OBLYTECH Logo
OBLYTECH Logo

Automate Map Updates With an Agentic Workflow

The Automate map updates agentic workflow helps Indoor Mapping administrators handle CAD source configuration during bulk map updates. The agent retrieves sources for an uploaded CAD file, sets the CAD source on the Import Task, and resumes that task. When it cannot find the source, it moves the task to Waiting user input.

Where automated source handling fits into map updates

A bulk map update can involve more than uploading a drawing. The import task needs the source associated with the CAD file so that processing can continue. This workflow addresses that handoff: locating sources, setting the CAD source on the task, and resuming the task when the source is available.

Treat source handling as a specific part of your map update process. Before a trial, identify the uploaded drawing and the import task you expect the agent to handle. That gives the map administrator a concrete pair of records to inspect, instead of judging the result from a general notification about activity.

The Map Admin Agent is the agent connected to this workflow. Its remit covers Indoor Mapping configuration. For a rollout, keep the acceptance criteria focused on the actions this workflow performs. A resumed import task is evidence that the source handoff progressed; your team should separately assess whether the resulting map represents the intended building changes.

Record who owns the drawing, who reviews the import, and who resolves missing information. These are recommended operating responsibilities, rather than additional product roles. They make the exception path manageable when a bulk update spans several drawings and more than one person supplies the underlying material.

Review the Automate map updates agentic workflow

  1. Navigate to All > AI Agent Studio > Create and manage.
  2. Select Automate map updates.
  3. Select Define trigger to inspect the workflow’s trigger factors.
  4. Review the Connect AI agents section in Describe and Connect and locate Map Admin Agent.
  5. Review Select a UI display if your map administrators need output notifications in the panel.

Use the trigger review to connect the intended bulk update with the workflow that will handle it. Write down what you see on your instance before changing configuration. Avoid assuming that opening the workflow, selecting an agent, or enabling its display establishes the trigger conditions you need.

Check the labels and behavior on your instance and release. Panel terminology differs: Yokohama uses Now Assist panel, while the later topics use ServiceNow Otto panel. The workflow instructions also refer to Now Assist when describing Display. Use the displayed controls on your instance when carrying out the review.

Keep configuration changes reviewable alongside other platform work. If your team needs a common approach for moving configuration between environments, use the guide to update sets and release management to plan that separate process. Do not assume the uploaded CAD file and the workflow configuration share the same deployment route.

Validate the path when a CAD source is available

Start with a drawing whose intended source your map administrator can identify. The point of this trial is to make the expected association clear before automation runs. Keep a note of the import task and what source you expect it to receive, so the review does not depend on memory.

The agent retrieves sources for the uploaded CAD, sets the CAD source on the Import Task, and resumes the task. Inspect that sequence through the task information available to your administrators. Your acceptance record should distinguish the source association from the subsequent processing outcome.

  • Check that the task being reviewed belongs to the drawing in the trial.
  • Compare the assigned CAD source with the source expected by the map administrator.
  • Check that the task resumes after the source is set.
  • Review the map output against the changes requested for that drawing.

These checks are a suggested validation method. They are especially helpful when several drawings look similar or when the same building has multiple versions in circulation. A technically populated source field does not replace the administrator’s judgment about which drawing belongs to the planned update.

Keep record import concerns distinct from drawing source configuration. If the broader project also loads structured records, transform maps without duplicate records addresses that neighboring concern. The map workflow here centers on Indoor Mapping and its CAD import task.

Build the review around an observable change in the building, such as a revised room arrangement in the supplied drawing. Ask the reviewer to identify that change before inspecting the result. This gives the team a concrete acceptance question and helps separate a source association problem from a disagreement about the drawing itself.

Plan the Waiting user input handoff

If the source cannot be found, the agent moves the task to Waiting user input. Treat that state as a request for human attention. It identifies a different outcome from a task whose source was set and whose processing resumed.

Before expanding the workflow to a larger batch, decide how your team will notice waiting tasks and who will investigate them. The person responding should be able to relate the task to the uploaded drawing and determine what source information is missing. Assigning responsibility in advance reduces uncertainty during a busy update window.

For a missing-source trial, record the task identity, the observed state, and the question that needs resolution. Avoid repeating the same upload as a substitute for investigating the missing association. First determine whether the team has the right drawing and enough information to establish its intended source.

After the missing information is addressed, inspect the task again through your normal import procedure. Do not infer that a conversation about the problem has changed the task. Keep the evidence of the task’s next state with the review record so another administrator can understand what happened.

Separate exception ownership from configuration approval. The person who can supply a drawing may differ from the person who approves a workflow change. For broader release coordination, enterprise release management use cases can help frame those responsibilities.

Agree on a handoff at the end of the update window. If a task still needs information, leave a clear record of the outstanding question and the person expected to answer it. This prevents a later reviewer from interpreting an unfinished investigation as a completed map update.

Enable notifications and review the right evidence

In Select a UI display, select Display to show the panel. Workplace users need now_assist_panel_role to view output from a triggered use case. The panel provides AI agent output or notifications, including updates to import tasks sent to map administrators.

Apply that role requirement specifically to viewing the triggered output. It does not establish which permissions a person needs to edit the workflow or administer Indoor Mapping. Check those actions through your organization’s access process rather than extending the notification role into a general administration entitlement.

For the trial, have the intended reviewer check both the notification and the related task. The panel helps the reviewer notice activity; the task provides the context needed to assess the source handoff. If the reviewer sees no output, inspect the display selection and their output-viewing role before drawing conclusions about the import.

Make the review record understandable to someone who did not watch the trial. Capture the expected result, observed result, and remaining decision in plain language. This creates a basis for approving a larger batch without requiring the original tester to explain each task verbally.

For help planning this work, see ServiceNow implementation.

Questions to settle before scaling map updates

How should we choose the first trial batch?

Choose drawings that a map administrator can inspect confidently. Include enough variety to test your team’s review method, while keeping the batch small enough to trace each task back to its drawing. This is a rollout recommendation, not a product batch limit.

What should a handover record contain?

Keep the drawing identity, import task reference, expected source, reviewer, and unresolved question together. A concise handover lets the next administrator continue the investigation without reconstructing the update from scattered messages.

Should drawing owners approve the operating procedure?

Ask them to review the parts that depend on their input: how drawings are identified, how expected sources are recorded, and how missing information reaches them. Their involvement helps make the exception procedure workable before the update window begins.

How can we judge readiness for a larger update?

Review whether administrators can trace outcomes, resolve exceptions, and explain the result without guesswork. Use those observations to decide the next batch size. An enabled workflow alone is a weak basis for deciding that the team is ready to scale.