OBLYTECH Logo
OBLYTECH Logo

Virtual Agent Lite Setup Steps

For ServiceNow Virtual Agent Lite setup, activate the conversation topics plugin, review and test the supplied topics, then duplicate a tested template. Set its description, keywords, and user roles before saving and publishing it. Finish by checking the published conversation in the chat client with a user from the intended audience.

Check whether the Lite setup applies to your instance

Starting with Brazil, ITSM Virtual Agent Lite is being prepared for future deprecation. ITSM Virtual Agent Lite has legacy status. It is hidden and no longer installed on new instances, while existing installations continue to be supported. Check your instance and release before planning activation. Treat this workflow as a setup path for an applicable Lite installation rather than a starting assumption for a new instance.

Lite provides keyword-based conversations for a limited set of IT support needs. Its supplied templates are read-only. You can review, duplicate, and publish those conversations in Virtual Agent Designer, but Lite does not support creating new topics, topic blocks, or custom controls. Establish that boundary before collecting requests for a larger conversation catalog.

Start your work record with the instance, selected conversation, intended audience, and person accepting the result. If your team needs the wider context first, use the plain-language guide to ServiceNow Virtual Agent. Keep this setup focused on bringing a supplied Lite conversation into use.

Activate the conversation topics and inspect the templates

The quick-start and setup actions require admin or virtual_agent_admin. Activating ITSM Virtual Agent Conversation Topics Lite, identified as com.snc.itsm.virtualagent.lite, also activates Service Management Virtual Agent Core, identified as com.glideapp.sm_va_core. Distinguish these setup permissions from the end-user roles you will assign to a conversation later.

  1. Navigate to All > Plugins.
  2. In Search, enter ITSM Virtual Agent.
  3. Find ITSM Virtual Agent Conversation Topics Lite and select Activate.
  4. Navigate to All > Conversational Interfaces > Virtual Agent > Designer.
  5. In Category, select ITSM Self Service Lite, then open the topic you want to review.

The supplied choices include Check Ticket Status and Report an Issue. Check Ticket Status lists the user’s active incidents or requests, including the item, Stage, and update information. Report an Issue lets a user create an incident through a Record Producer. Choose the conversation by the outcome the employee needs, then prepare examples for that outcome.

For a status conversation, prepare an employee with an active ticket and record what that employee should recognize. For incident reporting, write a short sample issue and agree what a satisfactory report should contain. These are suggested acceptance preparations: their purpose is to make the later test assess a service outcome instead of merely showing that a conversation opens.

Preview first, then duplicate the tested topic

Preview and test the prebuilt conversation before duplicating it. The duplicate-and-publish action requires virtual_agent_admin or admin. Keep a note of the template you tested, the scenario you used, and any unexpected result. Resolve uncertainty about the supplied conversation before changing its visible properties.

  1. In the tested topic, open the triple-dot icon on the Virtual Agent Designer header bar and select Duplicate.
  2. Enter a name for the duplicated topic in the pop-up window.
  3. Select Save. The duplicate opens on the Topic Properties page, in the Properties tab.

You can duplicate a prebuilt topic, but you cannot duplicate a copy of a prebuilt topic. Use a naming convention that helps reviewers distinguish the original template from the copy intended for publication. Record that relationship in your work notes so a later administrator can identify the starting point without guessing from similar names.

Do not plan a chain of copies as your rollout method. If another attempt is needed, return to the prebuilt template and decide which copy will be maintained. As a working practice, assign an owner before producing several similarly named candidates. That keeps the acceptance discussion tied to a specific conversation.

Set the properties that determine how users find the topic

The duplicated topic lets you adjust Description, Keywords, and Roles. Description explains what the conversation does. Keywords are words or phrases associated with activating the topic; they can be added, changed, or deleted. Roles specifies the roles an end user needs to view and run the topic.

Write the description around the user outcome. Then choose keywords that match how your intended audience asks for that outcome. Keep a small review list containing each proposed phrase and the conversation it should reach. In practice, a broad request for help tends to need closer review than a phrase that clearly asks about an existing ticket.

Lite uses keyword-based conversations and does not support NLU models or NLU-enabled topics. Design your phrase checks around those keywords. Avoid making acceptance depend on understanding unrestricted variations of a request. Where a phrase is ambiguous, ask the service owner which outcome they intend before changing the keywords.

For Roles, decide whether the audience must be authenticated and which users should see the conversation. If the topic is public, including access for unauthenticated guest users, select only the Public role. Make this a deliberate audience decision. Use the Virtual Agent security and access design guide to organize the wider access review.

This is a good point to resolve a scope mismatch. If the requested experience depends on new conversation logic or capabilities outside Lite, settle the implementation approach before publication. For help planning this work, see ServiceNow implementation.

Save, publish, and check the employee experience

Save the changed properties. Then open the triple-dot icon and select Publish. Publishing the duplicated conversation makes it active and available in the chat clients. Users see published topics in the topic selection menu; when three or fewer topics are available to a user, the choices appear as buttons.

The broader ITSM setup flow also exposes activation in the Designer header: select Inactive and move the toggle to Active, then select Publish. For this duplicate workflow, complete the property changes and use the duplicate’s publication sequence. Keep the acceptance record clear about which topic copy you published.

For an active, published conversation, open the topic in Virtual Agent Designer and select Test. Follow that with an audience check in the intended chat client. Lite appears in the Service portal by default; configuring additional portals is an optional setup task. If messaging integration is in scope, the quick start also requires administrator access to the messaging application.

  • Confirm that the intended employee can find the published topic.
  • Try the agreed keyword phrases and record which conversation opens.
  • Complete the service scenario and compare the result with the acceptance example.
  • Check a user outside the intended audience when reviewing role-based visibility.
  • Record the topic name, tester, result, and unresolved issue before accepting the setup.

A successful Designer test and a successful employee check answer different review questions. Keep both in your evidence. For a wider release review, use the Virtual Agent testing and acceptance checklist to organize scenarios and sign-off.

When a test fails, describe the earliest point where the observed experience differs from the expected one: finding the topic, starting it with a keyword, seeing the right information, or completing the request. That distinction gives the next reviewer a reproducible problem. Include the user context and topic copy in the record so the review does not compare different audiences or conversations.

Limits of a Lite rollout

Lite supports only simple, non-actionable notifications

Lite supports simple, non-actionable notifications. Actionable notifications are outside its supported capabilities. If your acceptance scenario asks an employee to take action directly from a notification, separate that requirement from this setup and assess the appropriate product scope before promising the experience.

Lite localized content is read-only

Localized content in Lite is read-only. Administrators cannot add new translations or localize that content, and information in the Languages tab is read-only. Collect the intended language needs during planning so the team can compare them with the content available for its audience.

The Analytics Dashboard is not available in Lite

The Virtual Agent Analytics Dashboard is not available in Lite. Plan the acceptance evidence accordingly: retain the tested scenarios and observed results rather than making dashboard access a completion condition. Keep any broader reporting requirement visible as a separate implementation decision.

Lite topics do not run in custom chat channels

Lite does not run its topics through custom chat integrations outside its supported messaging integrations. Do not assume that an existing custom chat surface is a suitable destination. Identify the required employee channel early and compare it with the supported integration choices before scheduling the rollout.