OBLYTECH Logo
OBLYTECH Logo

ServiceNow Event Management Connectors: How to Choose

ServiceNow Event Management connectors are the routes that get alerts from your monitoring tools into the platform. The core choice is pull or push: a pull connector has the platform or a MID Server go out and collect events from a source, while a push connector or generic input accepts events the source sends in.

Choosing between them comes down to three questions: which monitoring tool you run, which side can reach the other, and how that source authenticates. Work through those in order and the rest of the setup mostly follows. For the wider picture, start with our ServiceNow Event Management guides.

Start with the monitoring tool you already run

Teams usually do not pick a connector from a blank list. They start from the monitoring product they already depend on and look for a matching connector. Which connectors are available depends on your release and on which plugins are active in your instance, so check that list in your own instance rather than relying on a general answer. When a connector exists for your tool, it removes most of the mapping work. When it does not, a generic input is the fallback, and that makes you responsible for translating the source’s message format into event fields.

Pull and push differ in who opens the connection

The distinction that matters most is which side starts the traffic. With a pull connector, the platform reaches out to the source on a schedule and asks for new data. That suits sources with a query interface, where you want the polling rate under your control. With a push input, the source sends each event as it happens. That suits sources that can only send, such as tools that emit a notification when something changes.

Question Pull connector Push or generic input
Who starts the traffic A MID Server The monitoring source
Timing Set by the polling schedule Arrives as the source sends it
What the source needs A readable interface and a read-only credential A route to the instance and its own sender credential
Main risk Gaps if the schedule is too slow Bursts that land all at once

Neither approach is better in general. Pick by what the source can do. If a tool can only send, push or a generic input is the only option. If it can be queried, pull gives you a steady, predictable load.

Set the polling interval on a pull connector

A pull connector checks its source on a timer you set in seconds, in the Event collection schedule field. That value cannot go below the minimum schedule property, which defaults to 120 seconds, so a faster poll would first need that minimum changed.

Size the interval against peak event rate rather than the average, because a slow poll usually pulls a larger batch at once. The MID Servers for Connectors field names the MID Server that processes a pull connector’s events, and the system uses the Host IP field to select the appropriate MID Server.

Where collection runs and how connectors authenticate

Pull connectors run through a MID Server, the agent installed inside your network, and the Host IP field is what selects that MID Server. Push connectors differ by connector: some send events through the instance and others through a MID Server, so check the route each one offers. Reachability still decides which route is workable. If the source sits behind a firewall that only an internal host can see, the MID Server route is the one to use. If the instance can reach an external service directly, a push connector that sends through the instance leaves one fewer component to keep healthy. Many environments end up with both: a MID Server for on-premises devices and direct collection for cloud tools. Confirm which modes a given connector supports in your instance, because some only run one way.

Authentication follows what the source offers, usually a service account, an API token or a key pair. Give each source its own identity with the narrowest rights it needs. For pull connectors that is normally read-only access to the data. For push inputs, the sender needs its own credential so you can rotate or revoke one source without disturbing the others. Shared logins across sources are a common shortcut and a hard thing to untangle later, because nobody can tell which feed is misbehaving.

Special cases: SNMP traps, email and structured messages

Some sources fit awkwardly into the standard pattern. SNMP traps are typically received through a listener on a MID Server, since network hardware is typically configured to send traps to one specific IP address, and the listener’s UDP port (1,162 by default) has to be reachable from the devices. Email-based alerts are parsed from a mailbox, so their quality depends on how stable the subject lines and body text stay over time.

Generic structured input, usually JSON sent over HTTP, accepts almost any tool that can make a web request. The catch is that accepting a message is only half the work. Without an event rule that reads the incoming fields and maps them to the event’s source, severity and description, the records arrive but do not behave as alerts. Test one sample message end to end before you point a live source at the input.

Named tools that already have a provided connector

Event Management ships pull connectors for tools such as PRTG, Zabbix and SCOM, and push connectors for sources such as Datadog, Dynatrace and Sentry. The push connectors need the Event Management Connectors plugin, which you download from the ServiceNow Store. The pull table also lists the supported version of each connector.

When a custom ServiceNow Event Management connector is worth building

Use a generic input when the source sends a clean, consistent message and the mapping can be written once. A custom connector earns its cost when the source needs paged pulls, token refresh, or a data shape that would otherwise need constant patching in event rules. The decision is mostly about maintenance. A custom connector is more work up front, but the integration lives in one place. A generic input with a fragile mapping spreads its fixes across rules nobody remembers writing, and that becomes expensive the first time the source changes its output.

If you need help designing the mapping and the correlation rules behind these inputs, see our event management and alert correlation service.

Walk through a custom push connector setup

Start on the instance by giving the connector a unique name. Check that the vendor name in the Source field is correct, and use the Description field to say what the connector receives. Then choose the collection route the connector offers, through the instance or through a MID Server.

The instance then generates a webhook URL. Copy it into the monitoring tool’s webhook settings and send the matching credentials for the authentication method you chose on the instance. If a push fails, the Details tab records the latest error message and payload. Once events appear on the Related events tab, move on to adding alert automation.

Plan capacity before switching on a high-volume source

Connector choice also sets how much load arrives and when. Pull connectors spread work over a schedule you control, so a busy source can be collected in batches. Push inputs deliver at the source’s pace. Before enabling a high-volume source, estimate events per minute at peak, not on average, and start with a small slice of the source so you can watch how the instance and any MID Server behave.

Plan for failure as well. One broken dependency can produce a large burst of events in a short time. Those floods need deduplication and noise control in event rules before they reach the incident queue, or the team learns to ignore the feed. For the design side of that, read how to reduce alert noise by design. Once correlated events start creating incidents, make sure each one has a clear owner and route, which is the subject of our incident and problem management work.

Frequently asked questions

Which monitoring tools can send events to ServiceNow?

A tool can feed Event Management when it sends events over a route the platform supports, such as a connector, an SNMP trap, an email or a generic JSON input. Whether a ready-made connector exists for a given product depends on your release and installed plugins, so check the connector list in your own instance. Tools without a connector can usually still send structured messages through a generic input.

Does every connector need a MID Server?

Not all of them. Standard pull connectors run through a MID Server, and the connector test checks that the MID Server can reach the source host. Push connectors can deliver events either through the instance or through a MID Server, and when the source can send events straight to the instance, delivery through the instance is simpler to run. Confirm the supported modes for each connector in your own instance.

Can I use pull and push for the same source?

It is possible, but it is easy to get duplicate events unless you deduplicate them. Choose one path per source and record which one is live, so a later change does not quietly double the volume.