Mobile Publishing is the tool that builds a branded version of the Now Mobile or Mobile Agent app. An admin submits a request under All > Mobile Branding > Manage Mobile Publishing Apps, ServiceNow builds it, you test and approve it, and the app goes to Apple Business Manager, the Apple App Store or Google Play, depending on distribution type.
What the tool produces
A Mobile Publishing request covers one app. You choose the app type, which is either Now Mobile or Mobile Agent, and the operating system, which is iOS, Android or both. In the Washington DC release and later, select customers can use custom app types. For the wider set of mobile guides, start at the mobile experience hub.
The distribution type shapes much of the rest of the process. Private distribution, labelled Private/Enterprise on the form, is available for iOS and for Android. A private iOS app is published to your own Apple Business Manager account and then given to employees through a mobile device management vendor or through Apple Business Manager store redemption codes. A private Android build gives you an Android Package (.apk) and an Android App Bundle (.aab), which you upload to your mobile device management portal or your Managed Google Play account, or host on a website for employees to download directly. Public distribution produces an app for the Apple App Store or Google Play Store. The two routes have different build steps, different test methods and different waiting times, so it helps to plan them as separate tracks even when they begin on the same form.
The outputs differ by platform. A public Android request gives you an Android App Bundle (.aab) to download and test. If you supplied a developer verification snippet, a signed Android Package (.apk) is also available. A public iOS request gives you an Xcode archive (.xcarchive). You download it, update it and re-sign it to produce an iOS application archive (.ipa), and then upload the .ipa for testing.
Public and private routes compared
| Route | Where the approved app goes | How it is tested | Timing stated by ServiceNow |
|---|---|---|---|
| Private iOS | Your Apple Business Manager account | TestFlight | 2 to 4 weeks to ready for testing |
| Public iOS | Apple App Store | Upload the .ipa for testing | About one week to ready for testing |
| Public Android | Google Play Store | Test the .aab file | About one week to ready for testing |
Before you submit a request
Who can start a request
The request requires the admin role, so the person completing the form needs that role on the instance.
Where the request lives
Go to All > Mobile Branding > Manage Mobile Publishing Apps and select Request a new app. The same page lists your earlier requests under the heading “Your recent app requests.” Open a request to reach its Request details page, where build status appears.
Assets and details to gather
Collect these before you open the form.
- App icon for iOS: a PNG at 1024 x 1024 px showing the company logo with no text, filling most of the image, with flattened layers, a solid background and no rounded corners.
- Splash screen logo: a PNG at 2048 x 2048 px with the company name and logo on a transparent background.
- Splash screen background colour: a hex value picked with the colour picker on the form.
- Short name: no more than 13 characters.
- Internal iOS testers: the first name, last name and email of each tester. Testers must be able to receive Apple TestFlight notifications.
- Universal links: the instance URLs the app should open.
- For Android: a Firebase app ID, a Firebase API key and a Firebase project ID.
- For private iOS: the Organization ID and Organization name from your Apple Business Manager account settings.
- For Microsoft Intune: a Microsoft Entra ID administrator who can consent before distribution. The Intune option appears in the Mobile Application Management section.
Check each file against the size and background rules above before you upload it.
Filling in the request form
The request moves through a fixed sequence of forms. Each one ends with a Next button, and the final one ends with Submit.
Basic info
Enter your contact name and email. Build status notifications go to that address. Set the app type, the distribution type and the operating system. For public distribution, select Public and accept the terms in the dialog box. The operating system field offers iOS, Android, or both, so pick the combination your rollout needs.
App details
The short name comes first, limited to 13 characters. The bundle ID for iOS, or the package name for Android, fills in automatically from the app name and type.
Four other settings on this form change what the user sees:
- Mobile Application Management: switch it on to use a MAM vendor. The vendor list shows Microsoft Intune.
- EULA and privacy policy: switch on the ServiceNow defaults, or enter your own EULA and privacy policy addresses.
