Multi-factor authentication in ServiceNow is configured through factor options, user or role criteria, and adaptive authentication policies. To enforce it, check the enabling property, activate the relevant criteria, and test the resulting login challenge. Before removing email OTP, make sure affected users have another factor they can use.
Separate factor settings from enforcement decisions
A factor setting answers how someone can complete the second verification step. An enforcement setting answers which login needs that step. An available SMS provider does not establish which roles require MFA, and a role list does not establish whether users have enrolled a suitable factor.
Start with a short configuration record containing the intended population, accepted factors, criteria records, adaptive policies, and expected login result. Include a user who should receive a challenge and a comparison user outside the selected population. This gives the administrator a concrete way to check whether a change reaches the intended accounts.
These settings match the Brazil release of ServiceNow. Check their availability and current values on your instance before making changes. Defaults reported for one application context should not replace inspection of the property and records actually in use.
For the wider rollout sequence, use the MFA setup and enforcement guide. Keep this settings review focused on the values and criteria that determine the challenge.
Configure multi-factor authentication in ServiceNow by role
Role-based enforcement depends on two settings working together: glide.authenticate.multifactor must be true, and the relevant record in the Multi-factor Criteria [multi_factor_criteria] table must be active. A populated role list with an inactive record is an incomplete configuration.
The role required to configure role-based multi-factor criteria is adaptive_auth_admin. Use that permission for the criteria procedure below. Do not assume that the roles being protected also identify the permission required to edit the criteria.
- Navigate to All > Multi-factor Authentication > Multi-factor Criteria.
- Open the Role-based multi-factor authentication record.
- Review the Multi-factor Roles list against the population you intend to protect.
- To add a role, double-click Insert a new row…, enter or select the role name, and select the Save Icon.
- To remove a role, select its delete icon.
- Select Update and check that the record is active.
Inspect glide.authenticate.multifactor in the system properties list and verify that it is true. Then inspect the criteria record again. The dependency matters during troubleshooting: changing the property without checking the record can leave the intended role protection unenforced.
When admin, security_admin, or user_admin are included in the configured multi-factor roles list, users assigned those roles are subject to that enforcement. Check each intended role against the saved list. If a role is missing, this role criterion does not select its members for MFA. Those users may still be selected through user settings or adaptive policy; an omitted role is a gap in this criterion, not proof that every login bypasses verification.
Record the roles added and removed with the reason for each change. During testing, use an account whose assigned roles match the saved list. A test with an unrelated account cannot demonstrate that the role criterion works.
Select individual users without losing track of policy precedence
User-based criteria provide a separate way to enable MFA for selected people. The role required for this procedure is adaptive_auth_admin. Navigate to All > User Administration > Users, configure the list to display Enable Multi-factor Authentication, and change that column to true for the selected users.
When a selected user logs in with a user name and password, the user is prompted to set up MFA. Plan the enrollment experience as part of the configuration change. Selecting an account is an administrative action; completing enrollment is a separate checkpoint that the login test should cover.
For a limited rollout, maintain a named test group outside the configuration record itself. Capture which accounts were selected, which completed setup, and which could not proceed. This is an operational checklist, not an additional platform criterion.
If login results differ from the user or role settings, inspect adaptive authentication before changing those settings again. Policy-based MFA can take precedence over user-based or role-based configuration. Repeatedly toggling a user field will not explain a result controlled by a policy.
Check the adaptive MFA context before broad enforcement
The role required to configure adaptive authentication policy-based multi-factor criteria is adaptive_auth_admin. Navigate to All > Adaptive Authentication > Auth Policy Contexts > MFA Context. The Default Policy field determines how the selected policy conditions affect MFA.
- Step-Up MFA Policy requires MFA when its configured conditions evaluate to true.
- Step-Down MFA Policy bypasses MFA when its configured conditions evaluate to true.
Choose the default policy deliberately. For the step-up configuration, select the policy in the Step-Up MFA Policy field and select Update. After saving, inspect Policy Input and Policy Conditions to see the inputs and conditions associated with that selection.
Policy inputs can be added or edited through the Authentication Policy record referenced by the policy field. Keep the condition being tested alongside the expected result in your change record. A condition that evaluates successfully is not sufficient evidence unless its result matches the intended requirement or bypass.
