OBLYTECH Logo
OBLYTECH Logo

NLU Workbench Advanced Features: Tools, Setup and Testing

NLU Workbench Advanced Features is an add-on that gives admins tools for checking and improving ServiceNow NLU models. It scores predictions against real user confirmations, flags overlapping intents, runs test utterances against several models at once, and sends chat utterances back into training. Intent Discovery is a separate Store app that suggests new intents from historic incident records.

What the add-on adds to NLU Workbench

The add-on extends the base NLU Workbench, so a model you have already built gains review tools. New to NLU models? The NLU model explainer covers building them first.

Feature Question it answers
Multi-model Batch Testing How accurately do one or more models predict intents for a test set?
Cross-model Conflict Review Which intents or utterances overlap within or across models?
NLU Model Performance How often did Virtual Agent users confirm the predicted topic?
NLU Expert Feedback Loop for VA Is each Virtual Agent chat utterance matched to the right intent?
Irrelevance detection Which utterances should produce no prediction at all?
Issue Auto Resolution tuning How can the ITSM model behind Issue Auto Resolution improve?

Batch testing and conflict review sit under NLU Advanced Features. Performance and the feedback loops sit under the main NLU Workbench menu.

Installing the add-on and its prerequisites

An admin installs the add-on from All, then System Applications, then All Available Applications. Search by name or by its ID, com.snc.nlu.workbench.advanced, select Install and read the dependency list. Any missing plugin or application must be installed first.

Three plugins must be active beforehand: Predictive Intelligence (com.glide.platform_ml), NLU Workbench – Core (com.glide.nlu) and NLU Workbench (com.snc.nlu_studio). The instance also needs valid ServiceNow entitlements for the add-on and its Store dependencies. Two tools read Virtual Agent chat data, so the Glide Virtual Agent plugin (com.glide.cs.chatbot) must be active for NLU Model Performance and the Expert Feedback Loop.

Who can use each tool

Batch testing, conflict review and irrelevance detection use the nlu_admin or admin role. An nlu_editor can work on the models assigned to them. The feedback loop requires nlu_admin. Issue Auto Resolution tuning needs at least nlu_feedback_admin.

Building test sets for batch testing

A test set is a CSV or XLSX file with two columns, titled Utterance and Expected intent. It can hold up to 10,000 rows, and its utterances must be in the same language as the model under test. Leave Expected intent empty for utterances that should produce no intent. Around 10 percent of rows should be like this, because they check whether the model stays quiet on input that belongs to no intent.

Include utterances users are likely to send, and cover the intents in your models. Expected intents that match nothing in your models are skipped. For a non-English test set, set the glide.import.csv.charset system property to UTF-8 first.

Open Test sets under Multi-model Batch Testing, choose Create test set, name it, pick a language, select your file and click Create. Later rows can be added with Import utterances, and any test using the set should be rerun afterwards so its results reflect the new rows.

Running a batch test and reading the results

Before a run, the required plugins must be active and you need at least one trained Virtual Agent or AI Search model. A run can cover up to ten models; fewer models finish sooner.

Choose Run a test, select the models and test set, then click Run. For a multi-model run, the test set must cover at least 25 percent of the intents across those models. Aim for at least 60 percent coverage, because below that level the recommended confidence threshold may not be optimal.

The result overview shows a prediction breakdown and the top five missed and incorrect intents. An utterance with no expected intent counts as correct when no intent is predicted. The Detailed results tab shows outcome and confidence per model and exports to CSV. Review the confidence threshold recommendations in NLU model settings after a run.

Finding conflicting intents with Cross-model Conflict Review

Conflicts appear when utterances in two intents nearly match. A review runs on one model or on two, and it uses the last trained version of each, so train before you run one.

Reviews come in two types, Critical and Moderate. Start with the Critical ones. For each conflict you can ignore it when the overlap is acceptable, delete an identical or nearly identical utterance from one intent, or edit utterances so the intents separate more clearly.

Take two intents, one for a printer that will not print and one for a printer that prints slowly, both holding the utterance “the printer is acting up”. That utterance fits the slow-printing intent better. Deleting it from the not-working intent, training the model and returning to the list marks the review as reviewed. Irrelevant utterances that resemble intent utterances appear here as NO_INTENT and must be changed on the Irrelevance detection page.

