To apply filters to a Process Mining map, match the dashboard filter to the process project’s table and a field configured as a project breakdown. Use a single-select or true/false filter. For single-select filtering, both the filter source and the data being filtered must match that table and breakdown field.
Check the project before configuring a dashboard filter
Start with the process project behind the map. A dashboard filter and a map can concern the same business process without having the table and field relationship needed for filtering. Identify the project’s table first, then identify the breakdown field you want readers to use. Treat those as a pair when reviewing the dashboard configuration.
In Process Mining Workspace, the Analyst Workbench includes a Breakdown Filters column for the project. Use it to inspect the available breakdowns. The project’s table configuration record also lets you view and change breakdowns. Finding a field on the underlying table is not enough: establish that it is a breakdown for this project before building the corresponding filter.
For an Incident project, Category provides a concrete example. If Category is included among that project’s breakdowns, it can support the matching dashboard filter. If it is absent, pause the dashboard setup and review the project configuration. Do not assume that a field suitable for a chart is already prepared for the map.
Keep the initial check short and explicit:
- Identify which project supplies the Process Mining map.
- Record the table used by that project.
- Inspect the project’s breakdowns for the intended field.
- Choose single-select or true/false according to the field and the selection required.
Apply a single-select filter to a Process Mining map
A single-select filter needs alignment on both sides: its filter source and its data to filter must use the process project’s table. The field must also be a breakdown of that project. Checking just the source leaves part of the configuration unverified.
Consider a dashboard containing a map for an Incident project with Category configured as a breakdown. The intended interaction is for a reader to choose a category and examine that portion of the process. Use Incident as the table and Category as the field when creating the filter. That selection supplies the table and field for both the filter source and the data to filter.
- Open the dashboard containing the Process Mining map for the identified project.
- Create a single-select filter for the project’s table.
- Select the field already identified as a project breakdown.
- Review the source and data to filter against the same table and field pair.
- Test a selection and inspect the map before adding further filtering conditions.
The Incident Category filter can affect the map as well as an Incident bar visualization. This gives you a second place to observe the selection during testing. Keep the comparison tied to the table and selected category; a chart changing elsewhere on the dashboard does not by itself establish that the map has the required configuration.
When placing the map alongside other reporting elements, use Process Mining dashboard and KPI configuration to plan the surrounding dashboard. Keep the map’s filter check focused on its project breakdown.
Use a true/false filter for a Boolean breakdown
A true/false filter uses the data to filter, without a separate filter source selection. Match that data to the process project’s table and a field used as a breakdown. The field’s Boolean type does not remove the breakdown requirement.
For the Incident example, Active can provide the Boolean breakdown. With Active configured as a breakdown for the project, set the true/false filter to Incident.Active. It can then filter the Process Mining map and a data visualization on the Incident table.
Test the two values separately. Note which value is selected when recording the result, especially if the dashboard also has a Category filter. A reviewer should be able to distinguish the effect of the Boolean selection from the effect of the category selection. Begin with one condition, inspect it, then test the other filter on its own before reviewing the combined dashboard state.
Choose the filter type around the question being asked. Category supports choosing a category in the single-select example; Active supports a Boolean selection. Avoid substituting a different field merely because it is easier to locate in the filter configuration. The chosen field should express the population the analyst intends to examine.
Verify the filter with a controlled comparison
Before testing, write a one-sentence expectation: selecting a particular category should scope the Incident project’s map to that category. This makes the test assessable. A vague expectation that the dashboard should change leaves too much room to accept an unrelated visual response.
Capture the starting state, including any existing selections. Apply the filter under review and inspect the map. If an Incident visualization is available alongside the Incident map, observe its response too. Use the two views to investigate whether the selection is reaching the intended content, while checking their respective configuration rather than expecting identical displays.
Keep these checks in the review record:
- The project, table, and breakdown field used for the test.
- The filter type and selected value.
- The map’s starting state and observed response.
- Any other active dashboard selections that could affect interpretation.
- The next configuration item to inspect if the response is unexpected.
This is a suggested verification method, not an additional product setting. It gives a dashboard owner enough information to repeat the test. Check the behavior on your instance and release before treating the dashboard as ready for other readers.
Investigate a map that does not respond as expected
Work back through the relationship in order. First, verify the project behind the displayed map. Next, verify the project’s table. Then inspect the intended field in the project’s breakdowns. Finally, compare the dashboard filter configuration with that table and field. This sequence helps separate a project mismatch from a filter configuration mismatch.
If the single-select source looks correct, continue to the data to filter. Both sides matter. If the map uses an Incident project, a source associated with another table does not satisfy the stated matching condition. Similar field labels across tables are a reason to inspect the table identity closely.
If the problem concerns a true/false filter, inspect its data to filter and the Boolean breakdown. Do not spend time looking for the separate source selection used in the single-select example. For Active, confirm the relationship to the specific Incident project being displayed, then repeat a simple test.
When the review reveals missing breakdown preparation, agree on the field needed before changing the project. For help planning this work, see ServiceNow implementation.
Keep broader project questions separate from the immediate filter test. For example, questions about the origin of project data belong with external data for Process Mining. Resolve the table and breakdown relationship for the current map before widening the investigation.
Close the review with a clear acceptance decision. If the selected value produces a view that the analyst can interpret, record that result with the configuration checked. If the result remains uncertain, identify the unresolved item rather than describing the dashboard as complete. A handover note should distinguish an unverified response from a known table or breakdown mismatch. That distinction gives the next reviewer a starting point and avoids repeating the entire investigation without a question to resolve.
Questions to settle before sharing a filtered map
What should accompany a screenshot used in a review?
Add a short caption naming the project and selected filter value. Include the question the screenshot is intended to answer. That context helps another analyst interpret the view without guessing which population was under discussion when the image was captured.
How should a team choose its first filter?
Start with a question that a dashboard reader needs to answer, then choose a matching breakdown field. Prefer a narrowly defined review, such as examining a category, over introducing several choices at once. The first test should have an expectation the reviewer can explain plainly.
How should a filter request be handed to the dashboard owner?
Provide the project name, intended field, desired selection type, and an example question. Ask the owner to assess the table and breakdown relationship before implementing the request. This gives the owner a specific configuration to evaluate rather than a general request to make the map interactive.
When should the team move from filtering to improvement analysis?
Move forward when reviewers can identify the population under discussion and reproduce the relevant view. Record the question raised by that view before assessing possible changes. For the next stage, see Process Mining improvement opportunities.