Usage Insights is the Platform Analytics application that monitors how users interact with ServiceNow Core UI, Next Experience, Service Portal and mobile applications. You reach it through All, then Platform Analytics, then Usage Insights. Once inside, the landing view summarizes activity, two menus split the data into analysis modules and raw lists, and filters narrow the views.
Who can open Usage Insights and what each role allows
Any Usage Insights viewer role opens the application from the application navigator. Admin roles add settings control and the ability to build funnel and cohort reports. For how access is designed across reporting and dashboards, see reporting and dashboards security and access design.
| Role | What it allows |
|---|---|
| analytics_admin | Changes settings for mobile, web and Service Portal applications; creates funnel and cohort reports |
| web_analytics_admin | Changes settings for web applications; creates funnel and cohort reports |
| mobile_analytics_admin | Changes settings for mobile applications; creates funnel and cohort reports |
| analytics_viewer | Views Usage Insights for mobile and web applications |
Usage Insights also installs separate viewer roles for mobile and web applications, mobile_analytics_viewer and web_analytics_viewer, and each grants viewer permissions for its application type. The Application Files table lists the components installed with the application.
Navigating the All Applications view
All Applications is the default landing view and shows basic statistics across all applications on the instance. The Overview tab aggregates usage over a time frame you choose, with scores for active users, sessions and average session duration, plus a list of usage per application. The Events tab gives a filterable list of tracked user interactions.
Three panels carry the main reading:
- Total active users shows active users, new users and average sessions per user. Selecting a visualization opens its trend analysis.
- Total sessions shows the session count, average page views per session and average session duration.
- Top pages lists the pages with the most views and the most sessions.
Counters contain aggregated user numbers. Two conditions affect what you see. Sampled data is a subset of the total data collected in real time. And if a country’s tracking consent policy is set to Disabled, user metrics are not tracked for that country, although aggregate data collection continues.
Working through the Analysis and Data Foundation menus
Opening a single application shows two menus with different jobs. The Analysis menu holds four modules:
- Retention shows new users, how often they return and the gaps between visits.
- Cohort analysis builds custom groups of users and shows how many perform a given sequence of actions.
- Conversion funnel shows completion rates for a task, the users moving from step to step and the average time to advance.
- Navigation paths shows the most and least popular routes through the application.
The Data Foundation menu holds four lists that you can filter, drill into and export:
| Module | What the list contains |
|---|---|
| Users | A list of users that you can filter, drill down into and export |
| Sessions | A list of sessions that you can filter, drill down into and export |
| Events | User interactions such as page navigation and clicks |
| Pages | Visited pages on the instance, with views and navigation detail |
The Conversations view brings ServiceNow Otto chat activity into Usage Insights. It reports total chat users, live agent transfers and chat-related events, from starting a conversation to selecting a chat action.
Filtering usage data
Usage data is narrowed by default filters that sit on each view and by additional filters you add.
| View | Default filters |
|---|---|
| Standard application pages | Date range, user type and country |
| Mobile applications | Date range, user type and country, plus operating system and version |
| Cross-application overview | Date range, user type and country, plus channel, application and role |
Select Add filter to choose from the configured additional filters: Password needs reset, Role, Enable multifactor authentication, Active, Department and VIP. Additional filters combine with the default filters using AND, so both conditions must be true. A returning-user filter combined with a password-needs-reset filter, for example, leaves all of the visualizations empty when no returning user needs a reset. Widen the date range or remove one condition when a page looks blank.
Users with the analytics_viewer role can filter pages they have access to, as can the channel viewers portal_analytics_viewer, mobile_analytics_viewer, core_ui_analytics_viewer and now_experience_analytics_viewer.
Filtering by user properties
Admins can segment usage by attributes from the user record. The task needs the admin or analytics_admin role. For the user record itself, see ServiceNow user management.
- Open sys_analytics_user_property_config.list and select New.
- Choose the table: sys_user for Boolean, choice or reference fields; sys_user_grmember for the groups a user belongs to; or sys_user_has_role for the roles a user has.
- Pick the field to filter on and select Submit.
Up to 20 fields can be added, including Department and Role, which are available by default. The filter appears at once, but the data takes 24 to 48 hours to synchronize, so results stay incomplete until then.
Viewing page and screen usage
The Pages module, under UI Analysis, shows how web pages are used and how users move between them. Mobile applications use Screens instead. Select the application, then Data Foundation and then Pages or Screens, and use the search icon to locate the page. Viewing page analytics requires the admin role.
| Metric | What it shows |
|---|---|
| Sessions | Sessions containing the page; a page opened more than once in a session counts once |
| Page views | Views of the page and the number of users who visited it |
| Avg. Duration | Average time on the page and its share of time across the application |
| Avg. Load Time | Average time to load the page, based on its views |
The performance graph trends Browser Time, Server Time, Page Load Time or Network Time over a day, week or month. Page Load Time runs from the user’s request until the page is fully rendered. Server Time is what the server takes to process the transaction.
