Enable Problem Management models in Service Operations Workspace

To enable Problem Management models in Service Operations Workspace, an admin sets com.snc.problem_management.models.enabled to True in All Properties and selects Update. New customers starting from the Yokohama release already have it set to True, so check the current value before changing it. This enables custom models for problems and problem tasks. Before changing the property, test the intended life cycle and check that your Workspace version supports models.

Decide what enabling models needs to accomplish

Problem Management models let you define states, transitions between states, and conditions for those transitions. Use them when a problem process needs a different route through investigation and resolution. Enabling the property supplies the prerequisite for creating and using those models; designing the process remains a separate piece of work.

Start with a specific requirement. For example, a team might want an additional review before a problem moves forward. Write down the starting state, destination state, and evidence the reviewer needs. That gives the administrator something concrete to configure and the process owner something concrete to test.

Keep that design connected to your Problem Management governance model. Agree who owns the proposed route and who can decide that it is ready. A property change can succeed while the underlying process still leaves responsibility unclear.

The supplied General problem model represents the base non-model problem life cycle. The supplied problem task models are Root cause analysis and General. Review these starting points before deciding which custom behavior you need. A longer list of states is worthwhile when it expresses an actual operating decision.

Check the life cycle and Workspace version before the change

Test Problem Management models in a non-production instance first. If your organization has changed the base problem life cycle or its life cycle actions, make corresponding changes in the custom models. Record those differences before testing so that a missing customization does not get mistaken for an enablement failure.

The base problem life cycle is associated with the Problem Management Best Practice — Madrid — State Model plugin, com.snc.best_practice.problem.madrid.state_model. ServiceNow included the guided base problem life cycle for new customers starting from the Madrid release. If your instance started before Madrid, use the Problem Management Migration Utility to activate the Madrid state model plugin (com.snc.best_practice.problem.madrid.state_model) and migrate records. Where it is inactive, verification and migration through the Problem Management migration utility are part of the preparation; older state implementations need compatibility review.

Check the installed Workspace version alongside the platform release. Service Operations Workspace 6.x is based on Xanadu and supports Problem Management models. Version 5.x is based on Washington DC and does not support them: enabling models there moves problem and problem task work into the classic UI16 experience. Verify these considerations against your instance and release before rollout.

Problems and problem tasks created before enablement continue with the non-model life cycle. Build a test set that distinguishes existing records from records created after the change. Otherwise, an old problem can make a successful configuration appear ineffective.

Enable Problem Management models in Service Operations Workspace

The role required for this property change is admin. Arrange for an administrator to perform the change, even if another person owns the Problem Management process. Access to process settings does not establish permission to perform this particular action.

  1. Navigate to All > System Properties > All Properties.
  2. Search the Name column for *models.
  3. Open com.snc.problem_management.models.enabled.
  4. Set the Value field to True.
  5. Select Update.

Confirm the name reads com.snc.problem_management.models.enabled before you save. The *models search returns several properties, so select this one by its full name.

After saving, reopen the property and check its stored Value. Record the previous value and the person responsible for the change in your change record. This gives the next administrator a clear starting point if testing finds a mismatch between the intended configuration and the observed behavior.

There is a separate route for process properties: All > Problem > Administration > Problem Properties. Several of these settings name the roles allowed to act, such as problem_manager for reanalyzing a canceled problem, so check who holds those roles before you change them. Keep those adjustments separate from enabling the models property.

Prove that a custom model can be created

Creating a problem model also requires admin. With the property enabled, enter prb_model.list in the navigation filter, or navigate to All > Problem > Administration > Problem Models. Select New and complete the Problem Model form. Menu availability and the system property are separate checks when the navigation route is missing.

Select Save from the form context menu before adding model states. From Model States, select New, choose the State, and set Initial state as needed. The first state added automatically has Initial state selected. Select Submit for each state you add, then review the resulting starting point against your process design.

Next, use the display/hide hierarchical lists icon to work with transitions. From Model State Transitions, select New and define From and To. Submit each transition. Where a transition needs conditions, open it and add entries through New in Transition Conditions, submitting each condition.

Automatic transition allows a transition when its conditions are met and restricts manual State selection on the problem record. Decide deliberately where this behavior belongs. Test both a record that meets the intended conditions and one that does not, rather than proving a single successful path.

If Default problem model is selected on the Problem Model form, the custom model is used for new problems. Set Default problem model only after the intended route passes on a test record. Write down the date the team agrees that new problems will use the custom model.

For help planning this work, see ServiceNow implementation.

Validate the outcome and isolate failures

Keep property persistence, model configuration, and record behavior as separate acceptance checks. Together they show that the feature is enabled, that the desired process exists, and that the selected model supports the intended work. Passing the first check does not prove the other two.

  • Property check: reopen the exact system property and confirm that Value remains True.
  • Model check: inspect the states, initial state, transition directions, and conditions in the model being tested.
  • New-record check: when the custom model is the default, create a new problem and test its expected route.
  • Existing-record check: compare an earlier problem with the new record, accounting for the earlier record’s non-model life cycle.

When a model transition is set to Automatic transition, the State field on the problem record cannot be chosen manually for that transition. Judge the configured life cycle by the transitions and conditions you built, not by whether the State field accepts a value. Do not use the absence of direct State editing as the sole signal that models failed to enable. Evaluate the configured life cycle behavior instead, and distinguish the form’s behavior from the transition rules you created.

If a new problem follows an unexpected route, inspect the intended model and its Default problem model selection before changing unrelated process properties. If the route stops at a particular state, inspect its outgoing transition and conditions. These checks narrow the investigation to the configuration involved in the observed result.

For a wider investigation, use the Problem Management troubleshooting guide. Keep the handover record specific: identify which property, model, record, and transition were tested, along with the observed result. That is more actionable than reporting that models are enabled.

Questions about operating after model enablement

What needs review before disabling models later?

Apply additional features introduced through custom models to the non-model life cycle before disabling models. Plan the return route around those process differences. Reversing the property value without reconciling them can leave the fallback process without behavior the team relies on.

Do problem tasks have to use the same custom model as problems?

Custom models can be created for problems and for problem tasks. Treat the two designs as related decisions with distinct purposes. An investigation task may need its own route even when the parent problem follows a broader review and resolution process.

Does enabling models replace root cause analysis?

The model describes how work progresses; investigators still need to determine causes and identify a fix. Align transition evidence with the investigation rather than treating movement through states as proof of a conclusion. The root cause analysis guide covers that neighboring concern.

Should the Overview tab be redesigned during enablement?

The display order of the Overview tab and the other record page tabs is set in the UX App Routes table. The fields and layout of the problem form are set with Form Builder, which requires the admin or personalize_form role. Consider that a separate design decision. If the immediate requirement concerns states and transitions, prove the model first and assess whether a presentation change would help people perform the work.

Where should the team place this change in its operating plan?

Place it alongside ownership, investigation, and resolution practices in the Problem Management plan. Record why a custom route is needed and what outcome will establish acceptance. This keeps the configuration tied to the problem process it is intended to support.