OBLYTECH Logo
OBLYTECH Logo

Create a Shell Topic to Call Google Dialogflow Topics From Virtual Agent

A Bot Interconnect Dialogflow shell topic gives ServiceNow Virtual Agent a topic that calls a Google Dialogflow secondary bot. Create the topic, align its discovery information with the Dialogflow intent or topic, and add the appropriate Bot Interconnect topic block. Set the integration action and subflow type, then save, publish, and test.

Prepare the Dialogflow intents and connection

Before building the shell, create one or more intents in Google Dialogflow and configure the Google Dialogflow connection in your Virtual Agent Bot Interconnect instance. The shell depends on both pieces. Creating a ServiceNow topic does not replace preparing the secondary bot or establishing its connection.

The role required for this shell-topic procedure is virtual_agent_admin or admin. Assign the work to someone with one of those roles. Treat connection preparation and Dialogflow intent design as prerequisites with their own checks; do not assume the shell-topic role statement defines permissions for work inside Google Dialogflow.

Prepare a small mapping record before opening the designer. Record the intended discovery method, the Dialogflow intent or topic being called, the ServiceNow shell name, and, for LLM discovery, the description. This is a recommended working record rather than an additional product setting. It makes mismatches easier to catch before publication.

Keep the first test focused on a known secondary-bot topic. A broad collection of intents makes it harder to distinguish a discovery problem from a configuration problem. Once one route works, extend the test set to cover the other mapped intents. The goal is evidence that the intended route works, rather than evidence that a conversation merely started.

Choose the Bot Interconnect Dialogflow shell topic mapping

Choose between a separate shell for each Dialogflow intent and a grouped shell that represents several intents. The grouped arrangement applies to NLU topics. This decision affects how you name the shell and where you place the phrases used for discovery, so settle it before assembling the flow.

Use a separate shell for an individual intent

For an NLU topic representing one Dialogflow intent, give the Virtual Agent topic the same name as that intent. If the secondary bot has distinct intents for checking a reservation and changing a reservation, the separate-shell approach uses matching Virtual Agent topic names for those two intents. These are illustrative names, not required values.

For LLM topics, match both the name and description of the Bot Interconnect topic to the corresponding Google Dialogflow topic. A similar title with a different description does not satisfy that mapping rule. Compare the two fields together during review, particularly when someone has edited the ServiceNow description for readability.

Group multiple intents for NLU discovery

A grouped NLU shell can represent several Dialogflow intents under a broader ServiceNow topic name. Include the Dialogflow intent names as keywords or as utterances in the corresponding Virtual Agent intent, according to the topic discovery method. A descriptive umbrella name does not replace those discovery entries.

For example, a reservation-help shell could group the two reservation intents. The review should show which phrases are keywords and which are utterances, rather than leaving that decision implicit. For the neighboring discovery mechanics, see keyword topics and matching in Virtual Agent.

Do not extend the grouped NLU pattern to LLM discovery. The LLM arrangement uses the corresponding topic name and description. If your project is changing discovery approaches, review Virtual Agent LLM topic discovery and NLU migration before carrying an existing grouping decision into the new design.

Create the shell in the topic designer

Navigation depends on the release. Brazil and Australia use All > Conversational Interfaces > Assistant Designer, followed by Asset library. Zurich also uses Assistant Designer and identifies a discovery toggle labeled LLM or NLU/Keyword. Yokohama and Xanadu use All > Conversational Interfaces > Virtual Agent > Designer. Check the route and discovery controls on your instance and release.

  1. Open the applicable designer and create the topic that will represent the Dialogflow intent or intents.
  2. Apply the mapping selected earlier. For NLU discovery, include the Dialogflow intent names as keywords or utterances in the corresponding ServiceNow Virtual Agent intent.
  3. For LLM discovery, compare the shell topic name and description against the corresponding Google Dialogflow topic.
  4. Open the Flow tab and drag a Topic Block utility node onto the canvas.
  5. Select that node to configure its properties.

Keep the discovery review separate from the node review. The name, description, keywords, and utterances concern how the shell is found. The Topic Block properties concern the integration call made by the shell. A correct value in one part does not prove that the other part is correct.

The shell pattern centers on a Topic Block utility node. If you need context for that design element, see topic blocks in Virtual Agent design. Keep this shell focused on the intended secondary-bot route so its purpose remains clear when another administrator opens the flow.

Set the integration properties precisely

In the selected node, use the Topic Block property to choose Bot Interconnect for an NLU topic. For an LLM topic, choose Bot Interconnect – LLM. Match this choice to the discovery approach used when creating the shell.

Set Action Name to sn_va_bot_ic.dialogflow_bot_interconnect_integration. Set Action Type to subflow. Preserve the full action identifier, including its prefix and underscores. A shortened project nickname belongs in your working notes, not in that field.

Before saving, compare these three properties with the mapping record. The Topic Block selection should agree with NLU or LLM discovery, while Action Name and Action Type should contain the integration values above. This comparison is a recommended review step; it does not require adding another node or inventing additional parameters.

Select Save, then Publish. Treat these as separate steps in the handover record. A saved design is not evidence that the publication step was completed. For help planning this work, see ServiceNow implementation.

Test the published route and narrow down failures

Test the configuration through a channel where Bot Interconnect is deployed. Topics available in the secondary bot can be executed from those channels. Record which channel, shell, and secondary-bot topic you used so someone reviewing the result can understand the route you actually exercised.

For a grouped NLU shell, test the distinct intent phrases included in its mapping. One successful phrase does not demonstrate coverage of the remaining phrases. For separate shells, test each intended route independently. These are testing recommendations designed to expose incomplete mappings before users depend on them.

  • If the intended shell is not discovered, compare its discovery entries with the selected mapping approach.
  • If the wrong integration block is present, check whether the topic uses NLU or LLM discovery before changing the block.
  • If the flow configuration looks correct but the route still fails, revisit the prepared connection and the intended Dialogflow intent.
  • If a recent change appears absent during testing, verify that Save and Publish were both completed for the topic you changed.

These checks narrow the investigation; they do not establish a universal cause for a failed conversation. Avoid changing several unrelated values between tests. Record the observed result, make one justified correction, and repeat the same route so the effect of that correction can be assessed.

Questions to settle during shell-topic handover

What should the handover record contain?

Include the shell name, discovery approach, mapped secondary-bot topics or intents, the three Topic Block property values, and the channel used for testing. This recommended record gives the next administrator enough detail to reproduce the test without reconstructing the design from memory.

How should teams divide ownership?

As a working arrangement, name an owner for the ServiceNow shell and an owner for the Dialogflow intent definitions. Agree who tells the other team about naming changes. That coordination matters because discovery mapping spans both products, even though the shell is created in ServiceNow.

What makes a good review example?

Choose a request with one clear intended destination and document the expected secondary-bot topic. Avoid starting with a phrase that could reasonably represent several requests. A focused example makes the review easier to assess and gives later regression checks a stable starting point.

When should the mapping record be reviewed again?

Review it when intent names, topic descriptions, discovery choices, or grouped coverage change. This is a maintenance recommendation rather than a scheduled platform requirement. Keeping the record aligned with the design helps prevent an older test result from being treated as proof of a newly changed route.