OBLYTECH Logo
OBLYTECH Logo

ServiceNow Workday HR Spoke: Setup, Versions and Actions

The Workday HR spoke is a ServiceNow Store app that adds Workday HR actions to Workflow Studio, covering worker, time off, payroll and staffing data through Workday’s SOAP services and report-based REST lookups. Setup needs an Integration Hub subscription, a Workday integration user with security policies, and a ServiceNow connection. REST actions also need an OAuth client.

What the spoke covers and which version to install

The spoke was built by Bristlecone, Inc. and is requested through the ServiceNow Store. It targets Workday’s SOAP API at version v33.2 and its REST API at version v1. The current release is 3.1.1, dated October 2026. If spoke version 1 is installed, uninstall it before you install version 1.1.

Recent releases:

  • Version 2.12.2 (June 2026) patched non-glide ACLs and fixed two actions for Workday v45.2 API compatibility.
  • Version 3.0.1 (July 2026) added SOAP actions that accept personal and service account authentication through OAuth. The original service account SOAP actions are deprecated but still usable in existing flows.
  • Version 3.1.1 (October 2026) added Look up Payslips Stream and Look up Authenticated User and Reportees Information.

Requirements before installation

You need an Integration Hub subscription, which the Integration Hub addendum governs, the admin role that the setup procedures name, a configured Workday tenant, and these seven plugins:

  • ServiceNow IntegrationHub Action Step – SOAP
  • ServiceNow IntegrationHub Action Step – REST
  • ServiceNow Flow Designer – Dynamic Inputs
  • ServiceNow Flow Designer – Dynamic Outputs
  • Complex Object
  • System Import Data Source
  • Integration Hub Action Template – Data Stream

Some of these are licensable features, so using one outside the spoke needs its own license. If installation fails, confirm that the plugins are present.

Preparing the Workday side

Integration user and domain permissions

Register an Integration System User in Workday and select the Do Not Allow UI Sessions check box. Create a security group, assign the user to it, and open Maintain Domain Permissions for Security Group. The table holds 46 entries, each pairing an operation level (Get Only, View Only, View and Modify, or Get and Put) with a domain security policy. Activate those policies for the group once the entries are in place.

Business process policies

Next, configure business process policies for the same group. The table covers 11 business process types, including Assign Roles, Termination, Request Time Off and Request Leave of Absence. Each needs an Initiate permission on its web service, and the policies must then be activated.

Connecting ServiceNow for SOAP actions

SOAP actions call Workday’s SOAP web services and need three admin-created records:

  1. Connection Details. In the Workday HR Spoke application, enter the base URL (the Workday host, the service path and your tenant name), version v33.2 and web service type SOAP.
  2. WS-Security Username Profile. Under IntegrationHub and SOAP Integrations, create a profile for the spoke with the username and password of a Workday user who holds integration rights.
  3. SOAP security policy. Open the WorkdayHR record, select that profile, and leave the X.509 profile empty. An action that should use a different policy record must select it individually.

Personal authentication grants access to individual users rather than a shared system account. It reuses the Connection Details record and registers the application under System OAuth with the client ID, client secret and endpoints from Workday. On the credential, choose the integration type Personal or System, then select Get OAuth Token to sign in to Workday.

Connecting ServiceNow for REST actions

REST actions and report-based lookups use OAuth 2.0. Register a client in Workday first, then register Workday as an OAuth provider in ServiceNow.

Register the client in Workday

In the Register API Client task, enter a client name, select Authorization Code Grant as the grant type and Bearer as the token type, and enter your ServiceNow OAuth redirect address as the redirection URI. Select the functional areas your actions need. Click OK, then copy the Token Endpoint and record the Client ID, Client Secret, REST API endpoint and Authorization Endpoint.

Register Workday as an OAuth provider

In System OAuth, open Application Registry, select New, and choose to connect to a third-party OAuth provider. Set the application to Workday HR Spoke, enter the Client ID, Client Secret, Authorization URL and Token URL, add the redirect URL, set the default grant type to Authorization Code and make the record active. Saving creates an OAuth entity profile.

Create the connection

The template route runs through Workflow Studio. Open Integrations, the Connections tab and the WorkdayHR alias, choose Configure, Edit or Add Connection, enter the tenant name, API version, credentials and URLs, then select Save and Get OAuth Token.

The manual route starts with an OAuth 2.0 Credentials record that uses the OAuth entity profile, then its Get OAuth Token link. Add a connection to the WorkdayHR alias, create it in the Workday HR Spoke application, and set Tenant Name and Version v1. The alias keeps connection details in one place for the actions to use.

