OBLYTECH Logo
OBLYTECH Logo

ServiceNow Domain-Aware Performance Analytics Guide

Domain-aware Performance Analytics means indicator scores, dashboards and reports each show a user only the domains that user can access. You get there by picking a domain approach, building domain configurations that group the domains you want to score, attaching those configurations to collection jobs and dashboards, and separating reports through a domain reference.

Choose the approach before building anything

Performance Analytics offers three ways to split work by domain, and the choice shapes everything after it. For the general idea behind domain separation, see the general concept of domain separation. The global approach keeps indicators, breakdowns and widgets in the global domain and moves the separation into the data collection jobs. Each job runs in the domain of its Run as user, collects scores against the facts table records it can reach, and stores each score in the domain it came from. This is the usual starting point, and the platform’s own analytics solutions use it.

The domain-specific approach separates the Performance Analytics records themselves. Each domain gets its own pa_admin users, who create indicators and breakdowns inside that domain. A user in a child domain can read a parent’s records but cannot edit them, so a copy is needed before a record can be adapted.

The hybrid approach splits the work by level. Foundational records such as indicator sources, breakdown sources, scripts and filters stay in the global or a parent domain, while child domains manage indicators and widgets with the pa_power_user role. It is an advanced option, so get one of the other two approaches working properly first. If you would rather hand the build to a team, see the Performance Analytics implementation service.

Build a domain configuration

A domain configuration defines which domains to collect scores from and how those scores are stored within the domain hierarchy. For the indicator side of those scores, see the indicator basics. It replaces configuring Performance Analytics for one individual user’s domains. The person creating it needs the pa_admin or admin role, and the domain support plugin must be active. Navigate to All, then Platform Analytics Administration, then Data Collector, then Domain Configurations, and create a record. Domain configurations are supported only under the global approach, so settle that choice before building any configuration.

The first decision is the configuration type. A visibility group includes every domain visible to a chosen group, based on the visibility domains attached to that group. Conditions select domains directly with filter conditions on the Domain table, for example a Type of MSP. The remaining fields control collection and storage:

Field What it controls Set it when
Collect aggregate Adds scores from the configured domains into one combined score You need a single total across a group of customers or business units
Collect children Collects scores from all child domains, not just direct children Your hierarchy runs more than one level deep
Roll up Carries collected child scores up to the top-level parent Parent managers need a total that includes their children
Roll up type All child domains, or Only selected domains The roll-up should follow the domains the configuration names

Collect aggregate creates one aggregate domain per configuration, placed as a child of the Performance Analytics Aggregation Container domain. It holds scores and nothing else. For a visibility group, a child counts as explicitly included when both it and its parent sit in a visibility domain of the group. For conditions, the conditions must select the child and its parent. Moving a configuration to another instance uses an update set, and an aggregation domain needs transferring as well.

Roll up child domain scores

Without the domain support plugin, records in child domains roll up into the parent score automatically. The plugin adds control over that, including the choice of rolling up every child or only the named ones.

The worked case below uses a parent domain called MSP that holds 20 records of its own, with three child customer domains holding 30, 100 and 50 records:

Setting Child scores kept Parent score Aggregate
Collect children 30, 100, 50 20 none
Collect children, roll up all child domains 30, 100, 50 200 none
Collect children, roll up the first and third child 30, 100, 50 100 none
Collect children, roll up all child domains, aggregate on 30, 100, 50 200 380

Read each row as the parent’s own records plus whatever children it rolls up. Rolling up every child gives the largest parent figure, and choosing a subset of children gives a smaller one that counts only those children. Turning on the aggregate adds a combined number in its own domain and leaves the parent score exactly as it was.

Point collection jobs at the right Run as user

The Run as user determines the domain context in which a data collection job runs, whether or not a configuration is attached. The Run as user also shapes what a job can see. For data tables such as incident, a global administrator as Run as user has full visibility of all data table records, so the scores are complete.

Process domain records behave differently. Business rules and SLAs are often defined on a process domain, and a global administrator sees only the global-domain records of those tables. The same limit reaches scores collected through database views, such as a join to the contract_sla table. In that case, set a user with explicit visibility into the relevant process domains as the Run as user. When a score looks low, check the Run as user before the indicator.

Show domain-specific scores on dashboards

A Core UI dashboard can show a domain picker so users view one domain’s scores at a time. For the dashboard basics first, see the dashboard basics. The role needed is pa_power_user or admin. Navigate to All, then Platform Analytics Administration, then Core UI Artifacts, then Dashboards. Open the dashboard, use the Domain Configurations related list to select Edit, pick the configurations, and save.

A user must have visibility into every domain in the configuration to see its domain-specific scores. An administrator with that visibility selects a domain, and the reports and widgets then show values for that domain alone. Platform Analytics dashboards follow a different route: you add a domain filter to the dashboard and point it at a Performance Analytics domain configuration.

Share dashboards and reports across domains

Domain separation covers dashboard records, dashboard tabs and widget containers. For the wider reporting picture, see the reporting and dashboards hub. Only shared dashboards are visible to other users. A dashboard created in a parent domain is visible to that parent and its child domains, provided it is shared with them.

Editing is tighter. A user with edit permission can change a dashboard only from the same domain as the dashboard. Child-domain users can read parent-domain dashboards but cannot overwrite them. For child-domain users to see parent dashboards at all, domain separation and delegated administration must both be enabled. Avoid editing a domain-separated dashboard from the global domain, because additions made there are not visible inside the separated domain.

Reports split into a design and its content, and both are separated. For how a report gets its data, see the report source basics. A global report is visible to every child domain. A report created in a child domain is visible to its parent but not to sibling domains. Copying a report keeps its structure and adjusts the data to the target domain. An Active Incident report shows a parent-domain user all active incidents, and an IT-domain user only the IT incidents.

Turning on report separation needs the security_admin role. By default the domain support plugin does not separate reports unless the MSP Extensions plugin is installed. To separate a report, go to All, then Reports, then Administration, select the report, right-click its header, and choose Configure, then Dictionary. On the sys_domain field, enter the domain in the Reference. A blank reference leaves the report global.

Check the report ACL assessment on a separated instance

The property sn_report_acl.run_scan_with_queryNoDomain controls the scope of the ACL assessment for data visualizations on a domain-separated instance. Set to false, it limits each security_admin to results from the domains that person can see. A global security_admin can set it to true for a whole-instance view, and should then set it back to false. While it stays true, any security_admin can query the entire instance, and collected results are overwritten.

Frequently asked questions

Do I need the global approach before I create domain configurations?

Yes. Domain configurations are supported only under the global approach, so choose that approach before building any configuration.

What is the difference between a visibility group and conditions?

A visibility group takes in the domains visible to a chosen group through that group’s visibility domains. Conditions select domains directly, using filter conditions on the Domain table.

Why does a collection job report scores from only some domains?

The Run as user sets the domain context for the job. For process records such as business rules and SLAs, a global administrator sees the global-domain records only. Run the job as a user with visibility into the process domains.

Can a user in a child domain edit a dashboard created in the parent domain?

No. Child-domain users can read a shared parent-domain dashboard, but they cannot overwrite it.