OBLYTECH Logo
OBLYTECH Logo

List view in ServiceNow: columns, filters, sorting and views

A list view in ServiceNow is the set of columns, conditions, sort order and grouping a user sees when a table opens as a list. Users change their own columns and order through the personalize list icon, build filters with the condition builder, sort from column headings, and administrators define shared views through List Layout.

What a list view controls

A view defines which elements appear when a user opens a form or a list. The system usually displays only a subset of a table’s fields, and that subset is the view. The base system includes several views, among them the Default view and the Advanced view. The base system views should be left in place.

Configuration happens at two levels. Personal configuration covers columns and their order for one user on one list view. Shared configuration is the layout administrators set for a view. Filters and sorting sit on top of both, because they change which records appear and in what order without changing the columns.

Personalize columns and display options

Personal lists decide which columns appear in a list view and the order they appear in. They change one specific list view for the individual user, and the changes do not affect what other users see. The role needed is personalize_list or admin.

Open the list, click the personalize list icon in the right corner, pick the columns and their order, set any display options, and select OK. The list reloads with the changes.

Choosing the first column deserves thought. The values in the first column display as links. When that column is not a reference field, the link opens the record shown in the list. When it is a reference field, the link opens the record in the referenced table instead. A reference field in first position therefore sends readers somewhere they may not expect, so a field such as the record number is the safer choice.

The same window carries display options that apply to all of a user’s lists: Wrap column text shows long text across several lines, Compact rows reduces vertical spacing, Active row highlighting highlights rows as the cursor passes over them, and Modern cell coloring switches to updated field status indicators.

Two list editing options live there as well, and they need the list editor to be configured. Enable list edit lets the list editor open, and Double click to edit makes a double-click open it instead of a single click.

To undo personal changes, open the personalize list icon and select Reset to column defaults. That returns the list to its default layout.

Configure the list layout as an administrator

Several of these steps start from a right-click on a column heading. For the wider concept, see the context menu in ServiceNow.

The shared layout is set from List Layout. The role is personalize_list.

  1. Go to the list.
  2. Open the List controls menu and choose the view to configure.
  3. Right-click any column heading and choose the list layout option.
  4. Add, remove or reorder fields to set the columns and their order.
  5. Save.

A few behaviours matter once a shared layout is live. If a user already has a personal list and the view is later configured differently, the change does not show for that user until they reset their personal list to column defaults. Inactive fields keep displaying in administrator-configured lists until an administrator removes them from the layout. Going the other way, when an administrator removes an inactive field from the default view, personal lists reset to follow the default view and lose that field too.

The first non-reference field links to the record’s form, so putting the record number in the first column gives each row a working link to its record.

Create and manage list views

An administrator can create a new view from the list itself. The role is admin, and administrators can delete views they created.

  1. Go to the application or module.
  2. Right-click any column heading and choose Configure, then List Layout.
  3. In the List View section, select the existing view to use as a starting point. Its fields appear in the Selected list.
  4. Pick New from the choice list. The Create New View form opens.
  5. Type a name.
  6. Select OK, then adjust fields between Available and Selected and move them up or down.

You can delete a view you created from either the list view or the form view.

Switching views and the user preference

In classic lists, a user switches views by opening the list context menu and selecting View, then the view name. Switching saves the chosen view as a user preference, so the list opens in that view next time. A stored preference takes precedence over a view requested in a link. A user whose preference is the Mobile view still sees Mobile when opening a link that asks for the visual task board view. The sysparm_view parameter names the view for a list or form, and sysparm_view_forced set to true overrides the preference behaviour.

Controlling which view appears

Administrators and users with the personalize role can also set which view is visible by default, and create and modify view rules. A view rule overrides the saved-preference behaviour and forces a specified view. Rules can depend on underlying field values or tie views to user roles.

Filter a list with the condition builder

For the navigator-side counterpart, see the filter navigator. For the text form of a set of conditions, see encoded queries explained.

A filter limits a list to records that meet its conditions. No role is required.

  1. Click the show/hide filter icon to open the condition builder. If the icon is disabled and the breadcrumb contains a related list condition, remove that condition first, because a related list condition in the default filter disables filter editing when List v3 is off for that list. Related list conditions are supported in List v3 and in the Report interface.
  2. Select a field. The field type decides which operators and values are offered. A true/false field such as Active does not accept greater than, while a numeric field such as Priority does.
  3. Select an operator.
  4. Select or enter a value if the operator needs one.
  5. Add further conditions. A top-level AND or OR goes on the toolbar above the conditions, and a dependent AND or OR goes beside an existing condition. The x beside a condition removes it.
  6. Optionally click Add Sort and choose a field and direction.
  7. Click Run.

The field list can include fields on related tables through dot-walking.

Sort a list

No role is required for sorting. Three methods work:

  • Click a column name to sort ascending, and click again to reverse.
  • Right-click a column name and choose Sort (a to z) or Sort (z to a).
  • Use a filter to sort by several columns, such as Category and then Subcategory.

An arrow beside the column name shows the current sort, with a downward arrow meaning descending. The arrow reflects the primary sort.

Choice fields sort differently from other fields. Non-choice fields sort by their label, while choice list fields sort by the underlying dictionary value. This changes results in useful ways. Task State choices of New, Work in Progress and Closed sort in that order by value, but alphabetically by label Closed would come first.

Two limits apply. Lists cannot be sorted by array-based fields such as Glide lists. In translated instances, sorting is supported on translated_text, translated_field and translated_html columns.

Group a list

More topics of this kind are collected in the ServiceNow platform section.

Grouping aggregates a list by a field and shows the record count beside each group name. Groups are named for the values of the grouping field, so grouping by assigned user gives one group per user. No role is required.

  • From the title bar, open the context menu, select Group By and choose the field. Selecting — None — removes the grouping.
  • From a column header, right-click the column name and select Group By. Select Ungroup to remove it.

Click the arrow beside a group name to expand or collapse it.

Frequently asked questions

Can I change the columns of a list without affecting other users?

Yes. Personal list changes apply to the individual user and the specific list view, and they do not change what other users see. The personalize list icon opens the window for this.

Why did my column change not show up for a user after I edited the layout?

A user with a personal list keeps seeing their own columns until they reset to column defaults. The reset button sits in the personalize list window.

How do I sort by more than one column?

Use a filter. Build the conditions, click Add Sort, and choose a field and direction, for example Category and then Subcategory.

Why does sorting a choice field not follow the labels?

Choice list fields sort by the underlying dictionary value, not the label. Task State sorts as New, Work in Progress, Closed by value, but would put Closed first by label.