The AI Control Tower Home page is the starting point for governing AI assets in ServiceNow. It groups recommendations, which ask you to act, with AI insights, which explain the numbers. Your role shapes which recommendations appear and in what order, and the value charts count managed AI assets within the period you select.
What the Home page shows and who sees it
The Home page gives one view of the AI portfolio: top priority actions, inventory composition, governance posture, regulatory risk, realized value and outstanding tasks. The AI steward role and the product owner role (AI asset owner) carry the governance and asset work in AI Control Tower. The AI Control Tower Workspace user role gives access to the AI Control Tower home page.
The Managed by field on each AI system record sets which systems count toward your views.
| Role | Scope | Recommendations ranked around |
|---|---|---|
| AI steward | AI systems across the instance | Inventory signal and governance across the portfolio |
| Product owner | AI systems that list you in Managed by | Productivity for the assets you own |
Workspace administrators configure these widgets for all users on the instance.
Recommendations: the action items
A recommendation is an action item that AI Control Tower has identified as worth attention. It names the condition detected, the business outcome it supports, and how to resolve it. The list is selective, so the tool shows the findings that rank highest for you.
Recommendations surface in four places:
| Location | What it shows |
|---|---|
| Home page, top recommendations | Recommendations across your portfolio, with a link to the full list in Activity Center |
| Risk and Compliance tab, under Govern | Top recommendations, plus stalled lifecycle tasks and significant issues |
| Activity Center, Recommendations view | The full list, filterable by category, priority, confidence and outcome |
| Overview tab of an asset record, Needs attention | The recommendations that apply to that one asset |
Use Activity Center for volume work or one category such as Security. Use the asset view when you are already on one system.
Recommendations from AI Agent Advisor
When AI Agent Advisor is installed alongside AI Admin Center, its top automation opportunities also appear here as recommendations, ranked by projected return on investment. The default cap is 10. An administrator can change it with the property sn_aict_genai.aaa_automation_opportunities_limit.
The connection needs no setup beyond installing both applications. AI Agent Advisor must also complete at least one mining run before any opportunity appears. Selecting one opens its Automation details page in AI Admin Center. If AI Admin Center is not installed, these recommendations do not appear.
The list refreshes daily. An opportunity still in the top group the next day updates its existing recommendation rather than duplicating it. An opportunity that drops out of the top group, or no longer exists in AI Admin Center, is removed.
AI insights: context that asks nothing of you
An AI insight is a contextual fact added to a dashboard to give a fuller reading of the data. It appears as a short line of text beside the figures it explains, such as a total of productivity gains over the last 30 days. Insights appear in widgets on the Home, Value, Risk and Compliance and Security pages, and on other AI Control Tower dashboards.
| Item | Asks you to act? | Where it appears | What to do |
|---|---|---|---|
| Recommendation | Yes | Home page, Activity Center, asset record | Resolve, mark Complete, or delete |
| AI insight | No | Beside a dashboard widget’s data | Read it; if linked to a supervised agent, select Manage with AI to go deeper |
How recommendations are ranked
The Home page shows a ranked selection of the conditions the tool detects. Four factors set the order.
- Role. An AI steward and a product owner see different recommendations in a different order. A product owner sees productivity items for their own assets first. An AI steward sees inventory-signal and governance items first.
- Severity. Each item is 1-Critical, 2-High, 3-Medium or 4-Low. When other factors are equal, higher severity ranks higher.
- Confidence. Each item is Low, Medium or High, reflecting how certain the tool is that the condition is accurate. At equal severity, high confidence ranks above low.
- Age. Items lose prominence the longer no one acts on them, so an old issue does not hold the top of the list indefinitely.
In Activity Center, the Refine list panel lets you override the default ranking by priority, confidence, category or outcome.
Each recommendation also carries an outcome tag that names the business goal it supports:
| Outcome | Typical items |
|---|---|
| Drive AI productivity | Scaling high-performing assets, or retiring underused ones |
| Improve AI governance | Completing lifecycle tasks, enforcing policy across managed assets |
| Improve inventory signal | Filling in missing asset descriptions, reviewing newly discovered assets |
| Monitor security | Reviewing high-severity security events, addressing agent output deviation |
| Monitor risk and compliance | Overdue risk assessments, non-compliant controls |
Resolving a recommendation
Each recommendation comes with a primary resolution, which the tool selects as the efficient path.
- Automate with Otto. An unsupervised agent runs the steps after you confirm. The status moves to In progress and then Complete. It suits routine work, such as populating a missing asset description.
- Manage with Otto. A supervised agent opens a conversation in the AI Control Tower chat and proposes actions. You accept, refine or reject each one. It suits items that need judgement, such as checking the evidence behind a security threat.
- Open. The tool takes you to the record, page or workflow where the change is made, such as an onboarding playbook.
The Actions menu offers View details, Complete and Delete. Complete resolves the item without running the primary resolution, which is right when you fixed the problem another way. Delete removes the item, but the same condition can raise it again.
View details opens a side panel. The Focused view shows status, the steps taken or planned, and an estimated time to finish, which suits a running agent. The Details view shows the full reasoning, the data sources and the history of earlier runs.
