To let non-admins edit choice list options, grant the personalize_choices role when they need access across all tables. For a narrower responsibility, use a custom ACL for the personalize_choices operation on the intended table and field. Test existing-option changes and new-choice creation separately, because access to a field does not by itself establish both capabilities.
Choose the scope before assigning personalize_choices
Start with the field the person owns, rather than a request for general configuration access. Record the table, field, intended changes, and who approves new values. A team maintaining one category list has a different access requirement from someone responsible for choice options throughout the instance.
The personalize_choices security role enables non-administrators to modify Choice elements options across all tables. Predefined ACLs give that role broad choice-personalization access. The role also carries read, write, and delete access to the sys_choices table. That additional table access is not required simply to expose Personalize Choices for a limited field.
A custom ACL can govern the personalize_choices operation for a specific field or for all fields, using .* on a particular table. Select the field scope when the responsibility stops at one list. Treat a table-wide rule as a separate decision: it authorizes a larger area than the original field request.
For the wider permission model, see security and access design. Define the intended boundary there before translating it into permissions. Check the behavior on your instance and release before making the access available to business users.
Design a field-level ACL and test both capabilities
For narrower delegation, identify a role associated with the responsible group and an ACL granting the personalize_choices operation for its intended field. For example, a role named hris_admin can be given access to the Category field on Knowledge, whose table name is kb_knowledge. The decision concerns that field, rather than permission to maintain choices throughout the platform.
Do not interpret access to the operation as proof that a user can create new choices. New-choice creation requires an ACL granting personalize_choices access for that field. Include both changing existing options and creating an option in the acceptance criteria. A successful reorder alone is an incomplete permission test.
- Write down the exact table and field that the delegated user should maintain.
- Choose a field-specific rule or a table-wide .* rule according to the approved responsibility.
- Have the security administrator configure the custom ACL for the personalize_choices operation.
- Test changing the available options and creating a new option as separate actions with the intended user.
- Test an unrelated field and table to check whether the resulting access exceeds the approved scope.
Use a test identity whose permissions resemble the intended recipient. Testing through an administrator account does not demonstrate the delegated experience. Record the permissions present during the test so that a later reviewer can distinguish the new rule from other access the account already held.
For help planning this work, see ServiceNow implementation.
Edit options through Configure Choices
The choice-option maintenance procedure requires personalize_choices. Open a form containing the field, right-click its label, and select Configure Choices. Use the slushbucket to change order, add or remove items, or create items, then select Save. With field-level ACL delegation, test this same route using the intended account.
Dependent choices need an additional setup step. Set the controlling field before opening the dependent field’s configuration. For Incident Subcategory values associated with Hardware, select Hardware in Category first. Otherwise, the maintainer may review the wrong set of options and mistake a dependency issue for missing access.
When a second field should offer the same options, link it to the source field rather than retyping the values. Right-click the second field’s label, choose Configure Dictionary, enter the source field’s table in the Choice table field and the source field’s name in the Choice field field, then select Update. The second field then displays the source field’s options. Once the link is set, the second field stops using its own list, so confirm that its current options are not needed before saving.
Separate the decision to remove an option from the decision to stop offering it. For a list already in use, consider deactivating an obsolete option to avoid conflicts with existing data or scripts that rely on it. Choice changes can affect business rules, including rules involving default Incident states. Review those dependencies before approving a change.
Use a small change record for the maintenance work: the field, controlling value if applicable, requested options, approval, and test result. This makes the change reviewable without handing the operator wider privileges. The access governance model can help place that approval within a consistent ownership process.
Understand why Show Choice List may be missing
Show Choice List requires personalize_choices to be explicitly granted to the user. An ACL granting the operation on a field does not make that command available. Configure Choices continues to appear with either ACL-based access or an explicitly granted role. These commands therefore provide different evidence when investigating a permissions report.
A user who can maintain an approved field through Configure Choices but cannot see Show Choice List may be experiencing the intended restricted arrangement. Avoid adding the broad role merely to make both menus look alike. First establish which action the user actually needs and whether the configured route meets it.
For a user with the explicitly granted role, right-click the choice field label and select Show Choice List to inspect definitions. The filter at the top can be changed to inspect other choice values. Use Configure Choices to add normal options rather than adding them directly through this list.
The Choice Set table, sys_choice_set, holds a record for each field using a choice list. Its association with an application file lets update sets and team development track and transfer a field’s choices together. Include the field’s choice set in the change review so that maintenance and transfer are considered together.
Keep dictionary and dashboard work separately authorized
A request to change a dropdown can refer to different work. Maintaining options is distinct from changing a field’s dictionary configuration or creating a dashboard filter. Establish which object the request concerns before choosing a role. Giving choice maintenance access does not replace the role requirements of those other procedures.
Displaying a reference field as a choice list requires personalize_dictionary. The configuration starts from Configure Dictionary, uses the Choice List Specification section, and adds ref_auto_completer=AJAXReferenceChoice in Attributes through Advanced view. A choice reference field with a defined reference key will not function. Keep that conversion outside a routine delegated option change.
Reference dropdown size can also explain a user’s report. The glide.ui.max_ref_dropdown property controls whether the field appears as a dropdown or a reference icon; its default is 25. A field can override that behavior with max_ref_dropdown. Modifying dictionary attributes requires personalize_dictionary. Investigate this configuration when the concern is display behavior rather than permission to edit options.
Creating a Core UI choice list interactive filter requires hp_publisher_admin and report_admin. Its Exclusion list controls which choices appear in the filter; excluded-choice data is still included when All is selected. All presents an unfiltered report.
Core UI interactive filters cannot be created in net new instances from Yokohama forward. Where the procedure is available, distinguish filter setup from field maintenance in the work request. Use the access implementation roadmap to sequence separate permissions and validation tasks.
Questions about choice maintenance edge cases
What happens when another field reuses the same choices?
A field configured with a Choice table and Choice field uses the source field’s choice values rather than its own defined list. Adding or removing choices at the source is reflected in the consuming field. Include those consumers when deciding who should approve a source-list change.
Are there limits on stored choice values?
Choice list values have a maximum length of 40 characters, and allowable numerical values range from -999 to 999. Check proposed stored values before approving a new option. A readable label alone does not establish whether its underlying value fits those limits.
Does changing the None label follow the normal add-option route?
The None display-label procedure requires an explicitly granted personalize_choices role and uses Show Choice List. It creates an entry with the Value NULL_OVERRIDE. Without that value, the new label appears alongside the None option. Review this as a specific configuration request. Removing the None option altogether is a separate change. It requires personalize_dictionary, and you must first populate the Default field and change the Choice field value to a dropdown without — None –. On a dependent field, the None option remains available regardless.
Can a delegated maintainer delete an entire choice set?
The delete-all procedure on a Choice Set record requires personalize, which differs from personalize_choices. Treat bulk removal as a distinct request with its own role check and data review.
Why might an inactive option still appear on an existing record?
Inactive or invalid choice values appear in blue by default instead of black. That display can identify a historical value retained on a record. Inspect the record and option status before interpreting the color as evidence that the user’s choice-maintenance access failed.