An assignment rule routes legal requests and matters that match its conditions to a chosen user or group, so routine items need no manual triage. You build the rule on the intake form for a practice area, enter the conditions, choose the assignee, and switch the rule on.
Before you create an assignment rule
Assignment rules are attached to intake forms, so the work starts in the practice area setup rather than on an individual request. Your user needs the sn_lg_ops.legal_config role or the sn_lg_matter.matter_config role to create a rule. Intake forms and the work that follows them are covered in legal request intake and work closure.
The steps in this guide follow the Yokohama release. Menu paths, related list names and field labels can differ on another release or on an instance with a customized layout, so check each one before you build the rule.
Creating the assignment rule in five steps
Each rule is created from the intake form it will serve. Work through these steps in order.
- Navigate to All > Legal Administration > Practice Areas.
- Open the intake form from the Intake Form related list.
- In the Assignment Rules related list, click New.
- On the form, fill in the fields described in the next section.
- Click Submit.
When the form is submitted, the rule exists with the conditions you entered. Any legal request or matter that meets those conditions is assigned to the group or user the rule names, provided the rule is active. If you are routing a specific type of intake, such as contract review, the same steps apply, and the contract review intake page is the place to check the intake side before you write the rule.
Filling in the Assignment Rule form
Name, Active and Table
The Name field holds a unique name for the rule, so choose one that tells a reviewer what the rule routes. The Active option marks the rule as active. A legal request is assigned to a group or user based on active assignment rules only, which means a rule left inactive routes nothing, even when its conditions match.
Under the Applies To tab, the Table field names the table the rule applies to. Confirm that table before you enter conditions, because the rule applies to records in that table. The rule’s outcome applies to legal requests or matters that meet its conditions, so check the table against the records you intend the rule to catch.
Conditions
The Conditions field sets which items the rule catches. A typical example is a rule that should apply when a legal request is submitted in a Privacy category. For that case the condition is [Category][is][Privacy]. The pattern is a field, an operator and a value, and you can build other conditions the same way.
Keep conditions narrow enough that the rule catches only the items it is meant for. A broad condition on a category that many teams use will send unrelated work to the same assignee, and the rule will look wrong even though it is working as built.
Assign To tab
The Assign To tab decides where a matching item goes. Fill in the User field to assign matching items to one named person, or the Group field to assign them to a user group. A group suits work that a team should share, and a single user suits work that one person should own.
Assigning a legal matter manually
A matter is given an assignment group when it is created, whether it is created directly or by promoting a request. The practice area lead or the group manager can then assign the matter to themselves or to another member of that group. Role required for the steps below: sn_lg_matter.matter_manager.
- Navigate to All > Legal Request > Legal Counsel Center.
- In the Legal Counsel Center tab, select the list icon.
- In the Lists tab, under Legal Matters, click Unassigned.
- In the list of unassigned matters, click a matter number to open it.
- In the Details tab, select your name, or the name of another user, in the Matter owner field.
- Optional: update the Assignment Group Permission field.
- Click Save.
The Assignment Group Permission field sets what the rest of the assignment group can do with the matter. No Access limits access to the practice area lead, the group manager and the matter owner. Read lets all members of the assignment group view the matter. Edit lets all members view and edit it. The matter owner, the practice area lead or the group manager can set this field.
After you save, the state of the matter changes to Assigned. The assigned member can then open the matter from the Assigned to Me option in the Lists tab and select Start. The state changes to Work in Progress at that point.
Choosing between a rule and manual assignment
Typically, a rule suits items that fall into a clear, repeatable category, such as a privacy request that usually goes to the same group. Manual assignment suits matters that need someone to weigh the facts before deciding who should own them. A workable split is to let rules handle routine intake and leave judgment calls in the Unassigned list, where a practice area lead or group manager can review them.
Linking requests and matters
A request can be promoted into a matter, and existing requests and matters can be attached to one another. Each action has its own role, so check the role line before you start.
Promoting a request to a matter
Promote a request when it needs additional investigation and cross-departmental collaboration that might take more time to resolve. Role required: sn_lg_ops.legal_fulfiller.
- Navigate to All > Legal Request > Legal Counsel Center.
- Click the list icon, then in the Lists tab open a legal request under Legal Requests.
- Select the Assigned to Me option if the request is assigned to you, or the Collaborations option if you are a collaborator, and then select the request.
- If the request is newly assigned to you, select Start Work. The state of the request changes to Work in progress and the document changes to Legal review.
- Click Create Matter.
- In the Create Matter dialog, leave the Matter template field empty to create a matter without predefined data, or select a template name from the Matter template list. Then click OK.
The new matter copies its details from the request. You, as a legal fulfiller or a collaborator, are added to the matter’s Watch list so you can access it. If you selected a template, the matter starts with that template’s phases, tasks and attributes. For more on how templates are set up and used, see matter templates and phases.
Associating requests with a matter
Role required: sn_lg_matter.matter_fulfiller. Open the matter from the Lists tab, under Matters, using the Assigned to Me or Collaborations option. Then, in the Related Requests tab, click Add. In the Add Legal Request dialog box, select the requests you want to add to the matter and click Add.
The selected requests are listed in the Related Requests tab of the matter once the association is complete.
Associating a matter with a request
Role required: sn_lg_ops.legal_fulfiller. Open the item from the Lists tab, using the Assigned to Me or Collaborations option. Then, in the Legal Matters tab, click Add. In the Add Legal Matter dialog box, select the legal matter you want to add to the request and click Add. The matter then shows up in the Legal Matters tab of the request.
Checking a new rule
Test a rule with one item before you rely on it for routine work. The checks below cover the settings that usually explain a rule that does not assign.
- Confirm that the Active option is selected on the rule.
- Create or pick a legal request that meets the rule’s conditions, and check the assignee on its record.
- Check that the assigned user or group appears on the matter, and that a matter assigned by hand changes to the Assigned state.
- If your instance has a non-production copy, run the test there before you change anything on the live instance.
For help planning this work, see ServiceNow implementation.
Questions about linking, promotion and collaborator access
Can a closed or cancelled request be linked to a matter?
Yes. Any legal request can be associated with a matter, including closed or cancelled requests. This suits a case where a closed request holds background that the current matter needs.
Can a collaborator change the matter owner or assignment group?
No. Collaborators can work on a matter with the same access its owners have, but the Matter owner, Assignment group and Assignment group permission fields stay out of their reach. On a request, a collaborator is similarly limited for the Assigned to and Assignment group fields.
What must be in place before a request can be promoted?
The Legal Matter Management app must be installed. The record producer type in the intake form associated with the request must also be set to Request and Matter. Check both before you plan a promotion.
What happens to attachments when a request is promoted?
If the external storage option is enabled, documents attached to the request that sit in the configured external storage appear under the Documents tab of the matter’s Artifact record. Because that artifact is one shared record, a document added or removed there shows on both the request and the matter. Permissions for those documents are set on the request, not on the matter.