Status values are Not started, In progress, Complete (removed from the list), Failed (the agent could not finish, or finished some targeted assets; retry or resolve by hand) and Cancelled. You can mark any item Complete or delete it from its card, whatever its status.
Value and engagement charts
To open value figures, go to All, then AI Control Tower, then Home, and choose Insights, then Value. Pick a date range. The change figure for each AI system compares the chosen period with the period of the same length before it.
Charts count managed AI assets within the selected period. Assets that are not managed are left out, so a chart can show fewer systems than your full inventory. Select a chart to open the detail view and see the systems behind it.
Engagement results appear on the Engagement tab. The ServiceNow AI tab limits results to ServiceNow AI systems, with Value, Engagement and Creator skills views.
Product owners can review value and engagement, map AI systems to value templates, and review cost output for the vendors behind their systems. Adding costs for a vendor that has no direct integration requires the AI steward role.
Lifecycle tasks in the Home page widget
Lifecycle tasks are not recommendations. A lifecycle task is governance work that a playbook generates and assigns to an AI steward, an asset owner or another reviewer. Each one maps to a playbook step that needs human judgement, such as assessing risk, confirming regulatory conformity or gathering information for a review.
Playbooks generate tasks in the Onboard and Retire stages. The Maintain stage does not run a playbook and tracks change requests instead. In the Assess activity of the Onboarding playbook, for example, you might see an impact assessment task, a legal collaboration task, a security clearance collaboration task and an architecture review task. The asset cannot move to the next activity or stage until the required tasks for the current activity are complete.
Tasks appear in three places:
- The Home page widget. Tasks assigned to you show on the Assigned to you tab, and unassigned tasks show on the Unassigned tab.
- The Lifecycle tasks sub-tab in Activity Center, under the Team, Assigned to you and Unassigned views.
- The Lifecycle tab on the asset record, where the playbook visualization shows where each task sits in the lifecycle.
The updated playbooks record each task as created, errored with a message, or skipped, in one overview. A task that becomes overdue can also generate a recommendation. Whether approval playbooks start automatically depends on the Automatically trigger playbooks setting in Builder controls. When that setting is inactive, an asset manager starts the playbook by hand from the asset record.
Is AI Control Tower now called Super Intelligence Control Tower, and which Brazil governance capabilities are not yet generally available?
Yes. Super Intelligence Control Tower is the new name for AI Control Tower in the Brazil family, which reached general availability on 5 November 2026. As of November 2026, AI Passport, shadow-AI and cost-management capabilities were still described as expected later in Q4 2026, so they should not be treated as generally available yet.
What the new name does and does not change
The rename changes the label on the product. It does not tell you which parts of the product your instance can use. Check the name, the status of each feature and the entitlement behind it as three separate questions.
As of November 2026, watching external enterprise AI agents needs the enterprise-AI SKU. A team that plans to watch agents outside ServiceNow has to confirm that SKU before scoping the work. The common failure is agreeing the scope first and checking the SKU afterwards, which usually forces a cut late in the project.
Which Brazil governance capabilities are still expected later in Q4 2026
As of November 2026, three Control Tower governance areas are still described as expected later in Q4 2026:
- AI Passport.
- Shadow-AI capabilities, listed alongside AI Passport.
- Cost-management capabilities, grouped with the other two.
As of November 2026, some AI items are marked Controlled Availability rather than generally available. Examples outside the governance set are the AIOps AI Specialist, which is also Prime, and Productivity Assistants for HR, which list HRSD Advanced or Prime. A rollout plan should not assume a Controlled Availability item is generally available.
How to confirm status on your own instance
- Confirm the instance runs the Brazil family, which reached general availability on 5 November 2026. Do not assume an earlier family carries the new name.
- Record each Control Tower item as generally available, Controlled Availability or expected later, with the date you checked.
- Check the entitlement for each item, starting with the enterprise-AI SKU for external agents.
- Check the tier each item lists, such as Prime or Advanced, against the tier you hold.
- Check which roles each item needs and whether your own role is among them.
What to request in writing before a commitment
- A status for each governance capability, with the date it was confirmed.
- The SKU or tier each capability needs, listed apart from the base platform.
- For AI Passport, shadow-AI and cost management, the general availability date and whether it applies to your tier.
- The manual process that covers each gap until the capability is generally available.
Naming changes to check in older material
As of November 2026, the product-facing Now Assist name is moving to ServiceNow Otto in the Brazil family. A new name does not settle which Otto capabilities a given tier includes, so check which family a document describes before copying its feature list.
Frequently asked questions
Why can’t I open AI Control Tower?
The AI Control Tower Workspace user role gives access to the AI Control Tower home page. The AI steward role and the product owner role add the governance and asset work.
What is the difference between a recommendation and an AI insight?
A recommendation is an action item with a status and a Complete option. An AI insight is a line of context beside a chart and does not ask you to act.
Why does a chart show fewer AI systems than I manage?
Charts count managed AI assets within the selected period. Assets that are not managed are left out of the calculation.
What does Manage with Otto do?
It opens a supervised agent conversation in which the agent proposes actions, and you accept, refine or reject each one.
Why did a recommendation I deleted come back?
The tool detected the same condition again. If you fixed the problem another way, mark the item Complete instead of deleting it.