The Navigation section lists the top pages users arrived from and moved to next, each with its share of sessions. The access analytics overlay offers the same kind of page metrics through a utility icon, so you can check a page without leaving it.
Reading page properties
A page property is a named attribute, such as owning team, language or category, captured from URL parameters or record metadata on each page view. Many records share one page identifier. Knowledge articles, for example, all open in the same article view, so the identifier alone cannot say which article was read. Page properties separate those visits.
A page is a view a user opens. An event is an interaction on that page, such as adding a comment or selecting a link. Events carry the page properties too. The minimum versions are Brazil patch 0 and Australia patch 6.
Page properties appear in the filter bar through a Page filter, in a Properties section chart for each property, in a dedicated Pages menu view, and in Advanced filters. A conversion funnel step set to a page also makes that page’s properties available, so drop-off is calculated for a filtered group, such as visits where the article title is Password reset.
Each chart shows distinct values as segments. The legend gives a count and percentage per value, and the center shows total occurrences in the date range. Usage Insights captures a default set of properties on each page, and you can add custom ones. For the general chart types used in Platform Analytics, see platform analytics data visualizations and charts.
Reading durations correctly
Average duration per page is the sum of time on a page divided by its impressions minus its exits. Take a page with 8 impressions, 480 seconds in total and 2 exits. Subtract exits from impressions first: 8 minus 2 is 6, so 480 divided by 6 gives 80 seconds.
Percentage time on site is the time on one page divided by the sum of all page durations, multiplied by 100. A site with a Pricing page at 400 seconds, a Blog page at 200 and a Contact page at 200 gives Pricing a share of 400 divided by 800, or 50 percent.
Dashboards and exports
Custom Platform Analytics dashboards can be shared with other users, groups or roles. Users who hold at least one role can use dashboards, and who can view one depends on the viewing rights it was shared with you. Adding a Usage Insights data source to a visualization requires the admin, analytics_admin or analytics_viewer role, so a channel role such as portal_analytics_viewer does not on its own meet that requirement. For the general dashboard concept, see dashboards explained, and for sharing a dashboard, see sharing dashboards and permissions.
Lists in the Data Foundation menu, including user and session lists, export to a file wherever the download icon appears. For integration with an enterprise analytics platform, a bulk export through the REST API is available as a ServiceNow Store application. For the export steps on a list, see exporting list data in ServiceNow.
Which users count toward the active-user figure in ServiceNow subscription details, and why can a 90-day inactivity report give a different answer?
As of November 2026, the active-user figure in ServiceNow subscription details counts users with a login in the preceding 365 days, leaving out web-service-access-only users and users with an empty User ID. A 90-day inactivity report applies its own shorter window, so users last seen 91 to 365 days ago count toward the platform figure but show as inactive.
Which users the platform counts
As of November 2026, the figure is a filtered count, not a headcount of everyone with a login. A user is counted when they have logged in within the preceding 365 days and do not fall into one of two excluded groups: accounts whose only access is through web services, and records with an empty User ID.
Why the 90-day report disagrees
The two figures run on different clocks. A 90-day report treats anyone quiet for more than 90 days as inactive. The platform keeps a user in the count until 365 days have passed since their last login. Anyone last seen between day 91 and day 365 therefore looks idle in the report and still counts toward the platform figure. That band is the first place to look in the reconciliation.
Keep the two numbers apart in the renewal file. The platform figure answers how many users it counts for the subscription. The 90-day report answers who has been quiet recently. Neither one tells you what the agreement requires.
Reconciling the two numbers
- Record the active-user count, the subscription name and the date you pulled it.
- Run the 90-day report on the same day and export its user list.
- Mark web-service-only accounts and empty-ID records in a separate column, then remove them from the comparison.
- Sort what remains into two bands: last login 91 to 365 days ago, and last login more than 365 days ago.
- For each user in the first band, check roles and group memberships. As of November 2026, automatic allocation of user-based subscriptions uses user and group roles, so a job title is a weak guide to who needs the seat.
What to check before changing a license count
A headline active count is a starting point, not a decision. Look at the allocation history to see whether the count moved because of a bulk role change or an import. Review custom-table tracking and bundled-item information alongside it, because subscription details include both and the headline total does not show them. Then confirm in the agreement whether any surplus changes the bill. The platform view shows usage; the commercial outcome is set elsewhere.
Frequently asked questions
Which role do I need to open Usage Insights?
Any Usage Insights viewer role opens the application through All, then Platform Analytics, then Usage Insights. Viewing page analytics in the Data Foundation menu requires the admin role.
Why does a filtered page show no data?
Additional filters combine with the default filters using AND. If no record meets both conditions, the visualizations come back empty. Widen the date range or remove one condition.
Why are user figures missing for one country?
When a country’s tracking consent policy is set to Disabled, user metrics are not tracked for that country, although aggregate data collection continues.
How do I separate visits to pages that share one identifier?
Filter by the page’s properties, such as the article title or category, in the filter bar, the Pages menu or an advanced filter.
Why does a new user property filter not show results yet?
The filter appears at once, but the data needs 24 to 48 hours to synchronize with it.