AI feature incident handling starts by containing harmful output or actions, assessing business impact, and preserving evidence. Assign a response owner, identify the deployed prompt or skill version, and choose a tested fallback. Restore service under controlled checks, then carry unresolved causes and preventive work into the problem process.
Incident classification begins with consequence before cause
Use this response sequence for an AI feature in a production service. Agree the responsibilities and thresholds within your organization before adopting it. The immediate question is what the feature has affected: an answer, a business record, a decision, or an action outside the intended scope.
A fluent but incorrect summary and an unauthorized record update need different containment. Describe the observed result without prematurely naming a root cause. Write “generated guidance omitted the approval requirement” rather than “the model failed.” The first description gives responders something they can verify and tells the service owner which work may need review.
- Output quality: incorrect, incomplete, misleading, or inappropriate content that a person may have relied on.
- Information exposure: content reaching an audience that should not receive it.
- Action failure: an unintended write, repeated operation, incorrect routing, or other unwanted execution.
- Availability failure: the feature cannot complete work, or its fallback cannot carry the resulting demand.
Allow more than one category. For priority, consider the affected business activity, whether harm is continuing, the reach of the feature, and the availability of a safe alternative. Apply your organization’s major incident criteria to that impact. An unusual answer alone does not establish a major incident; a credible high consequence exposure can justify escalation before the full count is known.
AI feature incident handling has a clear response owner
Name an incident lead to coordinate decisions, a technical owner to investigate the feature, and a business owner to judge whether the fallback supports essential work. Bring in security or privacy specialists when the observed behavior warrants their involvement. These are proposed responsibilities, not platform permission roles.
Set a communication rhythm and identify who can authorize containment. Record what is known, what remains uncertain, what action is underway, and when the next update is due. Avoid describing restoration as complete while affected users still depend on an untested workaround.
When several teams own different parts of the feature, identify a decision maker for the whole response. A prompt owner may be able to change wording but have no authority over tool access or downstream repairs. Write down these boundaries before an incident makes them ambiguous.
Containment preserves evidence about the failing path
Choose the narrowest containment that addresses the observed risk. Depending on the design, that could mean pausing one workflow, stopping automated writes, restricting a use case, or routing work to people. Verify the supported control on the deployed system before using it. Do not assume an available switch stops requests that have already started.
Check the fallback as a service in its own right. Confirm who receives diverted work, how they distinguish it from ordinary demand, and what happens when their queue grows. If manual review cannot keep pace, the business owner should agree which work can wait and which needs a separate route.
Preserve a restricted evidence bundle with the incident reference, observation time and time zone, relevant request identifiers, expected result, actual result, and deployed component versions. Include the prompt template, skill definition, retrieval configuration, model identifier where available, and tool permissions relevant to the failure. Distinguish the version requested by a deployment from the version observed serving the affected request.
Keep sensitive examples in approved restricted storage and put a reference in the shared incident narrative. Record who collected the material and any redaction applied. Evidence collection should support investigation without spreading the original exposure through screenshots, chat messages, or unrestricted attachments.
A prompt or skill rollback is a controlled change
Start with a comparison between the current deployment and the last accepted baseline. Separate prompt wording from retrieval content, tool definitions, permission changes, routing, and application code. For this runbook, treat a skill as the packaged instructions and permitted operations used for a task. Establish what that package contains in your implementation.
A prompt rollback may leave a changed knowledge source or tool configuration in place. A skill rollback may depend on an earlier interface that no longer exists. Identify those dependencies before choosing a recovery candidate. Restoring an old version number is not evidence that the old behavior has returned.
- Record the candidate baseline and why it addresses the observed failure.
- Check compatibility with current inputs, tools, access controls, and downstream consumers.
- Exercise the failure example and representative acceptable cases in an isolated environment.
- Obtain authorization through the applicable change route and record the implementation owner.
- Restore a limited scope, inspect results, and expand after the agreed checks pass.
Agree on a stop condition before implementation. If the candidate still produces the harmful behavior, return to containment and investigate the remaining dependencies. Avoid repeatedly rewriting production prompts during the incident; each unrecorded adjustment makes the evidence harder to interpret.
If the team cannot identify a reproducible baseline or a supported fallback, make those gaps part of the recovery decision. Record the deployment inventory, rollback rehearsal, and acceptance evidence still needed for the affected workflow.
Restoration is tested against the original failure
Write acceptance criteria before reviewing the recovery results. Include the reported failure, a legitimate request that should still succeed, an ambiguous input that should reach a person, and an access boundary relevant to the incident. Assign a reviewer who understands the business consequence of the output.
For generated notes, compare the result with the underlying record rather than judging readability alone. The incident summarization and resolution notes topic is a related planning reference when defining that review. For action taking features, inspect the resulting business records and downstream work as well as the generated response.
Record the test inputs, deployed versions, reviewer decision, and exceptions. Agree on a bounded observation period based on the affected workflow and its usage pattern. Look for the original failure category in new traffic and check that the fallback backlog is being handled. A quiet period with little traffic provides weak evidence of recovery.
Service restoration and problem investigation remain distinct
Keep the incident narrative focused on impact, response decisions, restoration evidence, and remaining user actions. Carry unresolved causal questions into the problem process with an accountable owner. Distinguish a suspected trigger from an established cause: a prompt deployment preceding failures is evidence to investigate, not proof by itself.
Build a timeline joining deployment events, first observed failure, first report, containment, rollback, and validation. Explain discrepancies between those times. For example, an earlier undetected failure may reveal a monitoring gap even if the later deployment attracted the initial suspicion.
Organize the investigation around competing explanations. Could source material have changed? Did the request use an unexpected language or record shape? Was a permission broader than intended? Define what evidence would support or reject each explanation. Keep failed experiments in the record so the next investigator does not repeat them.
Give preventive actions an owner, completion evidence, and a verification method. Examples include adding a regression case, tightening a tool boundary, or testing manual capacity. A general instruction to “improve the prompt” is hard to audit. If the affected feature is an ITOM AIOps specialist that handles event alerts, the onboarding and oversight topic shows how a supervisor oversees its work, which is the ownership question to settle after recovery.
Keep incident evidence useful when the cause is uncertain
When no deployment changed before the incident, compare affected and unaffected work rather than treating the release history as the only lead. Review input shape, source material, access context, dependency responses, and workload. Record each explanation as a hypothesis and specify what observation would strengthen or weaken it. This keeps the investigation open to evidence without presenting timing as proof.
Synthetic examples can help isolate one suspected condition, but preserve the connection to the original report. Note which fields or values were changed, why they were changed, and which behavior the example was meant to test. A passing result on a different input does not establish that the original incident is resolved. Use minimized, controlled evidence where sensitive content requires protection.
Track user impact separately from technical recovery
If a feature changed business records or sent output onward, create a reconciliation plan with the owner of those records. Identify the candidate records, review the proposed correction, and check downstream effects before repair. Give the reconciliation work a separate owner and completion test; restoring the feature does not establish that historical effects are corrected.
Decide whether affected users need corrective guidance with the business owner and relevant communications reviewers. Identify what users may have acted on, what they need to check or correct, and where they can request help. Track delivery of that guidance separately from technical restoration so an incident is not marked complete while a user action remains open.
When a supplier controls a suspected component, provide a restricted reproduction bundle through the approved support route and keep an internal incident owner responsible for containment. Record the response reference, requested evidence, and next review time. A pending external investigation does not transfer the internal decision about service impact, fallback, or user communication.
For help planning this work, see AI and ML services.