For the application rationalization bubble chart in Enterprise Architecture Workspace, first identify the view and the two indicator scores it plots. Performance Analytics is one optional source of those scores. The chart shows assessed business applications. To display more than the default 500 bubbles, a user with sn_apm.apm_admin updates sn_apm_ws.appRationalizationMaximumBubbles, then checks the chart count and eligibility of missing applications.
The application performance question guides the chart settings
The application rationalization bubble chart positions business applications against two selected indicators, with bubble size providing another comparison. Performance Analytics can supply application indicator data from existing PA indicators, such as incident or change counts. Other supported sources include assessments, custom scripts, query conditions, and indicators that aggregate child indicators.
For an operational portfolio review, decide which two measures should drive the comparison before changing the display limit. Write down the chosen indicators, scoring profile, fiscal period, and expected application population. This gives the analyst and administrator a shared test case: a named application should have scores for both selected axes in the same period.
Check the display property, score records, and profile selection on your instance before applying changes. For broader chart selection, use the guide to Platform Analytics data visualizations and charts.
The bubble population depends on scores and eligibility
A business application list and a bubble chart can show different totals. The chart requires assessed applications, and the selected X and Y indicators must both have score records for the selected fiscal period. An application scored for one axis alone does not produce a bubble. Raising the display ceiling cannot supply the missing score.
Open the application rationalization view and select the Bubble chart tab. Check the total above the chart, then select the bubble count details icon to inspect the calculation. Also inspect grouped bubbles: applications with axis values within +/-0.25 of each other can appear together. Select a group to see its individual application cards in the info pane.
- Record the fiscal period selected on the chart and the two axis indicators.
- Inspect apm_app_indicator_score.list for that period and the X-axis indicator.
- Compare the configuration items with records for the Y-axis indicator in the same period.
- Identify expected applications missing from either set before requesting a larger bubble limit.
Review the application selection as well. The sn_apm_ws.business_application_default_filter property controls eligibility through an encoded query. The default filter excludes applications with an install status of Retired or Decommissioned, or a lifecycle stage that is End of Life or empty. A customized filter may exclude other scored applications. To request a filter change, contact your ServiceNow account service manager. Increasing the display limit does not change this eligibility query.
The application rationalization bubble display limit is configurable
The role required for this property change is sn_apm.apm_admin. The property is sn_apm_ws.appRationalizationMaximumBubbles, and its default permits a maximum of 500 bubbles. Use this change when the assessed application population exceeds that limit and the review needs the larger population visible.
- Select All and enter sys_properties.list in the navigation filter.
- Locate sn_apm_ws.appRationalizationMaximumBubbles.
- Select here to update the property details.
- In Value, enter the maximum number of bubbles required for the application rationalization chart.
- Select Update.
Choose the value against the population recorded during the earlier checks. Keep the previous value in the change record and describe why the review needs the new ceiling. As an operating recommendation, this gives the next administrator context for the setting and a value to restore if needed.
Return to the chart and check the count and bubble details against the intended population. The chart displays bubbles up to the configured Value; that ceiling does not guarantee that an application passes the score and filter requirements. Verify a few named applications that were previously absent rather than accepting a higher total as the entire test.
For help planning this work, see ServiceNow implementation.
The axes, fiscal period and score values need checking before the chart is read
Configuring the chart requires sn_apm.apm_analyst. Navigate through Workspaces to Enterprise Architecture Workspace, open Application Rationalization, and select Bubble chart. Select the settings icon, choose the X-axis, Y-axis, and Bubble size, set Bubble labels as needed, and select Apply.
Axis options depend on the Application Bubble Chart table, apm_bubble_chart. Adding an indicator to a scoring profile alone does not make it an axis option. Check that the chart configuration references the intended indicators and that those indicators belong to the profile used for the scores. An available axis option still needs score records to plot applications.
The axes read Normalized Value from Indicator Score records in apm_app_indicator_score. These values differ from raw assessment inputs and weighted indicator scores. The normalized range is 1–10, while the chart axis scale is 0–10. Review indicator direction before interpreting a high plotted position as a high raw score: Minimize indicators involve inversion.
Overall Application Score records in apm_app_score contain the aggregate application score. When the overall score is selected for bubble size, changing indicator weights affects that aggregate and therefore the size comparison. It does not directly move the axis positions, which read normalized values. Agree which visual dimension answers the review question before drawing a conclusion.
Use Scores for fiscal period to inspect the intended period. The chart initially uses the latest fiscal period derived from the indicator score list and saves the selected period preference. The period type follows com.glide.fiscal_calendar.fiscal_unit. Match the period to the indicator frequency: quarterly indicators show no data when the chart is set to a month. Record the period alongside screenshots or review notes so comparisons remain understandable later.
A custom scoring profile needs one matching identifier
The scoring profile selection uses sn_apm_ws.app_indicator_scoring_profile. As a review step, compare its value with the sys_id of the intended profile and confirm that the application scores were created under that profile. A blank property uses the Default Application Profile. Review the Profile Indicators related list as well: the two axis indicators must be part of the profile, and the chart configuration must reference those indicators.
Keep the profile identifier precise. This property accepts a single sys_id. Comma-separated identifiers are unsupported; multiple values cause the chart to use the Default Application Profile instead of the custom profile. Before investigating chart positions, compare the selected profile with the profile under which the score records were generated.
For a scored application that is still absent, apply the default filter query to cmdb_ci_business_app.list and check whether that application remains in the results. This tests eligibility independently of the profile and axis records. Do not combine a profile correction with a bubble-limit increase in one unexplained change: document which setting addresses which observed issue. For a wider configuration inventory, use the roles, tables, and properties reference.
A focused chart acceptance review uses named applications
For a recommended acceptance review, choose three named applications: one with both scores, one that was missing before the limit change, and one inside a grouped bubble. Compare their score records, fiscal period, and info pane details.
Read the color legend separately from axis position and size. Bubble color reflects the application’s planned disposition, and the color settings cannot be modified. For the portfolio review, record why the team chooses a disposition rather than treating the plotted location as the decision itself.
Preserve the chosen indicators, property value, count result, and outstanding exclusions in the handover. If the next requirement is moving analytics content between experiences, address that work through the Platform Analytics Migration Center guide after the chart behavior has been accepted.
Questions about reviewing application bubbles
Can I inspect an application without reading its label on the chart?
Hover over its bubble to see an assessable record score summary. Selecting the bubble displays the associated business application data in the info pane, which helps inspect crowded areas.
Why does panning seem unavailable?
Panning requires the chart to be zoomed in. With a mouse or trackpad, hold Shift, then click and move the cursor. The zoom reset icon returns the chart to its default zoom level.
Can a browser zoom help during an accessible review?
The bubble chart page supports browser zoom at 200% or 400% without loss of content or functionality. Its layout becomes a vertical, stacked view at those zoom levels.
What should I check if a custom indicator is absent from bubble size choices?
Check whether the indicator is active and attached to the default application profile. These checks concern the indicator’s availability; increasing the maximum bubble count addresses a different setting.