MFA with SSO login requires glide.authenticate.mfa.with.multisso.enabled to be true. It also depends on the Adaptive Authentication plugin (com.snc.adaptive_authentication) and its Adaptive authentication property being enabled. The roles listed for SSO configuration are adaptive_auth_admin and sso_config_admin.
- Open All > Multi-factor Authentication > Properties.
- Select both checkboxes: Enable Multi-factor authentication and Enable Multi-factor Authentication with SSO.
- Select Save, then open Multi-factor Authentication > MFA Context to review the policy that will govern the SSO challenge.
Check these prerequisites together before testing the SSO route. A true SSO property value does not replace the plugin, Adaptive authentication setting, or saved MFA checkbox selections. The authentication methods guide helps frame which login route belongs in the test plan.
For assistance with MFA configuration, see ServiceNow implementation.
Choose factors before disabling email OTP
The property glide.authenticate.multifactor.email.otp.enabled controls whether an email token is available for the second factor. Setting it to false removes the email OTP option from the MFA validation screen. For an account relying on email, mailbox access puts the verification message within reach of whoever controls that mailbox. Review that dependency before choosing email as the account’s second step.
With the property set to true, use the following conditions to check whether the login screen should offer email. The property value alone does not settle the result.
| Email factor state | Result |
|---|---|
| Policy inactive; no other second factor registered | Email offered |
| Policy active; condition evaluates true | Email offered |
| Policy active; condition evaluates false | Email not offered |
Before disabling email OTP, check enrollment for every account using email alone. Arrange a replacement factor and verify that the user can complete a login with it before removing email. If an account is left with no usable second factor, administrator enrollment of a replacement may be needed to restore access.
Test removal with an affected account before expanding the change. Check that the alternative works and that email is absent from the validation screen. A property readback confirms the saved value; a login confirms whether the user can complete the intended journey.
MFA provider configurations include Email Provider Configuration, Twilio Provider Configuration, and Infobip Provider Configuration. Separate provider readiness from user enrollment when investigating delivery or setup failures. An entry in a provider list does not replace a test of the chosen factor.
If Twilio or Infobip entries are already present, check the installation choices before treating them as ready for use. Selecting Load Demo Data while installing Multi-factor authentication with SMS and Notify – Twilio Direct Driver supplies those provider configurations. The Infobip entry is demo data whose fields can be edited for the intended provider configuration. Review those fields and test delivery with an enrolled account.
Validate the saved settings and the login outcome
Build the verification record around distinct cases rather than one successful sign-in. Include a role-selected account, a user-selected account, and an account evaluated by the adaptive policy you changed. Where relevant, include an email-dependent account and the SSO route.
- Read back the property values and the saved criteria, including the active state and role list.
- Check the selected default policy and its displayed conditions.
- Test the intended accounts and record whether setup, challenge, or bypass occurs.
- Compare the observed result with the expected result before expanding the population.
Keep session behavior as a separate review item. A challenge decision and a session duration are different controls; use the session limits and hardening settings guide when the remaining concern is how long authenticated access continues.
Questions about initial MFA records, providers, and SSO conditions
Is the role criterion active on a newly initialized instance?
On a zbooted instance, the shipped role criterion starts inactive, and glide.authenticate.multifactor has a default value of false. The presence of the record therefore does not establish that role enforcement has been turned on. Include initial activation in the configuration review rather than treating a supplied record as an enabled control.
Can MFA use a provider configuration beyond the supplied entries?
Yes. You can create a provider configuration for SMS or email instead of relying on the supplied configurations. This gives the administrator a separate configuration choice from editing an existing Infobip demo entry. Decide which record will represent the intended provider before reviewing the provider fields.
How can an SSO condition distinguish the login route from the identity provider?
Authentication Scheme and Identity Provider represent different selections in a policy condition. Authentication Scheme can be Single Sign-On or Username and Password; Identity Provider identifies the IDP record to which MFA should apply. For SSO configuration with adaptive_auth_admin and sso_config_admin, check the scheme and provider together so a condition targets the intended authentication path.
What information belongs in a new MFA policy condition?
For SSO configuration with adaptive_auth_admin and sso_config_admin, open Policy Conditions, select New, and complete Label, Description, and Conditions before selecting Submit. Label identifies the condition by a unique name; Description explains its purpose. Conditions holds the filters and OR clauses used to select users. Give separate conditions distinguishable labels so the saved entries can be reviewed individually.