OBLYTECH Logo
OBLYTECH Logo

Virtual Agent Notifications Setup

To set up ServiceNow Virtual Agent notifications, identify the delivery surface, enable its notification setting, and check the notification’s delivery channels. For Now Mobile unread messages, enable device push permissions and review user preferences. Test receipt while the app is inactive, then confirm that tapping the notification resumes the intended conversation.

Choose the notification experience before changing settings

Start with the user’s situation: an employee leaves a conversation in Now Mobile and needs to know when a reply arrives. Now Mobile can send push notifications for unread chat and Virtual Agent messages after the user navigates away from the app. That is a different acceptance test from seeing a notification inside a portal’s enhanced chat.

For a mobile test, the expected action is returning to the corresponding conversation. For an actionable enhanced-chat notification, it is opening the conversation and using the associated actions. A successful portal test does not establish that mobile push delivery works.

The mobile push steps follow the Australia and Zurich topics. The Brazil release marks that topic as (Legacy) with the same steps, so confirm push behavior on your own release before relying on them. The enhanced-chat and delivery-channel steps match the Brazil topics. Check the settings and experience on your instance and release before applying changes. If your team needs the wider context first, use the plain-language Virtual Agent guide to align the scope.

Prepare Now Mobile for unread-message push notifications

On the test device, enable push notifications for the Now Mobile app in iOS or Android. In a base system instance, Virtual Agent Message Push is enabled for Now Mobile users. Users can review their preferences at All > Self-Service > My Notification Preferences. Treat device permission and the user preference as separate checks in your test notes.

Use both checks because they answer different questions: the device permission controls whether the app may display pushes, while the user preference controls Virtual Agent Message Push. An enabled device setting does not prove that the user preference is enabled, and the preference does not prove that the app can display notifications.

  1. Choose a test user and device, and check whether device push permission is enabled.
  2. Review that user’s notification preferences for Virtual Agent Message Push.
  3. Start an active conversation in Now Mobile, then navigate away from the app.
  4. Have an unread reply arrive after the app is no longer in use.
  5. Watch the notification center for that unread message.
  6. Tap the push notification and verify that Now Mobile opens the corresponding conversation.

Keep one test log per run with the channel, setting, times sent and received, and the title and final section of each notification.

The notification center or lock screen is the place to check receipt. These push notifications do not appear under the notifications tab inside Now Mobile, and they do not create badge numbers on the app icon. Badge numbers do appear on the Virtual Agent quick launch icon within the app. Include those different locations in tester instructions so an empty app notifications tab does not become a false failure.

Allow for batching when checking mobile delivery

The system checks which user accounts are registered for push notifications and identifies mobile clients that are not in use. The Generate Virtual Agent Push Notification scheduled job runs every 60 seconds, batches new unread messages, and adds unread-message records to Push Notifications [sys_cs_message_notification], which generates the push notifications.

Arrival can take slightly longer than one minute, and messages may arrive in a different order from their generation order. Allow a little more than one minute for delivery, and do not use lock-screen order as proof of conversation order. Messages can arrive in a different order from their generation order.

If the test does fail, work through the evidence in sequence: device permission, user preference, inactive mobile client, unread message, scheduled processing, then device receipt. This is a recommended investigation order. Change only one setting between attempts, and check device permission, user preference, client activity, unread status, scheduled processing, and receipt in that order. That keeps the test focused on the earliest failed step.

Enable ServiceNow Virtual Agent notifications by channel

Enabling notifications for the supported chat channels requires virtual_agent_admin or admin. Match the setting to the surface being tested. Enhanced chat uses the sn_nowassist_va.nass_notification_enabled system property in System Properties (sys_properties.list); its default value is true. Inspect its current value rather than assuming the default remains in place.

For the chat widget, identified as mweb, navigate to All > Conversational Interfaces > Settings, select Virtual Agent, and enable Use notifications under Notifications. For a custom chat integration, enter sys_cs_channel.list in the All filter navigator. In Messaging Channels, open the custom integration record, select Enable Notifications, and select Update.

Assign delivery channels to the notification content

Configuring a delivery channel requires virtual_agent_admin. A messaging channel must already be configured, and chat-channel selection is limited to channels associated with the instance. The same notification content can have multiple delivery channels, so agree on the intended destinations before editing its associations.

  1. Navigate to All > System Notification > Provider > Notifications.
  2. Select the notification to update and open its notification content in the Contents related list.
  3. For messaging content, select New in the Delivery Channels related list.
  4. For chat content, select Add/Remove multiple in Delivery Channels, move the intended channels into Selected Delivery Channels, and select Save.

The mweb channel serves standard chat in the web client; NASS serves enhanced chat. If no specific chat channel is defined, notifications are triggered to all available chat channels by default. During review, compare the selected destinations with your written scope instead of treating an empty selection as a deliberate restriction.

For a messaging delivery-channel record, review Notification Content, Active, Connection, Send From, and Send To (Table). Notification Content is pre-populated; Connection identifies the configured messaging connection, and Send From identifies its provider application. Send To (Field) is optional. Finish with Submit for a new record or Update for an existing record.

For help planning this work, see ServiceNow implementation.

Test enhanced-chat actions through completion

Use a portal page with the chat button. Proactive triggers and simple, nonactionable Virtual Agent notifications display there as pop-up rectangles, and the full-page experience view does not show them. Selecting a proactive trigger opens a new chat. A notification appears as an unread message, and selecting it displays it in the chat conversation.

Check the destination within Chats as well as the pop-up. Simple, nonactionable notifications appear in Chats > Updates. Actionable notifications appear in Chats > Active, creating a chat whose title matches the notification title. Opening one loads its notification and associated actions. After the user works with it, the notification moves to Chats > Closed.

The unread badge count on the chats icon decreases when a notification is selected; that observation alone does not show that its action was completed. Build these checks into your Virtual Agent acceptance checklist, alongside the separate mobile return-to-conversation test.

Questions about notification content and conversation recovery

Why does a mobile push say New Message?

Mobile push content reflects text from the live or virtual agent. If a text representation cannot be generated, such as for a rich control, the push displays New Message. Include a rich-control example in acceptance testing so the support team recognizes this fallback without treating it as missing conversation content.

Do system action messages count as unread mobile messages?

System action messages are excluded from mobile push notifications and the unread-message count, with an exception for the live-agent timeout warning. That warning is sent as a push because the conversation may close without a response. Test that warning separately from an ordinary agent reply.

How can a user return after searching within a notification chat?

After viewing search results, entering Show notifications returns the user to the actionable notification that started the conversation. In a conversation that did not start from a notification, that command produces a message indicating there are no actionable notifications to view. Selecting the chats icon is the better route for viewing actionable notifications.

What happens to an active chat when a proactive trigger opens another?

When the user switches to a new chat while another active chat is ongoing, a pop-up on the chats icon explains that the previous chat was saved and that past chats can be revisited, including active ones that can continue. Include this navigation change in user training so opening a proactive trigger does not leave the employee unsure where their earlier work went.