OBLYTECH Logo
OBLYTECH Logo

Conversational Subflow Actions in Flow Designer

To reorder a promoted conversational subflow, conversational action, or Virtual Agent topic in ServiceNow, change its Order value in Promoted Skills. Promote the asset first, use virtual_agent_admin or admin for reordering, and check its conditions: a promoted asset whose condition matches appears ahead of other assets regardless of the order you assigned.

Prepare the promoted asset ordering change

Start with the recommendation that the user should see. Write down the conversational subflow, conversational action, or Virtual Agent topic you intend to move, its current position, and the intended position. Promoted assets appear alphabetically by default. A deliberate order is appropriate when alphabetical presentation does not match the sequence you want readers to follow.

In Brazil, promote the assets you want to reorder in Assistant Designer before working on their order. This procedure operates on promoted assets. Log the promotion decision and the ordering decision as two entries in your change notes so the reviewer can tell which task has been completed.

The steps below use the Brazil navigation. The ordering procedure calls these AI assets, while the promotion screen also uses LLM assistant labels. Identify the assistant and asset before editing the promoted record.

To check promotion, open All > Conversational Interfaces > Assistant Designer and choose the Asset library tab. Select the intended assistant from Select assistant; the displayed assets are filtered to those associated with it. Find the asset and open Show actions for this row. A check mark beside Promoted indicates that it is already promoted. The Promote control toggles that status, so inspect the check mark before using it. Demoting an asset removes it from the assistant’s suggested assets rather than changing its position.

Association with an assistant comes before promotion. System topics, setup topics, topic blocks, custom controls, and small talk topics are excluded from promotion. If the requested item belongs to one of those categories, the promoted ordering procedure does not provide a way to place it in the recommendation list. Confirm that eligibility before preparing an Order change.

For the broader preparation work, use the guide to Flow Designer conversational subflows. For this ordering change, prepare a short inventory containing the asset name, current Order value, intended value, existing condition, and person responsible for validating the recommendation.

Assign permissions for the specific task

Reordering promoted conversational subflows, actions, and topics requires virtual_agent_admin or admin. Do not infer authorization to perform this procedure from a designer role that covers another part of the workflow. Confirm the account used for the ordering work before making changes.

For conversational experience settings, sn_conv_fa.conv_fa_designer provides read and write access. The sn_conv_fa.conv_fa_admin role provides read access to flows, subflows, and actions, together with read and write access to conversational experience settings.

The action_designer role provides read and write access to Workflow Studio actions. The flow_designer role provides read and write access to Workflow Studio flows and subflows. Both contain sn_conv_fa.conv_fa_designer. Assign access according to the work a person needs to perform, rather than using a broad administrator role as the starting point.

For example, a proposed working arrangement could give an action author responsibility for the action definition and a Virtual Agent administrator responsibility for promoted ordering. Record the handoff between those tasks. If the ordering review reveals a problem in the automation, route that issue to the appropriate author instead of assuming that a position change will resolve it.

Change the Order value in Promoted Skills

  1. Navigate to All. Enter sys_cs_context_profile_promoted_skill.list in the filter to open Promoted Skills.
  2. Find the promoted Virtual Agent topic, conversational subflow, or conversational action that you intend to reorder.
  3. Select its Order value. Enter the intended value in the Order field, then select Update.
  4. Review the promoted skills in the assistant to verify their presentation against your intended sequence.
  5. Repeat the procedure for other promoted assets that need adjustment.

Before selecting Update, compare the record with your inventory. Similar business names can make a review harder, so have the reviewer identify the actual asset being moved. Record the previous value as well as the new value; this provides a concrete basis for reversing your own change if the agreed sequence needs revision.

Work through the intended list as a whole. Moving one entry is easy to describe, but the acceptance decision concerns the resulting recommendation sequence. Compare the assets surrounding the changed entry, and note whether a condition explains a position that differs from the planned order.

If the review identifies changes to the underlying subflow, record the required definition changes. If that work is needed, continue with creating, publishing, and testing subflows. Finish the definition review before using recommendation position as the final acceptance check.

Use conditions when a recommendation should come first

A promoted asset that meets its condition is displayed before other assets, irrespective of its configured order. This is the first behavior to check when a lower-positioned entry appears at the front. Compare the condition with the context of the conversation before changing more Order values.

To add a condition, enter the required parameters in the Condition builder and select Update. The assistant then presents the conditionally promoted skill before the other assets when that condition is met. Choose the parameters to reflect the business situation you intend to prioritize.

Consider a proposed support menu containing a routine information action and a subflow intended for a particular support situation. Agree which recommendation should lead under ordinary circumstances, then describe the situation in which the conditional recommendation should lead. Those are two acceptance cases, with different expected results.

When several teams disagree about the intended sequence, settle the recommendation policy before editing records. List the business context, preferred asset, responsible owner, and acceptance example. For help planning this work, see ServiceNow implementation.

Check supported inputs before investigating the action itself

Conversational subflows and actions must use supported input data types to be compatible with conversational interfaces. Review the complete input set, rather than checking a single field that looks familiar. An ordering review concerns recommendation position; an input compatibility review concerns whether the asset can work with conversational interfaces.

Supported Workflow Studio labels include String, String (Full UTF-8), Array of Strings, True/False, Choice, Integer, Long, and Long Integer String. Reference, Document ID, Sys ID (GUID), and Table Name are also supported. Check the actual type label rather than classifying a field by the kind of information its name suggests.

Date-related labels include Calendar Date/Time, Date, Date/Time, Due Date, Time, and Schedule Date/Time. Email and HTML are supported input labels as well. Preserve these distinctions in the input inventory so a reviewer can compare the definition without guessing what a shorthand description means.

For each input, record its name, type label, and the example value you plan to use in acceptance testing. This is a proposed review method, not an additional product prerequisite. The guide to action inputs, outputs, and data gathering can support a wider definition review.

Validate the assistant sequence and record the result

Prepare acceptance cases before making the ordering change. Include an ordinary conversation context, a context that meets the promoted condition, and one that does not. For each case, write the expected leading recommendation and the relative position of the asset you changed.

  • Compare the saved Order values with the planned values.
  • Inspect the conditions attached to the promoted assets under review.
  • Check the recommendation sequence in the assistant for the agreed contexts.
  • Record the observed sequence and whether it meets the acceptance case.

A concise handover should identify the changed assets, previous and current values, condition parameters, test contexts, and observed results. Avoid a completion note that merely says the action was moved. The reviewer needs enough detail to distinguish a saved configuration from a verified recommendation experience.

If the recommendation appears where expected but the underlying work still needs investigation, continue through the guide to custom action error handling and logs.

Questions about access and input interpretation

Does conversational settings access also grant action editing access?

The sn_conv_fa.conv_fa_designer role grants read and write access to conversational experience settings. Its role description does not grant action editing access. The action_designer role supplies read and write access to Workflow Studio actions, so check which responsibility the account needs.

Which role provides email table write access for conversational work?

The sn_conv_fa.csa_email_write role provides conversational subflows and actions with write access to the sys_email table. Treat this as a specific access requirement when reviewing email-related work, rather than inferring it from a supported Email input.

Are long and longint the same input type name?

They are distinct platform type names in the supported input list. The long type maps to Long in Workflow Studio, while longint maps to Long Integer String. Preserve the exact mapping when documenting an existing input.

Can different platform date types share a Workflow Studio label?

Yes. The datetime, date_time, and glide_date_time platform types map to Date/Time. The date and glide_date types map to Date. Record the platform type when a label alone would leave the underlying definition ambiguous.