SOAP-based actions

The SOAP listing contains 160 entries. Of these, 75 are deprecated WS-Security versions, which leaves 85 non-deprecated actions. Deprecated actions still work with Basic Authentication and System Authentication. Get Access Token retrieves OAuth 2.0 access tokens for SOAP-based actions. Examples by functional area:

Functional area Example actions
Absence Management Request Time Off, Look up Time Off Balance
Benefits Administration Add Dependent, Change Beneficiaries
Payroll Management Look up Payroll Results, Look up Direct Deposit Information Details
Resource Management Change Legal Name, Look up Workers, Update My Contact Info
Staffing Hire Employee, Offboard Employee, Change Job, Create Position

Change Job covers transfers, promotions, demotions and lateral moves. No Show rescinds a hire when a new employee does not arrive on the joining date.

REST-based actions and report dependencies

The REST listing has 32 entries, 31 of them non-deprecated, spanning absence, payroll, goals, performance, skills, resource management and metadata. Several read through a Workday report that must exist before the action runs:

  • Look up Worker Time Off and Leave Of Absence Request, through a report-as-a-service (RaaS) report
  • Look up Employee Latest Performance Review, Look up Employee Performance Review Historical Data, Look up Succession Planning and Look up Succession Pool
  • Look up Employee Skills and Look up Skills

Building the skills report

In the Create Custom Report task, choose the Advanced type, clear Optimized for performance, and select Maintained Skills and Skills Cloud Skills as the data source. Leave Temporary report empty and select Enable as webservice. The integration system user must own the report. Under Web Service > View URLs, follow the CSV link to the RaaS URL and record the base URL, tenant name, owner user name and report name.

Report access and custom objects

Create a RAAS Report Access Details record for each ServiceNow user entitled to a report. The three custom actions, Look up Object Custom Fields, Look up Custom Reports and Update Object Custom Fields, need a Workday Custom Objects record first, holding the object WS aliases, extension fields and field types.

AI agents and sample workflows

Install Now Assist for Integration Hub to use the AI agents. The spoke ships seven standalone agents: Feedback Management, Approval Management, Goals Management, Performance Management, Absence Management, Payroll Management and Resource Management.

The absence agent retrieves an employee’s time off balances by employee ID, presents them and reports any error. Third-party access and long-term memory are off by default. Two sample agentic workflows also ship with the spoke. Neither is on by default, so activate the workflow template before you run it.

Webhooks for events from Workday

Enable OAuth 2.0 Clients in Workday’s Edit Tenant Setup – Security task and register an API client with the Authorization Code Grant and Bearer tokens. In ServiceNow, add a Workday Webhook Registry record for each event, such as CreateUser or Offboarding, then generate and record a user name and password. The Create User webhook also needs a CLAR integration imported into Workday Studio and added to the Hire business process after completion. Four subflows depend on these webhooks: Create User, Leave of absence, Deactivate User and Update Job Requisition.

Sample flows, subflows and remote tables

The Verify User Sample Flow checks that the requester is a valid Workday user by calling the subflow of the same name. To customize any sample, copy it into a new application scope and edit the copy.

The spoke includes five sample remote tables. Get Payroll Results and View My Total Rewards store sensitive data, so decide who may view them before you grant access. Remote Table Configurations tells a remote table which table and field hold the logged-in user’s Workday employee ID.

Extending the Look up Workers action

Copy the action rather than changing the original. To add Position Reference ID, create a string input, pass it through the pre-processing script into a Position_Reference node with a Position_ID type, and test with a sample flow. If publishing fails, remove some output elements, since a data stream action has a maximum number of outputs.

Frequently asked questions

Does the spoke need its own subscription?

It needs an Integration Hub subscription, governed by the Integration Hub addendum. Some plugins it depends on are licensable features.

Which authentication should I use for SOAP actions?

Personal authentication grants access to individual users rather than a shared system account. Version 3.0.1 added SOAP actions that accept both personal and service account authentication through OAuth.

Why do some lookups need a Workday report first?

Those actions read through a Workday report, which must be built, owned by the integration system user and enabled as a web service before the action can return results.

Which version should I install?

Install version 3.1.1, the current release dated October 2026.

Do I need webhooks?

Needed when you want ServiceNow to receive Workday event notifications. The Create User, Leave of absence, Deactivate User and Update Job Requisition subflows depend on them.