OBLYTECH Logo
OBLYTECH Logo

System Events and Scheduled Jobs Dashboard: What Each Panel Shows

The System Events and Scheduled Jobs dashboard is the Monitor view for background processing. Its System Events side shows how the event queue is handling platform events. Its Scheduled Jobs side shows which jobs are pending, running, stuck or in error. Together they show whether a delay sits in event handling or in the scheduler.

Where the two halves live and who can open them

The dashboard is one Monitor module with two tabs. The Scores tab covers event processing and the Scheduled Jobs tab covers the scheduler. The event side needs the dashboard application installed before any event or queue information appears, so check that installation first if the event side is empty. For the broader dashboard and reporting setup, see reporting and dashboards.

The dashboard is installed with the admin role. The admin role can see all events and jobs information on the dashboard and set up alerts at instance level, and it is not an elevated role. For the wider access model behind these roles, see instance security and access control.

View Menu path Question it answers Default window
System Events All > System Diagnostics > System Events Dashboard Is event processing keeping pace with incoming events? 24 hours, trends up to 15 days
Scheduled Jobs All > System Diagnostics > System Events and Job Monitoring > Scheduled Jobs Dashboard Are jobs running on time, or are some stuck or failed? 24 hours, graphs up to 7 days

Setting the filters on the System Events view

Start with the queue and the event type. The default queue is already selected, so change it first if you want a different one. Then set the start and end dates, and select Apply. Clear removes the filter so you can begin a new selection. The Scores and Details sections redraw from those choices, and the cards you see depend on how the selected queue is built.

Reading the health cards in the Scores section

The health cards depend on the processing model behind the selected queue.

Cards by processing model

For queues that use the delegator model, two cards appear: Active Delegators and Active Processors. A delegator hands events out to queues that use delegated event processing, and clicking its card lists the delegators. A number shown in red on the Active Processors card means that processor needs configuration.

For queues that run on the processing framework without the delegator or dedicated model, the Active Jobs card appears instead. It counts the jobs attached to the queue. The framework creates these processing jobs automatically, based on configuration and checks.

When no queue is selected, the Active Delegators, Active Processors and Active Jobs cards all show together.

Alert and schedule cards

Event Processing Alerts counts the alerts raised in the last 5 hours. Clicking it opens the Events Alerts table. Event Jobs on Schedule counts scheduled-job events that are on schedule.

Reading current scores and trends

Current Scores is the direct check. It reads the event table (sysevent) and reports the state of events inside the selected period.

Field What it counts
Total Events All events in the system within the set period
Total Ready Events waiting to be processed
Total Processing Events being processed now
Total Processed Events already processed
Total Error Events in an error state
Total Transferred Events moved from the previous shard to the current shard

Read these figures together. Compare Total Ready against Total Processed over the same window. If the ready count keeps climbing while the processed count stays flat, the queue is falling behind. Compare the counts with the normal volume on your instance.

The Trends section graphs activity over time, defaulting to 24 hours and widening to 15 days. It has four graphs: the Event Delegation Trend, the Event Processor Trend, the Event Trend and the Email/Script action Handler Trend. Use them to tell a one-off spike from a pattern.

Configuring and reading event alerts

The application ships with five event alerts. Each is checked on a cycle of roughly 15 minutes, and each sets its conditions around a queue. Alert conditions are validated approximately every 15 minutes, so an edit may not appear in the Event Alerts list until the next validation.

To change an alert, go to System Policy > Events > Configure Alerts, open the alert and adjust its conditions. A notification appears in the notification icon when the alert is created. The live alert records sit under System Policy > Events > Alerts. When an alert is no longer needed, select Reset alert.

Reading the Scheduled Jobs dashboard

The Scheduled Jobs dashboard opens from System Diagnostics under System Events and Job Monitoring. It begins with two cleanup tiles.

