OBLYTECH Logo
OBLYTECH Logo

Configure Cloud Observability event collection

To configure Cloud Observability event collection, create a standard webhook notification destination in Cloud Observability and connect it to your ServiceNow instance. Prepare a matching application service CI, add the service-name header, and select the destination in an alert notification rule. Then check event delivery, CI binding, and severity separately.

Prepare to configure Cloud Observability event collection

This integration sends Cloud Observability events into Event Management. The ServiceNow instance receives them through an inbound connector endpoint, while Cloud Observability holds the webhook destination and the alert notification configuration. Treat those as separate pieces of the setup: a saved destination still needs an alert that uses it.

The required ServiceNow role for this event collection procedure is evt_mgmt_integration.Download the Event Management Connector plugin from the ServiceNow Store before you start. The plugin is a prerequisite for this integration.The evt_mgmt_integration role applies inside ServiceNow. Set up the Cloud Observability side as a separate task. Check the controls on your instance and release before making configuration changes.

Gather the service name from Cloud Observability, the receiving instance details, and the authentication information for the connection. Decide which alert will exercise the integration and what threshold is appropriate for that check. Keeping this first configuration limited to one clearly identified service makes the result easier to interpret.

If the distinction between events and the wider management process is unclear, start with the Event Management overview. For this configuration, concentrate on getting the event into the receiving instance with the intended service identity.

Create the application service CI before the webhook

Cloud Observability service discovery is not supported by this integration.Services from Cloud Observability are not discovered automatically, so build the application service record by hand in cmdb_ci_service_auto before the first event arrives. Do not assume that sending the first event will create the service record for you.

  1. Navigate to All > Configuration > Application Service.
  2. Select New and enter the service name in the form.
  3. Use the same name that identifies the service in Cloud Observability.
  4. Set Operational Status to Operational.
  5. Select Next, then Done.

Type the name exactly as Cloud Observability shows it, including any hyphens, capital letters or punctuation. Do not adjust the name to fit a naming convention on the ServiceNow side, because the header will then fail to match.

Record the completed CI name before moving to the other platform. The webhook’s service-name header must match the CI name for binding. A descriptive webhook label cannot substitute for that match: the destination name helps you select a destination, while the header value supplies the service identity used for binding.Compare the intended service name with the saved CI name before you create the destination, so a naming mismatch surfaces before any alert is connected.

Build the standard webhook notification destination

In Cloud Observability, open Alerts from the navigation bar. Select the Notification destinations tab, choose Create a destination, and select webhook. Enter a recognizable destination label in Name. Choose a label that helps an operator distinguish the receiving instance and intended service.

In URL, configure the authenticated connection to the receiving ServiceNow instance. The inbound endpoint path is /api/sn_em_connector/em/inbound_event, with source=lightstep as the query parameter. The destination format includes the instance and authentication details. Verify those values against your intended receiving environment before saving.

Select New Header. In Headers, add service-name and set its value to the name of the application service CI you created. Check the header name and its value independently: one identifies the header the integration expects, and the other identifies the service.

The default URL format places a username and password directly in the address, so the saved destination effectively holds the credentials for the receiving instance. Before you paste the address, confirm that the account belongs to the team that owns the integration, and keep the finished address out of shared documents.

Click Create to save the destination. Capture its name in the change record so the alert configuration can refer to the correct destination without relying on memory. Keep authentication details out of ordinary handover notes; a destination name and receiving environment are enough to identify the configuration for review.

This is a push arrangement: Cloud Observability sends to the receiver when its alert configuration calls for a notification. The push connector guide provides the neighboring context if you are comparing this flow with other event sources.

Attach the destination to a Cloud Observability alert

Return to Alerts in Cloud Observability. Select Create an Alert and enter an alert name. Use a name that lets the person validating delivery identify the source alert without confusing it with the notification destination.

In Alert Configuration, define the threshold for the alert. Choose a condition whose meaning you understand and whose behavior you can observe during validation. A transport check is difficult to interpret if nobody can establish whether the selected condition actually occurred.

In Notification Rules, use the Send Notifications to fields to select webhook. Search for the name of the destination you just created and select it. Then select Save. Review the selected name before leaving the alert, especially when several destinations have similar labels.

The destination and the alert perform different jobs. The destination contains the receiving connection and header; the alert provides the threshold and notification selection. Review both records during handover so a later change to an alert does not leave the team guessing which service destination it should use.

For help planning this work, see ServiceNow implementation.

Check stream alert severity before acceptanceStream-based alerts arrive as Critical until someone changes the connector setting. That setting sits in Push Connector Configuration on the instance, so check it before accepting the first event. Make severity review a deliberate acceptance step so a technically successful delivery does not carry an unexpected operational priority.