Scoring Virtual Agent predictions with NLU Model Performance

NLU Model Performance measures predictions by what end users tell you. When a user confirms or rejects a topic, the chart places that outcome into one of nine scenarios, such as user confirmed as correct, or no prediction made with the fallback topic launched.

The page needs at least 5,000 Virtual Agent utterances in the instance. An nlu_admin can change that limit through the sn_nlu_workbench.glide.nlu.performance.min_clustering_records property. Configure Conversational Interfaces settings first, from the top of the landing page.

Language and Model filters default to all, and Date range offers the past 30, 60 or 90 days or a custom range. A longer range gives the analysis more data. Choosing a model sets the language to match. The Include translated conversations switch adds conversations that used dynamic language translation.

The Unsupported utterances tab holds clusters where NLU made no prediction or the user rejected the predicted topic. Expand a cluster and select Run analysis or Rerun analysis to pull in the latest utterances.

Training from chat logs with the NLU Expert Feedback Loop

The Expert Feedback Loop lets an nlu_admin mark utterances from Virtual Agent chat logs. On a 30-day cycle the system pulls up to 300 samples chosen to represent the logs, each with a predicted intent. Mark each one as NLU_Match if the prediction is right, as Mismatch if it belongs elsewhere (then pick the correct intent), or as Unsure, which moves it to a Needs further review group.

The Tune model button is always enabled and moves the utterances you have marked into the model and its test set. Model quality improves once at least 100 utterances are marked. The default split is 60 percent for training and 40 percent for testing, and both can be changed. A portion of the reviewed utterances can be pushed into the model’s default test set, and the system tags each one with its source.

Utterances matching no Virtual Agent intent appear under Uncategorized. Pair each one with the right intent and model in the Corrected Intent column; the change saves when you make the connection.

To pull more data on demand, an nlu_admin runs the Active Learning scheduled job with Execute Now, after raising four properties: va_chat_logs.max_row_limit, label_candidate_table.max_data_size, label_table.max_data_size and label_candidate_table.max_response_size. Feedback survives a model move or an upgrade, but not an instance clone; for a sub-production instance, import the open_nlu_predict_intent_feedback table from production.

Using Intent Discovery to find new intents

Intent Discovery is a separate ServiceNow Store app, installed as sn_nlu_discovery by an admin. It supports incident deflection by reading historic records and showing which prebuilt intents would help Virtual Agent and AI Search, and which custom intents are worth building.

To run an analysis, choose the incident table, filter by created date and set the field to analyze to short description. Set Taxonomy to Classification, ITSM or blank, where blank defaults to Classification. Select the check box to cluster unmapped records by keywords, name the report and select Run analysis. A run moves through Preparing to run, Work in progress, Clustering and Done, and can take five to thirty minutes.

The report lists recommended intents and unmatched records. Add a recommended intent to a model in the same application scope, or add a cluster’s phrasings to an existing intent. Run Again creates a new version for comparison. Unmatched-record share and recommended-intent count are separate figures.

Weighing classic NLU topics against LLM topics? The guide to migrating NLU topics to LLM topics in Virtual Agent covers that choice.

Tuning the Issue Auto Resolution model

The Issue Auto Resolution tab has no Create new model button, because the IAR-ITSM model is prebuilt. Tuning starts in the IAR Admin Console; if the ITSM model is untrained there, the workflow sends you to the Expert Feedback Loop steps first, which are covered earlier on this page. IAR models cannot be moved using update sets.

Frequently asked questions

Do I need the Virtual Agent plugin for any tool in the add-on?

Yes, for two of them. NLU Model Performance and the Expert Feedback Loop read Virtual Agent chat data, so the Glide Virtual Agent plugin must be active for those two.

How many marked utterances does the feedback loop need before tuning?

At least 100. The Tune model button reminds you of that goal if you press it early.

Why does a conflict list show NO_INTENT?

Irrelevant utterances appear as their own group, named NO_INTENT, when they overlap with intent utterances. They cannot be edited on the conflict page, so change them on the Irrelevance detection page.

Is Intent Discovery included when I install the add-on?

No. It is a separate Store application that an admin installs on its own.