OBLYTECH Logo
OBLYTECH Logo

Knowledge Center in ServiceNow: Editor and Health Score

Knowledge Center is the workspace inside ServiceNow Knowledge Management where authors draft, check and maintain knowledge articles. It brings the article editor, health scores, Article Optimization scans, Insights and AI-assisted drafting into one place. Administrators switch it on through system properties, and style guides shape the tone of AI-generated text.

What the home page gives each role

The Knowledge Center home page is split into sections such as Search, Insights, Requires Attention, Quick View, Actions and Configurations. Which items appear depends on the roles a person holds, so a contributor and a knowledge manager see different versions of the same page. Search uses AI when ServiceNow Otto for AI Search is active and falls back to contextual search otherwise. Insights surfaces top knowledge actions, the knowledge base health score, potential duplicates, potential gaps and article optimization, and it needs AI skills enabled for the role.

Under Top knowledge actions, a user with access to all three categories (duplicates, gaps and article optimization) sees six actions, two from each. Narrower access still shows six actions, spread across the categories the user can reach, so the panel keeps its shape as permissions change.

Turning on the Knowledge Center properties

Nothing in the plugin works until an administrator enables its system properties. New users start with all properties set to true. Existing users start with all properties set to false, which protects current workflows and customizations. The feature is available on Yokohama Patch 11 and Zurich Patch 4.

The main switch, sn_km_center.glide.knowman.enable, must be true before agents can reach the plugin. The editor switch, sn_km_center.glide.knowman.ece.enable, selects the enhanced article editor when true and keeps the legacy TinyMCE editor when false. Turning the enhanced editor off also turns off article optimization features, so the change has wider effects than it first appears. The redirect property decides whether links open the updated interface or the Core UI, which matters where older customizations depend on classic forms.

Scoring and scan thresholds are set through their own properties. Stale articles are highlighted after a configurable number of days, with values from 30 to 365 accepted and anything else falling back to 365. Expiring articles are flagged from 5 to 365 days before their Valid To date, with 30 as the fallback. Automatic merging of duplicate groups is gated by a confidence threshold, and groups below it go to manual review.

Articles created in the older TinyMCE editor are reached through the KB generation skill. Articles built from custom instructions need the knowledge content recommendation skill. Teams running both editors during a transition should confirm both skills first.

Writing and editing articles in the article editor

For background on the article itself, see knowledge articles explained. The article editor handles the metadata, including the short description that serves as the title, the knowledge base and the valid to date. Authors preview the layout at desktop, tablet and mobile widths and drag columns, text, images, tables and video into the body. A word count indicator beside the size controls shows the length as the draft grows.

Knowledge blocks are reusable snippets stored as separate records. Knowledge block visibility is set by user criteria at both the knowledge base and block levels. Block-level Can Read and Cannot Read criteria control who can read a block, but anyone who meets a knowledge base Can Contribute criteria can read every block, whatever those block-level settings say. For a closer look at the blocks themselves, see knowledge blocks in ServiceNow. For the knowledge base side of those criteria, see knowledge base setup and user criteria. Templates set layout and sections, while form templates supply default content. For choosing and setting up templates, see the knowledge template guide.

ServiceNow Otto can also draft an article from a short instruction. An admin opens the Knowledge actions panel, chooses Create an article, picks a knowledge base and template, and selects Next. The author describes the article in the instruction block, reviews the output, checks grammar and selects Regenerate if the draft misses the point. The instruction block must not contain img, video, audio, canvas, svg, iframe, script, input or button tags. Selecting certain elements alone can also hide the Otto icon. For the wider picture of AI drafting for knowledge articles, see the Now Assist guide for knowledge articles.

