To set a maintenance schedule for an equipment model entity, open the entity in the Industrial Process Manager application, select the Schedules tab, and select New. Fill in the form and select Submit. To change a schedule, select it, add your changes, and select Update. To delete one, select it and select Delete. These steps require the sn_isa_schedule_admin role.
Check the template and role before you schedule an entity
Start with the equipment model entity and the template it belongs to. Equipment model templates group similar equipment model entities and describe the physical industrial facility they make up. A template is assigned to the entities you created in the ServiceNow AI Platform, so confirm that you have the right entity open before you add a schedule to it. Use the same entity names your team already uses in its records, so the schedules are easy to find later.
A template also sets the structure around an entity. You can create hierarchical sorting levels for the template, then create level types inside each level to describe the kind of production process that happens there. Build that structure first, then schedule maintenance against the entities that use it. For background on the common service data model, read the plain-language guide to the common service data model.
Check your role before you start. The create, edit and delete steps in this article require sn_isa_schedule_admin. On the platform, this role is labeled Equipment Model Downtime Planner.
Gather three things before you open the form: the equipment model entity as it appears in the list, the windows when the maintenance work can happen, and the people who will pick time slots from the schedule. Having these ready keeps the entries consistent across the entities you schedule, and it saves you from reopening a form to correct a detail you did not have to hand.
Labels, tab names and steps can differ between releases. The steps here follow the Brazil release, so compare the labels on your instance with the ones shown before you follow them.
Create a maintenance schedule and add its entries
Create each schedule from the equipment model entity record, so it is tied to the entity you have open.
- Navigate to All > Equipment Model – ISA > Equipment Model Entities.
- Select the equipment model entity that you want to associate with a schedule.
- Select the Schedules tab.
- Select New.
- Fill in the form and select Submit.
Repeat the last two steps to create more than one schedule for the same entity. Once you select Submit, the maintenance schedule is created, and an eligible user can see it.
When you create several schedules for one entity in the same session, enter them in the order the work will happen. That order makes it easier to spot a gap or an overlap before anyone plans against the schedule.
Each schedule can hold several entries. An entry covers one maintenance task at a set time, so a single schedule can track several tasks that happen on different days or at different times. To add an entry, open the existing schedule record and use the Schedule Entries related link. Adding, changing and deleting entries uses the same Equipment Model Downtime Planner role. The Schedule Entries related link sits on the existing schedule record, so open that record first.
Plan the entries on paper before you enter them. List each task, the time it should happen, and the entity it applies to, then compare that list with the schedules already on the entity. Teams that plan many entities at once often need this step more than the form itself. For help planning this work, see ServiceNow implementation.
Edit or delete a schedule on an entity
Both actions start on the Schedules tab of the equipment model entity. Open the entity, select the Schedules tab, and then work with the schedule you need.
To edit a schedule:
- Select the schedule that you want to edit.
- Add your changes and select Update.
To delete a schedule:
- Select the schedule that you want to delete.
- Select Delete.
Make one change at a time when you edit a schedule. A single change is easier to reverse by hand than a batch of changes entered together. Write down the existing values before you start, so you can restore them if the update turns out to be wrong.
Review an edit before you select Update, because the change is what other eligible users see afterward. Read the schedule’s entries before you delete it. Someone who plans OT incident or remediation work may pick a time slot from a schedule, so a deleted schedule can no longer supply those slots. Teams that want a formal review step before they change shared operational records can start with the operational metrics governance model.
Attach or detach a schedule for an equipment model entity
Attach an existing schedule to an equipment model entity when the schedule should apply to that entity. Attaching applies the schedule and its entries to the entity, so the entity’s maintenance plan includes them. You attach a schedule that already exists rather than building a new one for each entity.
Attach a schedule only after its entries are complete. An attached schedule brings its entries with it, so an incomplete schedule leaves the entity with an incomplete plan. When you attach one schedule to several entities, check the first entity’s Schedules list before you repeat the attachment across the rest.
Detach a schedule when it no longer applies to the entity. Open the equipment model record and use the Schedules related link. Once you detach a schedule, it no longer shows for that entity, which keeps the entity’s list limited to the schedules that still apply. Detaching is the step to choose when the schedule itself is still correct but belongs to a different entity’s plan.
Checks to run before you save a schedule
Run these checks while the form is still open. Each one is cheaper to fix before you select Submit or Update than after another person has planned work against the schedule.
- Confirm that the entity you have open on the Schedules tab is the one the schedule should cover.
- Confirm that each entry names one task and one time, so the entries on a schedule do not repeat each other.
- Confirm that the entries cover the work your team plans to pick time slots for.
- Confirm that no other schedule on the entity is the only one covering an upcoming task before you delete a schedule.
- Confirm that the Schedules related link on the equipment model record lists what you expect after each attach or detach.
Questions about schedule visibility, child schedules and templates
Who sees a schedule after I change it?
The result depends on the step you took. An eligible user can see a schedule you create, no longer sees a schedule you delete, and sees the edited version of a schedule you update. Eligibility depends on the access your instance gives each user, so check that with the person who manages roles on your instance.
What is a child schedule?
A child schedule is added to an existing equipment model entity schedule. Adjustments you make to the child also apply to the parent schedule. For example, you might extend the scheduled time on one day or remove holidays from a schedule. Check the parent before you change a child, because the change reaches both.
Can a schedule support OT incident or remediation work?
Yes. You can pick a time slot from a schedule so that you can work on an Operational Technology (OT) incident or remediation task. Add the entries that cover those times before you plan the work, so the time slot you pick reflects the tasks on the schedule.
Where can I view the schedules for an equipment model entity?
Use the Equipment Model Manager or the Planned Downtime module. Both options are available on the platform. Use whichever one your team already works in for planned downtime, and check the entity’s schedules there after each attach, detach or edit. For the broader context around these records, start with the operational metrics section.
Do schedules attach to templates or to entities?
Schedules link to equipment model entities. The create, attach and detach steps all work from an entity record. Templates work at a different level: they group similar entities and set up how entity data is sorted. If a schedule should apply to one entity, add it to that entity rather than to the template.