OBLYTECH Logo
OBLYTECH Logo

MID Server Requirements and Sizing: OS, Java, Memory and CPU

ServiceNow MID Server requirements combine supported operating systems and Java versions with workload-based CPU, memory and disk planning. Start with the supported platform, reserve memory beyond the Java heap, and test concurrent jobs during peak scans. Hardware minimums provide a baseline; measured throughput and resource pressure determine whether to increase capacity.

Confirm the operating system and runtime before you size the host

Sizing comes second. The first check is whether the operating system and the Java runtime used by the MID Server are on the supported list for your release. Support is tied to each release, so a combination that installed cleanly on an earlier version may not be supported on the one you run now. For Brazil and Australia new installs, the MID Server installer bundles Java 21.0.7, and the minimum supported JRE is 17.0.10. Upgraded hosts can end up on a different runtime, so confirm the version your release uses before you provision the host. If your discovery or orchestration design depends on PowerShell, check that version against the same list.

Supported server platforms include Windows Server 2012, 2016, 2019, 2022 and 2025; Linux options include Red Hat 6 and later, Ubuntu 14 and later, and CentOS 9 and later. Both virtual machines and 64-bit systems are supported. Select a platform that also meets your own operating system maintenance and security policy.

Check the packages and network access the host needs

Two requirements outside the sizing numbers are easy to miss. On Linux, the host needs the net-tools package, which provides netstat. Without it, the Network and Router fields on the MID Server record stay empty even after validation succeeds.

On Australia Windows hosts, the MID Server requires PowerShell 3.0 at minimum and supports versions up to PowerShell 5.1. PowerShell 7 is also supported, but PowerShell 6 is not, so confirm your exact version against your release before you rely on it. Certificate checks also need outbound access, because the MID Server checks revocation through the certificate authority’s OCSP responder, which runs over plain HTTP by design. Sequence these checks before deployment using the MID Server implementation roadmap.

Map the workload to the host before choosing hardware

A host that forwards a few integration calls and a host that runs large discovery scans and orchestration probes may need very different resources. Write down which capabilities the host will carry, then consider how much load each one adds.

  • Light integrations: estimate concurrent jobs and payload sizes before deciding that a shared host has enough capacity.
  • Discovery scanning: record the target count, scan depth and overlapping schedules; consider a dedicated host for sustained demand.
  • Orchestration and probes: include parallel commands and file transfers, then test thread settings before expanding hardware.
  • Mixed use: identify which capabilities compete for the same CPU and memory and which can move to separate hosts.

Share a host when its workloads are light, the owners agree on a schedule and the box has headroom after the operating system and monitoring tools are running. Consider a dedicated host when scans overlap with business hours, when credentials are scoped to a separate network segment, or when one failure would stop too many integrations at once. Include network and credential boundaries in the MID Server governance model so capacity decisions also have an accountable owner. For the wider set of MID Server material, start from the MID Server guides index.

Memory, CPU and disk need to be planned together

The CPU baseline is four cores at 2 GHz or faster for a Windows Server 2012 R2 host running one MID Server with 25 concurrent threads. Treat that specific configuration as a starting point rather than a capacity promise for another operating system, thread count or discovery scope.

There is no universal number for memory, CPU or disk that works across all instances. The same host can handle a small scan comfortably and struggle with a large one. The Java process is a major memory consumer, so its maximum memory setting in the wrapper-override.conf file has to leave room for the operating system and any other software on the box.

CPU load can rise as concurrency increases, so more simultaneous work may mean more contention for the same cores, not just a longer queue. Disk needs depend on the logs the host writes and any temporary files the workloads create. Reserve room for log growth and set a cleanup schedule before go-live rather than after the first full disk.

Raise the JVM memory limit when the default is too small

A MID Server starts with a Java heap of 1024 MB by default, which might not suit a host running large discovery work. The role required for the JVM memory procedure is admin. If your sizing calls for more, raise the limit on the host itself, then restart the service so the change applies.

The setting sits in the wrapper-override.conf file, inside the agent configuration folder of the MID Server installation directory. Remove the comment marker in front of the wrapper.java.maxmemory parameter, set the value in megabytes, save the file and restart the MID Server service.

Monitor the host for more than CPU percentage

CPU percentage alone gives limited visibility into MID Server load. Track memory use over time, and investigate sustained growth across comparable runs before attributing it to a capacity shortage. Watch free disk space, network throughput to the instance and the number of jobs waiting in the queue. A host that is online but falling further behind each day is an easy failure to miss. Build a simple report on these measures so trends are visible without someone reading raw logs.

Also check the MID Server logs for repeated connection or authentication errors. These can look like network faults, but they may follow a credential change, an expired password or a firewall rule edited during maintenance.

Check CPU use during and after scans

A scan may keep CPU use high while it runs, so compare readings taken during a scan with readings taken after it ends. Investigate frequent or long periods of high use, or a processor queue that stays high once the scan has finished. Test any change to thread counts against your own workload before you adopt it. For connection errors that arrive with those peaks, the guide to common MID Server mistakes is the next place to look.

Validate capacity with a repeatable peak-load check

Record the host configuration, active MID Server count, thread setting, scan scope and schedule before testing. Run a representative peak workload and compare completion time with the available window. Repeat with the same scope after a change so a smaller scan does not create a misleading improvement.

On Windows, pair CPU readings with System Processor Queue Length. A queue persistently exceeding twice the processor core count can indicate a CPU bottleneck. On Linux, use load averages to understand demand from running and waiting threads. Discovery can reach 90–100% CPU while doing productive work; examine whether pressure subsides after execution ends.

Change one constraint at a time: separate overlapping schedules, reduce competing applications, adjust concurrency or add resources where measurements justify it. More threads can increase waiting rather than throughput. More CPU can ease contention while short utilization peaks remain. Save before-and-after measurements with the change record and agree who reviews future growth.

Keep memory use, free disk space, queue delay and completion time together in the capacity report. These planning checks help distinguish a busy host from one that cannot finish its assigned work. For help planning this work, see ServiceNow implementation.

Work through a pre-install checklist

  • Confirm the operating system and runtime against the supported list for your current release
  • List the workloads the host will carry and group them by how much load they add
  • Decide whether the host is dedicated or shared, and record the reason
  • Reserve memory for the operating system and other software as well as for the MID Server
  • Set log retention and a disk cleanup schedule before the host goes live
  • Read the release notes for your version, since requirements can change between releases

Questions about platform choices and sizing exceptions

Can a Linux MID Server perform Windows discovery?

Use a Windows MID Server to discover Windows servers, run Service Mapping patterns or execute Orchestration commands on Windows devices. Choose the host platform from those capabilities before comparing hardware. On Windows, include Microsoft .NET Framework 4.5 or later in the prerequisite checks.

Does a successful ZIP installation prove that the host is supported?

No. A ZIP installation can succeed on an unsupported operating system. Installation success and platform support answer different questions. For example, Windows 10 remains unsupported even though a manual installation may be possible. Avoid using a successful startup as the acceptance test for platform suitability.

What changes when a proxy uses an internal certificate authority?

The MID Server validates certificates on its HTTPS connection to the instance. A proxy or appliance in that path must present a trusted certificate. Import the relevant internal CA or self-signed certificate into the MID Server trust store when needed; adding CPU does not resolve a certificate trust failure.

Can one sizing profile cover additional products?

Discovery, Event Management, integrations, Orchestration and Service Mapping share the standard deployment category. Health Log Analytics has additional requirements. Cloud Management Platform and Operational Intelligence require dedicated hosts separate from MID Servers serving other products. Identify the product mix before applying a standard profile.