OBLYTECH Logo
OBLYTECH Logo

Configure widget loading order in Service Portal

To configure widget loading order in Service Portal, open the widget form in Service Portal Designer, enable deferred loading, and choose Viewport or Parallel. Set the device types and placeholder behavior, then save. Defer secondary content so essential page content can load first, and test the result on each selected device type.

Choose which widgets can wait

Deferred loading changes when a widget loads. It gives you a way to hold back non-essential content while the page handles its initial work. Start with the task a visitor needs to complete: finding a service, checking a request, or opening the next step. Identify the widgets that support that task before changing secondary panels.

For example, a page might put its primary action near the top and supporting information farther down. Consider the supporting information as a candidate for deferred loading. This is a planning decision based on the page’s purpose; it does not mean that a widget becomes non-essential simply because it sits below another widget.

Record the page, the widget, the intended loading mode, and the device types before making changes. A short inventory helps you compare the finished configuration with the original intention. If several copies of similar content appear in your portal, use the guide to Service Portal widget instances to clarify which placement you are reviewing.

Keep the first change small. Choose a secondary widget whose completed appearance and purpose you understand. That makes it easier to distinguish a loading-order improvement from an unrelated issue in the widget itself.

Configure widget loading order in Service Portal

The widget loading-order procedure requires the sp_admin or admin role. Check the navigation and field labels on your instance and release: Brazil uses All > Service Portal > Service Portal Designer > Widgets, while Australia and Zurich use All > Service Portal > Service Portal Configuration, followed by Designer and a page selection. The advanced sizing label also differs between these releases.

  1. Open the relevant location in Service Portal Designer and locate the widget you intend to defer.
  2. Hover over the widget and select the Form icon.
  3. Enable the checkbox labeled Select the check box to defer load this widget.
  4. Under In which order do you want to load the widget?, choose Viewport or Parallel according to the desired trigger.
  5. Set Device type for the desktop, tablet, and mobile experiences that need deferred loading.
  6. Complete the placeholder settings needed for the layout, then select Save.

After saving, review the widget in the page context. The form records the configuration, but the visitor’s experience is the acceptance test. Confirm that the content still appears and that the primary page task remains easy to reach while secondary content waits.

Avoid combining this change with a widget redesign during the first test. Keeping the content and layout stable gives you a clearer comparison. For related configuration work, see widget instance options.

Match Viewport and Parallel to the intended experience

Viewport loads the widget when it comes into the page view. Choose it when the visitor can reach the main task without waiting for that widget, and when delaying the widget until it is visible fits the page. Test by opening the page at the top and then moving down to the deferred content.

Parallel loads the widget shortly after the page loads. Choose it when the secondary content should follow the initial page load without relying on the visitor reaching its position. In a test, inspect the initial page state and the point at which that secondary content becomes available.

These choices describe loading triggers rather than a numbered sequence of individual widgets. Plan around when content is needed instead of assuming that the form establishes a precise first, second, and third position across the page. Record an observable expectation for each choice, such as supporting content appearing when its area enters view.

Compare both choices against the same visitor task if the decision is unclear. A page can feel responsive at first but still frustrate someone who needs the deferred information immediately afterward. Prefer the configuration that supports the complete interaction, including the transition from the placeholder to usable content.

Set placeholders for desktop, tablet, and mobile

Device type selects the device categories on which widgets are deferred. Make that choice deliberately rather than assuming the same page arrangement works equally well at different screen sizes. A supporting panel on desktop may sit much closer to the primary action on a narrow screen.

For explicit sizing, Brazil labels the checkbox Advance dimensions configuration; Australia and Zurich label it Advance placeholder configuration. Placeholder dimensions lets you specify height and width for the selected device types using the mobile, desktop, and tablet entries. Review both dimensions for each device you selected rather than checking one desktop appearance.

Limit widget size to placeholder retains the original placeholder dimensions to avoid layout shifts. Treat the retained space as part of your layout decision. During validation, inspect the completed widget as well as the empty area: a stable placeholder still needs to provide an appropriate space for the content that arrives.

Placeholder Template controls the custom skeleton loader. A default template is available for editing. Keep the placeholder’s shape understandable in relation to the widget it represents. An elaborate placeholder can distract from the task, while a poorly sized one can make the page look unfinished even when the loading behavior is correct.

  • Check the waiting state at the device sizes selected in the form.
  • Inspect nearby headings and actions as the widget appears.
  • Review the widget’s final content within the retained dimensions.
  • Confirm that the placeholder disappears into a usable completed experience.

If a sizing problem belongs to the widget’s design, investigate that separately through custom widget development. Keep the loading configuration and the content design understandable as separate decisions.

Review AI Search asset deferral separately

AI Search has an additional deferred-loading setting. The system property glide.service_portal.ais_defer_load_enable.list determines which portals use deferred loading for certain AI Search assets. Its value is a comma-separated list of portal url_suffix values. Deferred loading is enabled for the Service Portal by default.

Those assets are delayed until the main page content has loaded. Review the portal suffix values when assessing this behavior; a widget’s Viewport or Parallel selection does not substitute for checking the AI Search property. Keep a record of the intended portal values so the review focuses on the portal being tested.

When the web embeddable feature is enabled, AI Search assets cannot be deferred and load alongside the other widgets on the portal page. Check this condition before investigating why an expected AI Search delay is absent. Changing placeholder dimensions would not address that condition.

For help planning this work, see ServiceNow implementation.

Validate the complete page before widening the change

Use a short acceptance checklist for the first widget. Compare the initial experience, the deferred widget’s arrival, and the completed page. Keep the test page, device category, and visitor task consistent so you can judge the effect of the configuration without changing several conditions together.

For Viewport, inspect the transition as the relevant area enters view. For Parallel, inspect what follows the initial page load. In both cases, check whether nearby actions remain easy to use and whether the finished content fits the chosen placeholder. A faster-looking opening is insufficient if the next action becomes confusing.

Record a pass or a specific observation for each check. Replace vague notes such as “still slow” with the affected widget, its mode, the device type, and the point in the interaction where waiting causes trouble. That gives the next investigation a defined starting point.

Once the first configuration behaves as intended, review another candidate against the same criteria. Broader layout changes belong in a separate review of Service Portal customization.

Questions to resolve during a loading-order rollout

What should a change record include?

Include the affected page and widget, the reason for deferral, the selected mode, device coverage, and placeholder decisions. Attach the acceptance observations so another administrator can understand why the configuration was chosen.

How should the team decide between competing requests?

Ask each requester to identify the visitor action that depends on the content. Use that dependency to prioritize the review. A panel’s visibility to internal stakeholders is a weaker basis than a clear need in the visitor’s task.

What if a result cannot be reproduced?

Capture the starting page position, device category, and exact interaction sequence. Repeat that sequence before drawing a conclusion. An observation without its starting conditions is difficult to compare with another tester’s result.

When should a rollout pause?

Pause expansion when the initial change leaves an unresolved usability problem, missing content, or an unsuitable completed layout. Resolve the specific observation before applying similar settings elsewhere; a small successful trial provides a better basis for the next decision.