  • 1 – Critical
  • 2 – Major
  • 3 – Minor
  • 4 – Warning
  • 5 – Info

Discuss the intended default with the receiving operations team before adjusting it. The question is what severity this source should deliver for stream based alerts. Do not treat a threshold change in Cloud Observability as evidence that the connector’s default severity has also changed.

The severity scale runs from 1, the most urgent, to 5, informational. Map the default to the response your operations team would actually take for a stream-based alert, because a Critical default raises every stream alert to that level until the setting changes.

Record the chosen value alongside the first validation result. This gives the next operator something concrete to compare with the received event. If further event processing needs review, keep that work distinct and use the ServiceNow event rules guide to examine that next stage.

Validate delivery and binding as separate outcomes

Plan the acceptance check around three observations: an alert condition occurs, an event reaches the receiving instance, and that event binds to the intended application service CI. Add the received severity to the same record. Seeing a notification destination in a list establishes configuration, but does not establish these outcomes.

If an event is missing, work back through the sending configuration. Check whether the alert condition occurred, whether the saved alert selects the intended webhook destination, and whether that destination points to the correct receiver with the intended authentication details. Change one suspect value at a time so the next observation has a clear explanation.

If the event arrives but does not bind as intended, compare the service-name header value with the application service CI name. Confirm that the manually created record is in cmdb_ci_service_auto. Transport and binding require different evidence, so avoid rebuilding the connection simply because the service association is wrong.

When you check binding, open the application service record in cmdb_ci_service_auto and compare its name with the service-name header value character by character, including capitalisation, spacing and punctuation. Binding happens only when the two match, so a stray trailing space is enough to leave the event unbound. Correct the header or the record, then wait for a new alert condition to produce a fresh event rather than rereading the old one.

If delivery and binding work but severity is unexpected, revisit the stream alert default in Push Connector Configuration. Preserve the successful delivery details while investigating the remaining issue. For a broader investigation after these checks, use the Event Management troubleshooting guide.

Before closing the change, ask the receiving operator to identify the service from the observed result rather than from the setup notes alone. If the association is unclear, resolve it while the sending alert and destination are still easy to trace. Keep a short record of any corrected value and the observation that justified the correction.

Does sending Azure Monitor or AWS CloudWatch alarms to ServiceNow also populate the CMDB with cloud resources, and what must be tested before any automatic closure?

No. Sending Azure Monitor or AWS CloudWatch alarms to ServiceNow creates events and then alerts in Event Management. It does not by itself create cloud inventory in the CMDB, so resources appear there only when a separate inventory source is configured and tested. Before any automatic closure, test fired and resolved transitions, duplicates, out-of-order messages and state feedback.

Why an alarm feed does not fill the CMDB

An alarm reports that a condition was met at a point in time. It may name the resource, but it does not establish the inventory and relationship data a CMDB needs. Cloud inventory comes from a separate configuration source, such as a Service Graph Connector, and Azure and AWS inventory coverage needs confirming for the release in use. As of November 2026, CloudWatch metric collection is a separate capability with its own plugin prerequisite.

Binding and closure both depend on payload identity

Carry the account or subscription ID, region, resource ID and an owner field in every payload. Binding happens on the alert, using the identifiers the payload supplies. Watch renamed or moved resources in particular: a recovery that no longer matches the original identity can leave the alert it should close open.

Tests to run before enabling automatic closure

Run each test on a non-production resource.

  1. Fire and recover. Trigger a real alarm, confirm its alert, then clear the condition and confirm the recovery closes that same alert.
  2. Duplicate delivery. Send the fired message twice and confirm there is one open alert.
  3. Out-of-order delivery. Deliver the recovery before the fired message and record what the alert looks like afterward.
  4. Malformed payload. Drop a required field and confirm the message is rejected visibly, not treated as a recovery.
  5. Suppression. Fire an alarm during an approved maintenance window and confirm the alert stays open if the condition persists after the window.
  6. Feedback loop. If closing an alert sends a state change back to Azure, confirm it happens once and does not raise a new alarm. Do not assume AWS alarm state is written back.
  7. Sample check. Compare closed alerts with the live alarm state. An alert closed while its alarm is still active is a false closure.

Measures to set before automatic closure goes live

Track false recovery and closure as a safety measure beside missed actionable alerts. Event-to-alert compression and grouping coverage cannot show whether a closure was correct. Limit automatic closure to alarm types whose recovery behavior has been tested.

Questions to put to the integration owner

  • Which ServiceNow release and Store app versions the integration was tested on.
  • Whether the Azure path uses the MID push option, and which team runs that MID server.
  • Whether CloudWatch metric collection is installed and in scope.
  • Which inventory source, if any, writes cloud resources to the CMDB.
  • Which system holds the authoritative alert state, the cloud tool or ServiceNow.