Configuring record pages in Service Operations Workspace for ITSM means deciding which tabs, fields, side panel tools and list counts an agent meets when working an incident, problem or change. Tab content is set in the Admin Center, tab order on system route records, and deeper layout work in UI Builder.
The Admin Center sets what the incident tabs show
The incident record has two working tabs, Overview and Details, and both can be shaped without code. A user with the sn_sow_itsm_admin.sow_admin_user, admin or change_manager role opens the Service Operations Workspace Admin Center from the All menu, stays on its Overview tab, and selects Configure in the Incident Management section to open the incident record page settings. For the incident process around these tabs, see incident management in ServiceNow.
Overview is shown to tier-1 agents by default. You can change that visibility, and user criteria can include or exclude users by other roles and user groups. The criteria option appears when the glide.ux.user_criteria_enabled property is set to true. When Overview is hidden for tier-1 agents, Details opens first, so check the landing tab before you hide anything.
Overview has four sections: Summary, Impact, Cause and Resolution. Each one carries its own field layout, UI elements and visible data, so you can rearrange resolution fields without changing the summary.
Details has two layouts. Record is the view on an existing incident, and New record is the view an agent gets when creating one. Both are edited in form builder. Response templates are also configured here. They are reusable messages an agent copies into email or chat, and using them needs the sn_templated_snip.template_snippet_reader role.
The Standard Record Page is the frame underneath
Records in the workspace are drawn from a Standard Record Page, usually called SRP. It holds the containers, components, modals and layouts. Two building blocks govern how it behaves.
Presets are the preconfigured mappings inside a record page. When you add a component, its presets come with it. You can set a preset and lock it using the lock icon on the configuration, and a copy or duplicate of the component keeps those values.
Controllers are the base scripts that run the page’s own behaviour. A copy of a record page references the original controller, so the base functionality cannot be edited on the copy. You shape the page through scripts and states layered on top.
The Overview tab is customized through the Standard Record Page, and the incident variant should be duplicated before any change is made to it. On versions before 4.0, Record SNC in UI Builder can make the same change, but ServiceNow does not recommend it for the incident record page and provides no support for such customizations.
Within SRP, you can add declarative actions to the incident page and its tabs, covering list actions, related list actions and field decorators. You can migrate custom modal containers, and you can set the order number and screen conditions of a record page, which decide which variant an agent sees for a given record.
Reordering record page tabs changes one screen or several
Tab order lives in the UX app route records, opened from the list for sys_ux_app_route. Check which kind of tab you are editing first. Common tabs such as Details are shared by record pages in several workspaces, so changing the Record Details Tab route moves the tab everywhere it appears. Record-specific tabs, such as Overview on the incident record, are identified by App Configuration set to Service Operations Workspace and Parent macroponent set to Record Page Tabs. A change to one of those affects that workspace alone. For the problem and change records themselves, see problem management and change enablement.
Set the position in the Order field on the UX App Route form. If the form has no Order field, add it to the form first.
The contextual side panel carries the record context
Each record page has a contextual side panel with several tabs, including record information, Microsoft Teams collaboration and recommendations.
The record information tab shows the context for the open record.
To change which tabs appear in the panel, open UI Builder, go to Experiences, then Service Operations Workspace, then the SRP Record page. Under Body, open Resizable panes, the right pane, and Tab sidebar. The Config and Tabs setting points at the SOW sidebar tabs top collection. The screen condition deciding where a tab appears is edited on the UX screen form, reached through Developer and Open variant record. The screen condition script is edited from the UX Screen Conditions related list on that form. For the UI Builder concepts behind these steps, see UI Builder and workspaces.
Turning the Agent Assist tab on for each table
The Agent Assist tab returns search results from a table configuration. Its appearance depends on three settings that have to agree.
The first is the script condition. Open the Agent Assist SNC page in the SOW sidebar tabs top collection, switch to Settings mode, and open the Scripted Screen Conditions icon. Set Active to True. A script in the Script field enables the tab for a table, and removing it disables the tab.
The second is the screen condition on the variant record, which lists the tables where the tab may appear. The example lists incident, problem, problem task, change request, change task, knowledge and interaction.
The third is the table configuration. The Macroponent Configuration takes the sys_id of a table configuration, which decides what search results come back. Copy the sys_id from the Table Configuration record using Copy_sysid, then enter the table name and sys_id together. Removing the sys_id turns the results off. Editing table configurations requires the admin to be in the Global domain. For how access rules apply to these tables, see access control lists explained.
Hiding the side panel on one table and tab
Some tabs need more width than the default panel leaves. The Schedule tab on a user group page shows the problem: the group panel and the schedule’s own embedded panel overlap. The hideContextualSidebar UX property hides the default panel for a listed table and tab combination and lets the tab’s embedded panel take its place.
Find it in the SOW Admin Center under Initial setup and SOW properties, using the tile for hiding the side panel for specific table and tab combinations. The UX Page Properties list of the workspace application also has it. The value is JSON key-value, and several objects can list several combinations. Test a change on one record before you apply it, since each agent who opens that tab sees the result.
Setting the record count on list pages
Lists can show record counts in shortened form. The fuzzyCount UX property controls this. Set it from the SOW properties tile for setting the display count to improve list loading, or from the UX Page Properties list. The admin role is needed.
A default of -1 shows the full total, but this setting is not applied to the SOW list page itself. A whole-number default shows the count with a plus sign once it passes that number. A value of 10 on a long incident list reads 10+. A table-specific key overrides the default. For example, setting incident to 10 and the default to 20 makes incident lists read 10+ and other lists read 20+.
The property applies to new list components that have no record count limit of their own, including related lists and Multi Record Associator lists on record pages. A limit set on the component takes precedence, so check there first when a count looks wrong.
Frequently asked questions
Can I change the incident record page layout directly?
Yes, within the supported routes. The Overview and Details sections and their Record and New record layouts are set in the Admin Center through form builder. Declarative actions, modal containers and the order number and screen conditions can be changed in the Standard Record Page.
Why did a tab move in another workspace after I reordered it?
The tab is probably a common tab such as Details. Its route is shared by record pages in several workspaces, so the change reaches each of them. A record-specific tab such as Overview on the incident record stays within Service Operations Workspace.
Why is the Overview tab missing for tier-1 agents?
Tier-1 agents see Overview by default, so a missing tab means the visibility setting has changed. If you use user criteria, confirm that glide.ux.user_criteria_enabled is set to true, because the option is available when it is set.
Why does a record count show a plus sign?
The fuzzyCount value is set to a whole number for that table or list. Set it to -1 to show the total, or change the table-specific value for incident. Components with their own limit ignore the default.
Why does the Agent Assist tab not appear for a table?
Check three things: the script condition is Active and the table’s script is in place, the table is listed in the screen condition on the variant record, and the Macroponent Configuration holds the sys_id of a table configuration for that table. If one is missing, the tab will not return results for that table.