning recommendation: it gives each configuration dependency an owner before a discovery run exposes an access gap. Keep passwords out of that worksheet; record the credential owner and purpose instead.
Use one representative host for the first validation. Choose a system whose attached storage the administrator can independently describe. A known baseline lets you compare the discovered information with the intended scope. Expand after that comparison gives you a clear acceptance decision. For the broader host setup, see configure Discovery for UNIX or Linux hosts.
Separate discovery_admin from permissions on the host
The role required for this UNIX or Linux attached-storage configuration procedure is discovery_admin. Arrange that role for the person performing the ServiceNow configuration. Host access is a separate dependency: the account used by Discovery needs permissions on the machine being examined. Assigning an instance role does not establish that operating system account’s access.
Elevated privileges on the host are an optional preparation step. Assess whether the Discovery account needs elevation to collect the intended information, and have the host administrator review that requirement. Avoid treating a successful account login as acceptance of the full storage-discovery scope. Authentication and permission to inspect the required information are different checks.
Use the intended Discovery account during the host access review. Record any approved elevation, the reason for it, and the responsible administrator. If the organization declines elevation, document that decision and validate the resulting coverage before declaring the setup complete. The procedure does not supply a universal command list or a single privilege policy for all UNIX and Linux systems; check the requirements on your instance and release.
Add credentials and map them to the intended host
Add credentials on the ServiceNow instance in the Discovery Credentials table. Prepare those records after identifying the host account, so the instance configuration and the administrator’s access review refer to the same identity. Review the account name and intended target together rather than letting separate teams work from different host lists.
Before entering credentials, agree how account changes will be handled. A renamed account or a changed access arrangement should trigger a review of the discovery configuration. Treat this as an operating practice for maintaining the setup, rather than as an assumption about automatic credential synchronization. A configuration can look complete while its underlying account has changed.
For a first run, keep a clear record of which account was intended for the selected host. If the outcome is incomplete, that record helps the administrator investigate the access that was actually planned. See credentials required for host discovery when preparing the account and instance work together.
Create the schedule and decide whether to add a behavior
Create a Discovery Schedule for each host IP address in scope. Compare the schedule’s intended target with the host worksheet before running it. This check matters when a storage investigation has generated several addresses: the page’s procedure starts with host discovery, so establish which address represents the host you mean to inspect.
An optional behavior can improve the efficiency of the initial port-scanning phase, Shazzam. That behavior uses a functionality definition with a wbem port probe. Treat this as a deliberate configuration choice. The presence of attached storage does not, by itself, mean that you must add the behavior before attempting a discovery run.
- Confirm the host IP address against the agreed discovery scope.
- Create the Discovery Schedule for that address.
- Decide whether the optional behavior belongs in this configuration.
- If using it, verify the functionality definition includes the wbem port probe.
- Keep a record of that decision alongside the initial run results.
Separate the reason for adding the behavior from the reason for granting host access. The behavior concerns the initial scan’s efficiency; the permission review concerns what the host account can inspect. Keeping those decisions distinct makes an incomplete result easier to investigate because you can revisit the relevant configuration dependency.
Prepare additional access for NAS or SAN connections
If the host also connects to a NAS or SAN storage array, set up the SMI-S Provider and CIM credentials. Include this branch in the scope review before scheduling validation. Knowing that the host has storage attached does not tell you whether this additional preparation applies; establish how the storage is connected with the responsible administrator.
Give the storage administrator a precise question: does the selected host connect to a NAS or SAN array, and who owns the provider and CIM credential preparation? Record the answer against that host. This avoids an ambiguous handoff in which the host team believes storage access is complete while the array team has received no configuration request.
For help planning this work, see ServiceNow implementation.
Keep the array dependency visible in the acceptance record. A completed host account review should not close a separate provider or credential task that remains unresolved. Where several teams share responsibility, the Discovery implementation roadmap can help organize the wider sequence of work around this host-level configuration.
Run network discovery and review the result against the scope
Run network discovery after preparing credentials, the host schedule, and any applicable storage-array dependencies. Review the result against the baseline collected before configuration. Ask two separate questions: did the run identify the intended host, and does the collected storage information satisfy the agreed requirement? A run’s completion alone is a weak acceptance criterion for a storage-specific task.
If the result is incomplete, work through the configuration in dependency order. Recheck the target address, the intended account, its access arrangement, and the credentials entered on the instance. If the host connects to a NAS or SAN array, include the SMI-S Provider and CIM credentials in that review. These are investigation checkpoints, not a claim that one setting explains all missing storage information.
Change one dependency at a time where possible, then compare the next result with the earlier baseline. Record what changed and which gap the change was intended to address. This gives the team evidence for its acceptance decision and avoids repeatedly changing both host permissions and scan behavior without knowing which adjustment mattered.
Close the initial configuration when the named owner accepts the observed coverage for the selected host. Record outstanding gaps explicitly before extending the scope to additional hosts. Use the same review questions during expansion, while allowing each host’s access and storage connection details to differ.
Questions about handing over attached-storage Discovery
What should a handover record contain?
Include the selected host, its intended discovery address, the account owner, the schedule reference, the accepted storage scope, and unresolved dependencies. Record who accepted the result. Keep the record focused on decisions and ownership so a later administrator can understand why the configuration was considered ready.
How should an exception be described?
Name the missing information, the affected host, the owner investigating it, and the next decision needed. Avoid closing an exception with a vague statement such as access issue. A precise description lets the host and storage teams identify their respective work without repeating the initial scoping discussion.
What should trigger a new acceptance review?
As an operating practice, review coverage after a relevant account, permission, target-address, or storage-connection change. Compare the new result with the previously accepted baseline. This keeps the acceptance decision tied to the current configuration instead of relying indefinitely on a successful earlier run.
How can two administrators compare their results fairly?
Agree on the same host, expected storage scope, and acceptance questions before comparing runs. Include the configuration decisions that differed between the attempts. Without that shared baseline, two successful runs may still represent different expectations about what information should have been collected.