A ServiceNow ITOM subscription unit is a counting measure applied to categories of managed resources, not to CMDB records. The figure on a quote depends on which categories your contract includes, the ratio for each and the effective date of that schedule. Before accepting a figure, ask which counting basis produced it and compare it with the usage reports.
Subscription units count resource categories, not CI records
As of November 2026, ServiceNow measures ITOM consumption in subscription units, and those units are tied to categories of managed resources and configuration items (CIs). The categories that apply, and the ratio for each one, are set by the customer contract. Because those terms vary by contract, two buyers with similar infrastructure can see different totals. A single figure on a quote tells you little without its counting basis.
A common misreading is treating a CI record as a unit. One CI record does not automatically equal one subscription unit. Some CMDB records may fall outside the categories a contract counts, and a resource that is absent from the CMDB can still show up in usage. Both points change how you read a quote.
ITOM licensing also has three layers that are easy to blur together. The first is commercial packaging. As of November 2026, the public pricing page presents ITOM Advanced and ITOM Prime. The second is product naming: Visibility, Discovery and AIOps describe what each product does. The third is consumption measurement, the set of resource categories, ratios and product usage data that produces the reported count. A line on a quote may not map neatly to one product name. For how packages are arranged, read the overview of ServiceNow pricing and licensing. This page stays on counting.
Resource ratios depend on the effective date of the schedule
A ratio sets how many resources one unit covers in a given category, and ratios are version-sensitive. The ordinary ITOM Subscription Unit Overview published by ServiceNow is effective February 1, 2024. In that schedule the ratios are written as follows:
- Servers: 1 : 1
- Platform-as-a-service (PaaS): 1 : 3
- Containers: 1 : 10
- End-user computing devices: 1 : 4
- Function-as-a-service (FaaS): 1 : 20
- Unresolved monitored objects: 1 : 4
Read each ratio as the schedule writes it, and confirm the direction against your own contract. The February 2024 schedule is a dated reference only. ServiceNow’s entitlement supplements index lists a separate ITOM overview effective April 9, 2026. The April 2026 version that could be checked is product-specific and adds categories that the February 2024 table does not list. The ordinary April 2026 overview could not be verified, so the ratios above should not be treated as the current schedule for a 2026 contract.
Two practical points follow. First, a ratio table found online without an effective date and contract scope is not evidence for your quote. Second, the schedule named on your order form outranks any published table, including the one above. For the scanning side of the same question, the CMDB licensing and cost factors guide covers how CMDB population connects to counting.
Discovered and connector-imported resources count toward the total
As of October 18, 2026, Visibility and the entry-level Discovery package both count applicable CIs that were discovered, as well as CIs imported through Service Graph Connectors. The count therefore has more than one source. Visibility’s scope includes Discovery, Service Mapping and certificate-related capabilities, so a discovery scan and a connector feed can both contribute to the same figure.
Imported does not automatically mean unmetered. As of September 10, 2026, the Intune connector’s configuration requires an ITOM Visibility or ITOM Discovery subscription, which means a connector can carry its own entitlement condition on top of the count. If you are weighing connectors against scanning, the Discovery licensing and cost factors guide covers the cost factors on the scanning side.
AIOps follows a different path. It reports resources associated with events, alerts and metrics. Working from how that measure is defined, the AIOps figure can move with event and metric activity rather than with inventory growth. That is an inference from the definition, not a documented rule, so confirm the behavior in the usage report before relying on it. The AIOps licensing and cost factors guide covers the product side in more depth.
Unresolved monitored objects and why they appear in usage
ServiceNow’s Subscription Unit Overview, effective February 1, 2024, defines unresolved monitored objects. They are recorded in the em_unique_nodes table when their type is unknown. In the February 2024 schedule they carry a ratio of 1 : 4, so a monitoring estate can generate consumption that an inventory-based view does not show.
This is one place where usage and inventory diverge. A monitoring source can see a host that the CMDB has not matched, and that host can still count. Often the fix is a data-quality task rather than a licensing argument, which is why the CMDB health dashboards and data quality scores page is worth reading before you review a quote.
Older documentation uses node language, and that language is easy to carry into a new discussion. Node terms come from older, product-specific packaging, so treat them as historical context rather than a rule for 2026. If a quote or an older contract uses node terms, ask which definition it follows before comparing one count with another.
Checking actual consumption before a renewal date
As of November 2026, the licensing application provides daily counts and 90-day consumption trends. Those two views are a practical check before a renewal, because they show direction as well as the current level. Release notes record counting changes and fixes, so the application version matters when you compare one period with another. A figure from one version can differ from a figure from another for reasons that have nothing to do with the estate itself.
As of November 2026, administrators can also generate lists of countable CIs by ITOM application. Use those lists to see which records are consuming units and why, rather than estimating from the total number of CMDB records. Estimating from the total hides the individual records behind the count, and that is usually where disagreements begin.
Before you accept a figure on a quote or renewal, work through these questions in order:
- Which exact quote, SKU, order form and entitlement schedules apply? Packaging should be read from those documents, not from a public page.
- Which ratios apply, and what is the effective date of the overview they come from? An undated table is not enough to settle the question.
- Why is usage higher than inventory? Ask for the product-specific list of countable CIs and the unresolved-object records.
- Does connector data count, and which entitlement does that connector require?
- Is the comparison being made between old and new counting behavior? Check the licensing application version and its release notes.
What this page does not cover
This page does not give prices, discounts or minimum purchases. As of November 2026, the official pricing page is quote-led, and the licensing documentation makes categories and ratios dependent on the contract. No universal dollar figure per unit, per node or per user is supported by the public material, so this page does not offer one. The ratios above are one dated schedule and only one part of the picture.
The page does not say that imported CIs are exempt from the count, that missing CI matching avoids consumption, or that every CMDB record consumes a license. None of those statements is supported by the current subscription material. Questions about which ITOM bundle a quote maps to belong on the pricing overview linked earlier.
If you want help reconciling a quote with its usage reports, see the ITOM health check.
Frequently asked questions about ITOM subscription units
Is one CI record the same as one subscription unit?
The count depends on the resource category a CI falls into, the ratio set by the contract and whether the product counts that category at all.
Which ratio applies to my quote?
The ratio in the schedule referenced by your order form, read against that schedule’s effective date. Ask the seller to name the overview and date behind any ratio they quote you.
Why is ITOM usage higher than my CMDB count?
Usage can include monitored objects that are not matched to a CI and resources associated with events, alerts or metrics. Pull the product-specific list of countable CIs and the unresolved-object records before concluding that the figure is wrong. Those two groups are the first places to look.
Do connector-imported resources count toward the total?
As of October 18, 2026, Visibility and the entry-level Discovery package count applicable CIs imported through Service Graph Connectors. Whether a specific connector also needs its own entitlement depends on that connector’s prerequisites. As of September 10, 2026, the Intune connector, for example, requires an ITOM Visibility or ITOM Discovery subscription, so check prerequisites before you assume an import is free.
Are node counts from older documents still a valid comparison?
Treat node terms as a question to clarify rather than a number to reuse. Node terms come from older, product-specific packaging, so a node figure from an old contract cannot be compared directly with a unit figure from a new one. Ask which definition was used when the figure was produced.
Does the count change when the licensing application updates?
It can. Release notes record counting changes and fixes in the licensing application, so the version in use matters whenever two figures from different periods or systems are compared. Record the application version alongside any figure you export, so the comparison stays like for like.