OBLYTECH Logo
OBLYTECH Logo

ITOM Service Operations Workspace: Alerts and Express Lists

Service Operations Workspace for ITOM is the operator view for IT alerts. An administrator installs the AIOps Experience application, and operators then use the Express List to scan, filter and preview alerts, open each alert record to work it, and launch remediations or web tools from there.

Installing the workspace and checking prerequisites

The workspace comes from the AIOps Experience application, identified as sn_sow_aiops. Go to All, then System Applications, then All Available Applications, and search by name or ID. Before you press Install, confirm valid ServiceNow entitlements for the application and for each Store dependency, and read the Store listing for licensing, subscription and release compatibility requirements. The install dialog lists the Store dependencies that will be installed with the application.

The install form offers a demo data check box. Demo data is a set of sample records that illustrates common use cases. Load it when you first install on a development or test instance, so the team can practise before live alerts arrive.

For the wider AIOps side, see the AIOps guides.

Getting around the workspace

Open the workspace from Workspaces, then Service Operations Workspace. The navigation bar has one icon for each working area. For how workspaces are built more generally, see UI Builder and workspaces.

Navigation area What an operator uses it for
Overview (home) Alerts assigned to you, team alerts, unassigned team alerts, monitored services and open alerts
List Predefined lists under the Lists tab and personal lists under My Lists
Express List A sortable alert list with a preview panel
Integrations Launchpad Connections to monitoring tools and other data sources
Alert automations Rules that ignore, enrich, group and respond to alerts
AIOps Dashboards Key performance indicators, service health and operational visuals

The Overview section of the home page shows alerts assigned to you, team alerts, unassigned team alerts, monitored services and open alerts.

Roles set what each person can change. evt_mgmt_admin configures Event Management properties and rules. evt_mgmt_operator manages alerts, including closing and acknowledging them. evt_mgmt_user has read-only access to Event Management features, and the itil role it contains lets it manage incidents created from alerts.

Working the Express List

The Express List is a sortable alert list for spotting health problems across the data centre. Selecting an alert’s check box opens a preview panel that supports prioritisation, impact assessment and root cause analysis without opening several forms. Operators use it to monitor, resolve, track and report.

The Info tab in the preview shows the core alert fields, including status, duration, configuration items, node, resource, source, assignment, impacted services and custom fields. For how assignment groups route records, see assignment group explained. When the selected alert belongs to a group, the Alerts in group tab shows one tile per alert, with its number, status, severity, configuration items, duration and metric name.

The default time range is the last 24 hours, and the list keeps refreshing until you select the pause icon. The range menu offers All time (the last 90 days), Last 24 hours, Last 2 days, Last week, Last 12 hours, Last hour, Last 15 minutes and a custom calendar range. The evt_mgmt.express_list.all_time_days system property sets how many days All time covers, and it leaves the default unchanged.

The Express List does not export alerts, so use the list view for exports. Administrators can set a default time range for a predefined view through the Default Time Range field, which arrived with Express List 26.6.1, Express List App 26.4.0 and ITOM Apps 26.9.0.

Reading and working an individual alert

Selecting an alert number opens the full record. The header shows the description, priority group, severity, state and the time the initial event was generated. The parent field appears on child alerts, the group field names the group type, and the task field shows the linked incident number.

The Overview tab opens when the alert has an assigned configuration item, and its content varies between grouped, secondary and primary alerts. Selecting an alert opens its Details tab, and the Related records tab shows the subtabs that apply to that alert, such as Alerts in Group for alert groups.

Running remediations and launching tools from an alert

Remediation requires the evt_mgmt_operator or evt_mgmt_admin role, because evt_mgmt_user is view-only. For the general concept, see remediation task explained. Open the Express List, select the alert number to open the alert, and then choose the remediation from the Close drop-down list on the alert. If that list is empty, no remediation is available for the alert.

Web tools can be attached to alerts as well. Operators with the evt_mgmt_operator or evt_mgmt_admin role open the alert, and the right panel opens on the Utilities tab. Selecting a web application there launches it. Administrators add those applications through an alert management rule, so the tool is ready when the alert arrives.

Configuring the home page, lists, dashboards and views

The home page offers four kinds of change: the greeting text, the first-level cards in the Overview section, a copied landing page for visual styling, and the configurable workspace experience in UI Builder.

The first-level cards are configured in the SowEMLandingPageUtilsSNC client script include, which sits under sys_ux_client_script_include. An administrator with the evt_mgmt_admin role edits its Script field. The script holds a label map with entries such as alerts assigned to you, open alerts by priority from 1 to 4, and assigned and unassigned team alerts. Each card takes a header label, a data source, a metric, a group by field and a viewAllQuery. Save the change with Update.

The Service Dashboard shows service health for the application services held in the Impact Filter Services list. Display settings change tile size. Group by and Group order arrange the tiles, and each group can be segmented by severity, business criticality or cost. The Filter icon sets a global filter. Selecting a severity in the Severity Breakdown ribbon dims it and removes it from the view, and selecting it again restores it. For the general dashboard concept, see dashboards explained.

Custom views follow a similar pattern. An administrator with the evt_mgmt_admin role applies the filter, then uses More actions to save the result as a copy with a name. A saved view is private to its creator by default. Global views are visible to all users and are created by an Event Management administrator. Discard changes under More actions reverts unsaved edits.

Lists are customised by users with the itil role. Open the List icon, select My Lists, and choose Add new list. Start from an existing list or create your own, then select Create. The same area lets you change list order, edit content and delete lists. A common use is a list of incidents tied to one company, so an operator can work that queue without filtering the shared view.

On-call escalations use trigger rules, and the tables those rules can act on are listed in the Trigger Rule Table Configuration list. Administrators reach it from All, then On-Call Administration, then Administration, then Trigger Rule Table Configuration.

Alert automation and the order alerts pass through

Alert automation sits between monitoring tools and responders. Administrators connect tools through the Integrations Launchpad, which consolidates events, metrics and logs from the infrastructure. Once alerts arrive, automations run in a fixed order. They ignore noisy alerts first, then enrich the rest with context and normalise them into a standard format. Next they group related alerts into a primary alert, and finally they respond by notifying stakeholders, escalating or running remediation.

Each type can hold several automations, each with its own trigger conditions and actions. Automation applies to alerts as they are received and does not reprocess existing alerts, so a new rule will not clean up earlier volume. The respond stage can also create cases or run remediation in third-party systems.

A central administrator sets platform rules, and qualified teams such as site reliability engineers can manage automations for their own alerts. For the wider Event Management picture, see the Event Management guides. The classic Event Management experience uses the same backend tables, so a change in one appears in the other. Some advanced features remain limited to admins in classic.

A working day in the workspace

The operator routine starts on the home page, where the alerts assigned to you show their priority group and severity. Once the immediate issue is handled, the operator decides whether the underlying cause needs follow-up work.

Frequently asked questions

Who can install Service Operations Workspace for ITOM?

A user with the admin role installs the AIOps Experience application. Confirm entitlements for the application and its Store dependencies first.

Which time range does the Express List show by default?

The default is the last 24 hours, and the list keeps refreshing until the pause icon is selected. An administrator can set a different default for a predefined view with the Default Time Range field.

Does alert automation clean up alerts that already exist?

No. Automation applies to alerts as they are received, so existing alerts are not reprocessed. Review the current alert volume before writing new rules.

Can a team manage its own alert automations?

Yes. Qualified teams can manage automations for their own alerts without changing the rules that belong to other teams.