OBLYTECH Logo
OBLYTECH Logo

Triage Cases With an Agentic Workflow in CSM

The Triage cases agentic workflow in Customer Service Management processes routine requests arriving through email and other offline channels. It validates context, identifies intent, checks information and documents, and supports responses or case creation. Configure its triggers, execution identity, and human review points before enabling it for a defined intake queue.

Define what triage should accomplish before creating a case

An incoming message can contain a question, a request requiring a case, or several intents mixed together. Treating each message as a ready-made case pushes interpretation downstream. This workflow uses the source case or interaction to gather context and determine what should happen next, including answering informational questions without unnecessary case creation.

Start your design with the intake queue. Choose a routine request category whose required information, supporting documents, and escalation ownership are clear. Write down what a satisfactory outcome looks like: an answer to an informational request, a linked case of the correct type, or a handoff that explains the unresolved issue.

As a planning exercise, assemble examples with incomplete messages, multiple questions, and attachments unrelated to the request. Decide which outcomes a human should review before proceeding. This gives testing a business purpose beyond showing that the workflow runs. Broader process boundaries belong in your ServiceNow workflow automation design.

Open and adapt the Triage cases agentic workflow

Navigate to All > AI Agent Studio > Create and manage and select Triage cases. Duplicate the workflow when modifying it. Update the instructions when changing the workflow, an AI agent, or a tool so the instructions continue to describe the actual execution path.

In Define key requirements, describe the purpose and the actions and criteria for each step. Make distinctions explicit: which information supports an answer, which fields are necessary for a case, and what should be included in a handoff. Avoid instructions that tell one agent to proceed while a later tool expects information it has not collected.

The setup labels below follow the Brazil workflow. Earlier releases include different agent arrangements and panel labels, including Now Assist rather than ServiceNow Otto. Check the installed release and instance before applying these settings, and include this workflow in upgrade and release readiness planning.

Configure record conditions for offline intake

In Define trigger, the case trigger uses Target table set to sn_customerservice_case and Run as set to Assigned to. Its conditions require State to change to Open, a nonempty Assigned to, and Priority in 3-Moderate, 4 Low.

For the interaction trigger, set Target table to Interaction and Run as to Assigned to. The contact conditions require State to change to Work in Progress, with Assigned to, Account, and Contact populated. The consumer conditions require the same state change, a populated assignee and Consumer, and Type set to Email.

Keep the contact and consumer paths distinct when reviewing the condition logic. Test representative records for each path instead of assuming that one successful interaction proves both. A record that lacks an assignee is also a valuable negative test because the execution identity depends on that assignment.

Turn on Active in Edit trigger for autonomous triggering. For each participating AI agent, enable Status in Define availability. During troubleshooting, check the record transition, required fields, trigger activation, and agent availability separately; a current state value alone does not prove that the required state change occurred.

Set access for users and the data they can retrieve

In Define security controls, configure Define user access and Define data access separately. User access determines who can interact with the workflow; saving that selection generates an access control list. Data access selects the execution identity and the roles governing the records it can reach.

Role masking identifies B2B agents with sn_customerservice_agent and B2C agents with sn_customerservice.consumer_agent. For workflow data access, the admin role must include the specified roles under Contains roles. Add the necessary case-access roles to the workflow’s approved roles rather than assuming that permission to open the workflow grants permission to read its cases.

The preconfigured triage ACLs use sn_esm_agent. When adopting custom agent roles, review the associated ACLs in sys_security_acl, locate the records for the use case, agents, and internal flows or actions, and add the custom role to the relevant records.

Test with the intended user identity. Include a case that the user should access and one outside that user’s permitted scope. Retrieved information can be shared with the human interacting with the workflow, so examine the output as well as whether execution succeeds.

Review the agents, documents, and human checkpoints

The Context validator analyzes sentiment and identifies intents. Informational queries processes informational intents and consolidates answers. Entity extraction matches extracted information against an allowed field list. Case creation handles creation, Document verification checks required documents, and Email response supports drafting and sending replies. Triage cases WrapUp records an execution summary in the source record’s work notes.

Review tool execution modes before deciding how much oversight the queue needs. Create Case or Case Type from Source Record is supervised, while tools such as Determine Case Type and Update Work Notes are autonomous. The Email Response AI skill is supervised; separate autonomous tools create a draft and send email. Do not infer a shared review mode from the workflow’s overall purpose.

For document-dependent cases, compare the case type’s required list with the supplied attachments. The document tools include Documents Checklist, Initiate Document Verification, and Verify the documents. Test missing files and failed verification as separate situations. A supplied attachment does not by itself establish that the required evidence is present.

During acceptance testing, inspect the extracted fields, verification result, resulting case or interaction link, email content, and wrap-up notes together. A fluent answer can still be the wrong outcome if it omits a second request or relies on information that failed verification. For help planning this work, see ServiceNow implementation.

Test the panel experience and release the queue deliberately

In Select channels and status, choose the workflow’s availability and enable Engage via the ServiceNow Otto panel for panel access. Select Save and test to test in AI Agent Studio. Include a human agent in the review so the visible instructions and next action are understandable in the workspace.

Use a small acceptance set covering an informational request, a request needing case creation, incomplete customer information, missing documents, and an escalation. For each example, record the expected outcome before running the test. Compare actual records and work notes with that expectation, including whether the source interaction remains traceable.

Keep changes to instructions, triggers, access rules, and tool behavior in the same release review. Use your update sets and release management process to track the change and its validation evidence. After rollout, review unresolved outcomes as well as successful executions; those exceptions show where intake rules or instructions need attention.

For the first queue review, separate failures by the step where evidence becomes incomplete. If intent recognition succeeds but a case lacks necessary values, inspect extraction and missing-field handling. If the case is correct but the reply is misleading, review the response inputs and the consolidated context. If the outcome is correct but hard to follow, inspect the source work notes and the human instructions. This review sequence is a recommended operating practice: it keeps the team focused on the failed decision rather than rewriting the entire workflow after a single exception. Retain the original test input so a corrected configuration can be evaluated against the same situation.

Questions about operating offline case triage

How should a team handle a message containing conflicting customer details?

Define a review outcome for contradictory identifiers before testing. Ask the reviewer to resolve the mismatch against permitted customer records, and avoid treating a confidently extracted value as proof that the message belongs to that customer.

What belongs in an acceptance test record?

Record the initial source values, intended user, expected decision, actual result, and reason for acceptance or rejection. This makes failures reproducible and helps distinguish an instruction problem from a permission or intake-data problem.

Should teams measure success by the number of cases created?

Use outcomes that reflect the request. Case counts alone can reward unnecessary creation. Consider answer correctness, completeness of handoffs, appropriate case typing, and the review effort needed to repair the result.

Who should review an ambiguous escalation?

Choose an operational owner during queue design and agree what information that person needs. A handoff should make the unresolved decision clear enough that the next person can act without reconstructing the entire intake conversation.