OBLYTECH Logo
OBLYTECH Logo

Configure the SNMP traps listener to receive OEM traps

To configure the SNMP traps listener to receive OEM traps, create a listener on the MID Server that Oracle Enterprise Manager Cloud Control will target. Select v1 and v2c, load the required MIB files, and verify that incoming traps become Oracle EM events and alerts in Event Management.

Prepare the MID Server and access before configuring the listener

The MID Server receives the trap traffic and passes it to the ServiceNow instance. Event Management then processes that input as events. Plan the route around the MID Server that will actually run the listener: the destination configured in Oracle Enterprise Manager must lead to that server and its listener port.

For the OEM listener configuration procedure, the required role is evt_mgmt_admin. The general listener interface has separate permissions: agent_admin is required to view the MID SNMP Trap Listener in the UI. Other listener operations require one of agent_admin, evt_mgmt_integration, or evt_team_operator. Check access for the action being performed rather than assuming the OEM configuration role covers the entire listener interface.

Assign the MID Server either the EventManagement or ALL applications setting. Before opening the form, record the intended MID Server, its destination address, the chosen UDP port, and the person responsible for configuring the OEM target. This gives both teams the same connection details and prevents a listener on one server from being paired with a target pointing elsewhere.

For surrounding SNMP work, distinguish trap reception from SNMP discovery probes, credentials, and parameters. Keep the acceptance test focused on a trap arriving through the listener and becoming an Event Management event.

Configure the SNMP traps listener to receive OEM traps

Open All > Event Management > Integrations > MID SNMP Traps Listener and select New. The general collection interface also uses the label MID SNMP Trap Listeners. Check labels and available controls against your instance and release when following the steps below.

  1. Give the collector a unique Name. Use Short description to identify the purpose of this MID Server extension execution context.
  2. Set SNMP version to v1 and v2c for the OEM configuration. The alternative on the form is v3.
  3. Set UDP Port to the receiving port agreed with the OEM administrator. The general collector default is 1162; choose another free port if that port is already occupied.
  4. Set Execute on to Specific MID Server, the recommended selection for a sender that targets a particular address.
  5. In MID Server, select the designated server. Compare this selection with the server recorded during preparation.
  6. Complete the required listener fields and select Submit for the OEM listener record.

The OEM 12c Trap event rule expects SNMPv1-style fields, including enterprise, generic_trap, and specific_trap. That dependency explains the v1 and v2c selection. Choosing v3 introduces a different configuration path; it does not substitute for the trap structure that the OEM rule expects.

Ensure the required SNMP MIB files are uploaded on the instance. The OEM integration includes the Oracle EM MIB and the OEM 12c Trap event rule. Keep MIB readiness in the setup checklist rather than discovering missing translation information after the sender has already been enabled.

Connect the OEM target and check listener execution

In Oracle Enterprise Manager Cloud Control, configure the designated MID Server as the trap listener target. Coordinate the destination and port with the listener record. A saved ServiceNow record completes the receiver configuration, but the OEM target still has to direct traps to that receiver.

On the listener form, Status remains blank until the listener has run. Started means it is running; Stopped means it is not running; Offline means the MID Server is down; Error means the listener failed. Interpret these values before moving into event rule troubleshooting.

Executing on identifies the MID Server running the extension and is populated automatically. It can continue to show the server name when that MID Server is down. If the extension is stopped, the field is empty. Read it together with Status instead of treating a populated server name as proof of an active listener.

Use Start under Related Links when the listener is not running. Stop ends a running listener, while Restart stops and starts it on the configured MID Server and port. These controls act on listener execution, which is a separate check from whether an OEM event has reached the instance.

When changing a running listener, apply the change with Restart or Update parameters. Update parameters validates the new configuration before disconnecting and reconnecting the listener. Saving a changed value alone does not make that configuration take effect on the running listener.

Validate the path from trap reception to alert actions

Use a controlled OEM trap and follow it through successive checkpoints. Record the send time and the intended target so that the MID Server log entry and resulting event can be compared with the same test. Avoid accepting a listener startup message as the entire integration test.

  1. Check the MID Server log for the listener startup entry. Look for TrapListenerExtension: started and the reported listening port. Compare the port with the configured OEM destination.
  2. Open Event Management > All Events, or inspect em_event, and filter source to Oracle EM. Look for the event associated with the test.
  3. Inspect event_class for Trap From Enterprise 111. In additional info, check for OEM fields such as oraEMNGEvent_Severity and oraEMNGEventHost_Name.
  4. Open Alerts and verify that the OEM event produces an alert. Check for the View Target Status and View Event launch-in-context actions.

These checks establish different parts of the route. A running listener establishes that the receiver started; a matching event establishes instance processing; the alert and its actions establish the downstream result. Keep the evidence for each checkpoint so that a later failure can be located without rebuilding the entire configuration.

For help planning this work, see ServiceNow implementation.

When planning how operations staff will respond to the resulting alerts, the broader site reliability engineering guide provides context for the operating model. Keep that planning separate from the receiver acceptance test so its outcome remains measurable.

Troubleshoot the first failed checkpoint

If the MID Server log contains IOException starting the SNMP listener, investigate a port conflict. The configured port may already be occupied. Select a free receiving port or resolve the conflict, then align the OEM target with the final listener configuration before testing again.

If the listener runs but no Oracle EM events appear, enable MID Server debug logging to inspect incoming trap details. Debug output includes the PDU, variable bindings, and OIDs. Use those details to determine whether the MID Server is receiving the intended traffic before spending time on event matching.

If a trap reaches the MID Server but OEM fields are missing from the event, compare the received structure with the fields expected by the OEM 12c Trap event rule. Review MIB availability and translation alongside the event evidence. Changing the destination cannot correct a field mismatch in traffic that has already reached the receiver.

If the event is present and recognizable but the expected alert result is missing, continue the investigation at alert processing. Preserve the event record and the test details for that review. This narrows the handoff instead of sending the listener administrator back through a successful reception test.

For later investigations that extend into service context, use the Service Mapping troubleshooting guide. An OEM listener acceptance record should remain focused on reception, event processing, and the expected alert actions.

Questions about OEM listener configuration changes

Does Test parameters prove an OEM trap can arrive?

Test parameters checks that the port is a valid number. It does not establish that an OEM sender has delivered a trap. Use it for configuration validation, then keep a separate delivery test with a known sender and a resulting event record.

Why are SNMP credentials absent from the form?

The Credentials for SNMPs section appears when SNMP version is v3. Minimum Security Level is also conditional on that selection. Their absence on a v1 and v2c listener follows the selected version; it is not by itself evidence of an incomplete OEM setup.

Which supplied rules support the OEM launch actions?

The associated alert action rules are named Oracle EM Launch Target Status and Oracle EM Launch View Event. Record those rule names when reviewing integration dependencies, particularly if the listener is being introduced into an instance with existing Event Management customizations.

Can a trailing OID counter affect event matching?

Yes. The MID Server property mid.em.snmp_old_key_counter_cut.enabled can remove an identified trailing OID counter when set to true. It does not remove numeric segments that cannot be distinguished from significant OID values, including cases involving incomplete MIB translation. Inspect the translated value before changing this property.