OBLYTECH Logo
OBLYTECH Logo

ServiceNow On-Call Schedule: Setup, Rosters and Escalation

A ServiceNow on-call schedule decides which member of a support group is assigned and reachable when work arrives. You build it in the On-Call Scheduling application by defining shifts, adding rosters on a rotation, choosing who is contacted when nobody responds, and publishing. The schedule wizard walks you through those steps in sequence.

How the application picks the person

The application finds the assigned and available member of a support group, for example when an incident is assigned to that group. It rotates through a hierarchy of duty rosters to make that choice. For the incident side of assignment, see incident and problem management in ServiceNow.

Term What it means in the application
Shift The period during which a roster’s members are on call.
Roster A set of members on call for a shift, usually one per escalation level such as primary, secondary and tertiary.
Rotation The exchange of the turn of duty between roster members, decided by each member’s From and To dates.
Schedule The times at which shifts are active, such as a 24×7 schedule or a Workday 8-5 schedule.

Activating the plugin and assigning roles

The functionality comes from the On-Call Scheduling plugin, identified as com.snc.on_call_rotation. An administrator with the admin role installs it from All, then System Applications, then All Available Applications. On an instance with domain separation and delegated administration, the installing administrator must be in the global domain, or an error appears. The ServiceNow IT Service Management guides cover the wider process.

Building a schedule needs the rota_admin or rota_manager role. A rota_admin, the shift administrator, can create, read, update and delete shifts and modify rosters. A rota_manager manages shifts for a group that person manages or has been delegated. Members with the itil role get read-only access to their group’s shifts. The on-call administrator role, sn_on_call_admin, configures the schedule features and trigger rules.

Building the schedule in the wizard

Open All, then On-Call Scheduling, then Create/Edit Schedule. In the Define Schedule step, choose the group from the Select Group choice list and click Add shift. A new group schedule opens the schedule wizard.

Define the shifts

Choosing Yes to reuse an existing schedule lets you start from a base schedule such as 24×7 or Workday 8-5. Choosing No lets you set the time zone, whether the shift is all day, and its start and end times. The date changes when a shift crosses midnight, so an 8 p.m. to 8 a.m. shift ends at 07:59:59 the next day.

Shifts can overlap, which creates a hand-off period. Select Allow Shift Schedule overlap, and an Escalation rule on shift overlap option appears. It sends escalations to the incoming shift, the outgoing shift, or all shifts.

Configure the roster and rotation

Move the people you want from the Available list to the Selected list. Set the rotation start date and the rotation interval. For a weekly rotation, set how often it rotates and the day it starts.

Avoid building a long monthly or yearly cover by hand. Use one roster with one member for the whole period, and record exceptions as one-time roster changes.

Setting up escalation and the catch-all

The escalation type is set for you. A shift with one roster uses Rotate Through Members, so the path runs through the members of that roster. A shift with several rosters defaults to Rotate Through Rosters. Click Override escalation to change this.

The catch-all receives the escalation when no one on the shift acknowledges it. The options are none, a group manager, a shift manager, an individual, or any or all roster members. Choosing Notify All notifies all shift members.

Reminder settings set the timing. The Edit Reminder form sets the number of reminders, the time between reminders (default 15 minutes), and the time before escalation, which is the interval the system waits before escalating a task. A roster can also require one channel: SMS, voice, email, Microsoft Teams or mobile push. SMS and voice need Notify turned on. A member without an SMS device receives no further attempts, and the lack is logged.

Trigger rules and escalation policies

An escalation is a series of notifications to roster members for one task, in escalation-path order. A trigger rule starts it when its conditions are met, then runs the workflow, subflow or script you choose as its action. For escalations driven by service-level breaches, see SLA breach escalation notifications.

To create a trigger rule, open All, then On-Call Scheduling, then Administration, then Trigger Rules, and click New. Set the name, task table, execution order and When to activate. Match conditions decide whether All or Any conditions must be met. Setting the Group field makes the rule group-level, and leaving it empty makes it global.

Your role limits the trigger action. A rota_manager can create workflow triggers for managed groups. A rota_admin can create workflow or subflow triggers for all groups. The admin role can use workflow, subflow and script triggers for all groups, and script triggers are limited to the rota_admin and admin roles. Four subflows serve on-call triggers, including On-Call: Assign and On-Call: Escalations by Email.

Escalation policies are built in the Service Operations Workspace. From the Teams menu, choose All Shifts, select the shift card, open the Escalation triggers and policies tab, and under Escalation policies click Create policy. From the Schedules menu, select the shift card and use the Escalation policies tab, then Open Team Record. Either route needs the rota_manager or rota_admin role.

A policy sets an order number, a shift and conditions, which are a table and a condition set. When a team has several triggers, the one with the smaller order number is checked first. Notification steps can be email, call or SMS, and further escalation levels are added from the policy form.

To review an escalation, open the Escalation Logs view under All, then On-Call Scheduling, then Escalations. The log record holds the timeline and actions. Only the rota_admin and admin roles can open it.

Publishing and sending subscriptions

Saving the schedule puts it into Draft mode. Review it, then click Finish to save and publish. Select Send subscriptions to send a subscription URL to an on-call member after the shift is published.

Managing the schedule once it is live

Roster changes are made from My Group Schedules, through the roster record. Adding a member takes a From date, and the member’s place in the order is set by choosing the member they follow. Removing a member takes a From date too. Select Delete member only when you also want the member’s rotation history removed, because that changes other members’ rotation history. Moving a member places them after a target member or swaps them. The original record gets a To date, and the new record starts on the current date.

A roster member can request time off and propose a colleague to cover. A shift manager with the rota_manager role approves or rejects the request from the Time-off requests list in the ITSM Mobile Agent app (My team, then the On-call Schedule tab). Add a reason when you reject a request. If the group’s time-off setting requires approval, the request stays pending until it is approved.

Gaps and conflicts appear under Pending Actions on the shift. A gap can come from time off with no cover, a member moved out of the group, or a member marked inactive. A conflict happens when one person is both primary and secondary point of contact. To close a gap, click Review, add a To value for the unavailable member, then add a replacement with a From value.

From the Calendar or Timeline view, Manage Shift lets you schedule time off, and the form includes a proposed cover. In the Timeline view, the Time zone filter shows working hours for a time zone you choose.

Working in Service Operations Workspace

The Teams menu lists all teams. Selecting a team card opens its schedule, escalation policies and team preferences. Team preferences set the shift manager, start day of the week, absence request handling, shift overlap and overlap escalation rules. Each person sets how escalated tickets reach them under their notification preferences.

A rota_admin can open the On-Call Onboarding wizard from the Teams page to configure several teams at once. It maps shift templates, takes a roster spreadsheet and can attach escalation policies in the same pass. If you would rather have the schedule designed and configured for you, see ServiceNow ITSM and Service Operations.

Frequently asked questions

What happens when nobody acknowledges an escalation?

The catch-all receives it. You set the catch-all in the Escalation Setup step, and it can be a group manager, a shift manager, an individual, or any or all roster members. Reminders go out first, and the time before escalation sets how long the escalation waits.

Who gets an escalation when a shift has several rosters?

The escalation type defaults to Rotate Through Rosters, so the path moves across the rosters. A shift with one roster rotates through that roster’s members instead.

Can a member change how they are contacted or ask for time off?

Yes. Members set their notification preferences, which control how escalated tickets reach them, and submit time-off requests with a proposed cover. A shift manager approves or rejects them.

What should I do when someone leaves the group?

Remove the member from the roster with a From date. A member who has moved out of the group or is marked inactive also shows up under Pending Actions as a gap.