Stuck Jobs

The Stuck Jobs tile lists parent jobs pinned to a node that no longer exists. A job qualifies when its Trigger Type is something other than Startup. The System ID column names the node the job was assigned to. One reason a job lands in Stuck Jobs is an instance cloned from another instance, where jobs still point at the source instance’s nodes.

Two actions are available. Delete removes the job from the sys_trigger table permanently. Recover clears the System ID column so the job can run again at its Next Action time.

Permanent Error Jobs

The Permanent Error tile lists jobs whose State is Permanent Error. After an upgrade from a release earlier than Utah, a fix script moves parent and standalone jobs tied to a missing node into that state. The same two actions apply. Delete removes the job permanently, and recover sets the state back to Ready so the job runs again at its Next Action time.

The Lateness column on both lists measures how late a job is against its scheduled time. If Next Action is in the past, lateness is the current time minus Next Action, so a job that was due two minutes ago shows two minutes. A job scheduled for the future shows zero.

Pending, running and history views

Pending Jobs lists jobs due to run soon, and Running Jobs lists jobs executing right now. Total Execution Count plots scheduled job executions over time, and Average Lateness plots the average lateness in milliseconds. Both default to 24 hours, widen to seven days, and read the sys_scheduler_job_history table. Clicking a point opens the Scheduled Job History list, grouped by trigger type, Run Once or Recurring.

Job classification and the trends table

Jobs Classification is an optional grouping of jobs by filter conditions, defined in the Job Classification Rules table. The default classification is TriggerType.JobName, which groups jobs by trigger type and job name.

The Scheduled Job Trends table lists completed jobs by classification, with a default view of the last 24 hours. Its columns are Job Classification, Priority, Execution Count, Average Processing Time in seconds and Total Processing Time in seconds. A lower priority number runs first, so priority 10 is processed ahead of priority 100. A classification whose average processing time climbs while its execution count holds steady suggests each run is taking longer rather than running more often.

How job states and the event queue connect

Scheduled jobs periodically read the event queue, which is the event table also known as the event log, and pass each event to a handler. A handler can run a script action, send a notification, trigger a workflow activity or trigger an inactivity monitor. The scheduled job basics page covers how a job is defined before you read its health here.

Business rules create the event records. Each carries a Name such as incident.updated, two parameters (Parm1 and Parm2), the Table the rule ran on, and the sys_id of the record.

When events back up on the System Events side while the Scheduled Jobs side shows rising lateness or jobs in the Stuck Jobs or Permanent Error tiles, the two problems may be linked.

Event processing during a platform upgrade

Two system properties control which events are processed during an upgrade. The glide.event_processor.all_events_upgrade_safe property defaults to false, and setting it to true processes all events during an upgrade. While it stays false, glide.event_processor.upgrade_safe_events takes a comma-separated list of event names, and the listed events are the ones processed. That list defaults to empty. Reading these settings next to the dashboard helps separate an intended post-upgrade backlog from a configuration gap. For the wider upgrade planning around this, see upgrades and release readiness.

If the dashboards point to a wider slowdown, the platform performance guidance covers the tuning side.

Frequently asked questions

Who can open the System Events and Scheduled Jobs dashboard?

The dashboard is installed with the admin role. The admin role can see all events and jobs information and set up alerts at instance level.

Why does the Active Jobs card not show for some queues?

That card appears for queues that are not on the delegator or dedicated model and that run on the processing framework. Queues on the delegator model show Active Delegators and Active Processors instead.

What is the difference between deleting and recovering a stuck job?

Delete removes the job from the sys_trigger table permanently. Recover clears the System ID so the job can run again at its Next Action time. For a permanent error job, recover sets the state back to Ready.

Why does a scheduled job show a lateness of zero?

Lateness is measured against Next Action. A job scheduled to run in the future shows zero, and lateness builds up once the scheduled time has passed.

Does a change to an alert take effect right away?

Not immediately. Alert conditions are validated approximately every 15 minutes, so a change may not show until the next validation.