- Deep links and universal links: select the instance URLs to build in, or add a custom one. These can be edited only when you submit a new request or update an existing branded app.
- Login management: switch on Pre-populate instance to build a secure default instance into the app, so users enter only their credentials. An optional Nickname can be entered. The default instance URL must be secure and use https. Leave it off if you already set the default instance through AppConfig in an EMM suite or an embedded MAM SDK app.
iOS setup
On the iOS form, add the icon, the splash screen logo and the splash background colour described above. Then add the internal testers and set the universal links. Select Next when the form is complete.
Android setup
The Android form asks for the Firebase app ID. Each request needs its own ID, because the ID identifies the Android app inside your Firebase project. The default package name follows the pattern com.servicenow.b2b followed by the long app name without spaces and the client type.
The form also has a few settings that affect Android behaviour. Trusting user-added certificate authorities is off by default. Apps that target API level 24 do not honour user-supplied certificate authorities unless you turn the opt-in on. The snippet itself can contain only letters and numbers. If you move forward without a snippet, the form shows a Developer Verification alert, and you can continue past it or return and add one.
The Android icon set has three parts: an adaptive icon foreground at 2048 x 2048 px, an adaptive icon background at 2048 x 2048 px with no logo, text or graphics, and a notification icon at 2048 x 2048 px. Keep the icon and any text at least 550 pixels from the edge, so rounded corners do not clip them.
Review and submit
The Review and submit form lists your selections from every earlier step. Check it, then select Submit. After submission the instance builds the app. You can run one build at a time, so a second request cannot be submitted until the current build is canceled, has failed, or has completed. For other problems with a build, see the troubleshooting guide.
Build timelines and how to plan around them
The following timings apply to each route. ServiceNow cannot expedite the Apple and Google review timelines.
- Public iOS: about one week from submission to ready for testing. Apple sets this timeline.
- Public Android: about one week from submission to ready for testing. Google sets this timeline. A public Android build can sometimes finish in a few hours.
- Private iOS: two to four weeks to ready for testing, because Apple’s human reviewers inspect privately distributed iOS apps.
If you have a deadline, submit the Android app first. You can then test it while the iOS build is still in progress. Plan the iOS date around the longer wait, not the Android one. For planning a launch date around these waits, see the implementation roadmap guide.
Testing, approval and deployment
When the build finishes, you receive an email at the requester address. For iOS, the build gives you a link to download an Xcode archive (.xcarchive), and a notification email reports the build status. For Android, it includes the .aab link, and the .apk link if you supplied a developer verification snippet. Status also appears on the Request details page.
For private iOS, test the build with TestFlight. After you approve it in the instance, the app is published to your Apple Business Manager account. From there you distribute it to employees through a mobile device management vendor or with Apple Business Manager store redemption codes.
For public iOS, test the build as described above. When testing is complete, approve the build in the instance, then deploy the app to the Apple App Store. For Microsoft Intune, register the app in your Microsoft tenant after the build is created and before you distribute it.
For public Android, test the .aab file. After successful testing, approve the build and deploy the app to the Google Play Store. For a broader view of acceptance testing, see the acceptance checklist.
Adding or changing internal iOS testers after submission requires a ServiceNow Support ticket. Universal links and the pre-populated instance URL can be edited only as part of a new request or an update to a branded app.
Frequently asked questions
Who can request a branded app?
The request requires the admin role on the instance.
Can I add an iOS tester after I submit the request?
Yes, but not through the form. Adding or changing testers after submission requires a ServiceNow Support ticket.
Why does a private iOS app take several weeks?
Apple’s human reviewers inspect privately distributed iOS apps, and readiness for testing can take two to four weeks. ServiceNow cannot expedite this because Apple sets the timeline. Submit the request as early as you can.
Can I request iOS and Android in one submission?
Yes. The operating system field accepts both platforms. If you need the apps on a fixed date, submit the Android request first so you can start testing while the iOS build is still in progress.