Authors can also build a draft from files in an external Box account, once an administrator has integrated Box. Box then appears under the Integrations heading of the Source drop-down. Matching files feed the draft, and a prompt with no matches produces an article from the prompt alone. An author without a Box user account receives an error, and the administrator must set one up. The author reviews a Box-based draft for accuracy and completeness before publishing it. The integration itself uses a Client Credentials Grant app in the Box Developer Console, an OAuth entity in ServiceNow and a linked REST message, and the Get OAuth Token action confirms the connection.

Measuring article quality with the health score

The article health score runs from 0 to 100. The article optimization score contributes 80 percent of it, and the duplicate score contributes 20 percent. Administrators can change that split in the health score configuration.

The optimization score checks seven parameters. Each is scored out of 100, multiplied by its weight, and added to the total. The weights sum to 100 percent.

Scan parameter Weight What it looks for
Image alt tags 14% Alternative text on images.
Multiple H1 tags 15% More than one top-level heading.
Bad links 15% Broken or unresolvable links.
Stale or expiring article 14% Time since update and proximity to the Valid To date.
Article length 14% Enough text to answer the question, without running too long for AI retrieval.
Title relevancy 14% How closely the body matches the title.
Article readability 14% Sentence complexity and vocabulary.

The duplicate score drops when potential duplicates exist. Merging similar articles lifts the duplicate portion, while fixing the seven parameters lifts the optimization portion.

Scores roll upward. The average of an article’s scores within a knowledge base gives that knowledge base’s health score, and the average of all knowledge base scores is the gauge figure on the Knowledge Management home page. Because low-scoring articles move the average most, fixing the weakest parameter first is the practical habit, followed by checking the recalculated figure on the Health score tab.

Article Optimization scans and review cycles

Article Optimization is the automated layer that reads articles and returns findings as cards. Scheduled scans check heading tags, missing image alt attributes and title relevance for search. Some scans are script based and some are AI powered.

The Reading Ease scan runs when an article is saved, on a schedule, or both. It flags articles scoring below 60 on the Flesch-Kincaid reading ease scale and shows up to three recommendations at a time. Each one places the original passage beside a proposed rewrite. An author updates or ignores each finding, and saving re-runs the scan. Most articles pass after one or two rounds.

The length scan is script based and does not use AI. Articles under 300 words are flagged for search engine optimization and kept out of search results. Articles over 10,000 words are flagged for AI search indexing and kept out of AI-powered search results.

The stale and expiring scan identifies three states. A stale article was last updated more than a set number of days ago, defaulting to 365. An expiring article is approaching its Valid To date, with a default warning 30 days ahead. An expired article has passed that date and should be retired or deleted. A reviewer checks for outdated information, broken links and deprecated processes, then updates the text, extends the Valid To date, or retires the article. This review needs the article optimization skill and a knowledge manager, knowledge admin or knowledge role. For who holds these responsibilities, see knowledge management roles and RACI. For the wider lifecycle an article follows, see the article lifecycle workflow.

Style guides for AI-generated articles

A style guide holds plain-text instructions for language, tone, voice and terminology. Its body is sent to the language model with the prompt, so it shapes wording but not structure. The article template still decides the sections.

A knowledge admin creates the guide under Lists, Administration, Style Guides, then adds it to a knowledge base from that knowledge base’s Style Guides tab. Only active guides can be assigned, so a draft or retired guide stays inactive. The order field sets the sequence authors see, with 100 as the default and lower numbers first. A practical approach is one guide per audience, so a customer-facing article and an internal runbook do not share a tone.

Frequently asked questions

Why can’t my team see Knowledge Center after an upgrade?

Existing users start with all properties set to false. An administrator must set the main switch and the editor switch to true before the plugin opens for them.

Why don’t I see the AI options in the editor?

AI options depend on the role and on the matching skills. ServiceNow Otto must be enabled for the role, and Insights needs the AI skills active.

Does the length scan remove short or long articles?

No. It flags articles below 300 words and above 10,000 words and keeps them out of the affected search results.

Will a style guide change the structure of an article?

No. The style guide governs language, tone, voice and terminology, while the article template governs sections and layout, so the two should be set up together.