AI search mobile capabilities in ServiceNow let Now Mobile users find knowledge, services, and people, then continue with their work. AI Search supports query suggestions, typo correction, synonyms, category filters, and actionable result cards. A successful setup connects the intended search profile with the mobile result configurations users need.
Choose the mobile search experience around the task
Start with what someone needs to accomplish on a phone. Finding instructions, locating a service to request, and finding a colleague are different search journeys. AI Search uses knowledge articles, catalog items for services, and user data sources for people. These categories give a starting point for deciding what the mobile search field should cover.
Now Mobile supports AI Search and Zing within applet launchers. Zing also uses data sources outside this AI Search grouping, including user tasks and requests. If a requirement includes searching existing requests, identify that requirement before replacing an established search experience. A result missing from the wrong engine is a design issue before it becomes a relevance issue.
A single search field cannot run AI Search and Zing simultaneously. Individual applet launchers can use different engines. Plan the engine for each launcher and describe its purpose to testers. For example, separate finding a service from finding a request already submitted. Do not assume switching engines preserves the same result coverage.
Check the configuration against your instance and release before applying the following Brazil setup sequence. Record the current search engine, profile, and item configurations so the change has a clear starting point.
Set the search engine and mobile profile
The configuration procedure requires the admin role. Work in a scoped application that permits adding new item configurations. For the AI Search capability to search people and customers, the Employee Center Pro plugin, com.snc.employee_center_pro, must be installed; activation requires a subscription. Resolve that prerequisite before treating absent people results as a search tuning problem.
- In the web-based UI, enter sys_sg_global_search.list in the filter navigator.
- Open Homepage Search – Catalog, Knowledge, People. Select click here at the top to edit the record.
- Use the reference lookup icon in Search Application Configuration, then select Open Record to open the Search Context Configuration form.
- Set Search Engine to AI Search.
- Use the information icon in Search Profile and select NowMobile Default Search.
- Select Yes in the confirmation message. Open the form header and select Save.
Keep the search profile decision separate from the visual presentation of results. Selecting the engine and profile is one part of the work; the catalog, knowledge, and people item configurations below complete the mobile setup. If the search returns content but displays it poorly, inspect those configurations before changing query behavior.
Replace catalog and knowledge result configurations
Continue as an admin with the mobile global search configuration. The setup replaces specific existing item configurations with versions intended for AI Search. Follow the record names carefully, especially where similarly named knowledge records appear together.
Configure the catalog main item
- Reopen sys_sg_global_search.list and select Homepage Search – Catalog, Knowledge, People.
- In the Catalog Item Main Item row, right-click the information icon and select Open Link in New Tab.
- Select Delete at the top right, then confirm with Delete.
- In Global Search M2M Item Configurations, select New.
- Use the reference lookup in Item Configuration. Search for and select Catalog Item Search Result Main Item, then select Submit.
Configure the knowledge main item
- In Global Search M2M Item Configurations, select Knowledge article search main item and Knowledge article search main item (viewcount1).
- Select Actions on selected rows, choose Delete, and confirm with Delete.
- Select New in the related list and use the Item Configuration reference lookup.
- Search for and select Knowledge AIS Search Main Item, then select Submit.
Check the resulting related list against the intended replacements. A sensible verification record names what was removed and what was added. This makes an incomplete configuration easier to distinguish from a missing article or catalog item during testing. Keep deletion steps limited to the named records in this procedure.
Enable the people card presentation
The admin setup also activates the view configuration for people-based records. Enter sys_sg_master_item.list in the filter navigator. In the Name search bar, find People Search Main Item. Select its information icon, then Open Record. In the Item Configuration form, select Use card, open the menu icon, and select Save.
Test the people journey separately from catalog and knowledge. Choose a person that the test user expects to locate, search by a recognizable term, and inspect the returned presentation. Record whether the problem is absence of a result, an unexpected match, or the card display. Those observations point to different follow-up work.
For help planning this work, see ServiceNow implementation.
Check AI search mobile behavior from query to action
Build a short acceptance checklist around actual employee language. Use separate examples for a knowledge answer, a service, and a person. Write the expected destination before running the search so a plausible but unrelated result does not become an accidental pass.
- Query entry: Enter part of a phrase and inspect auto-complete suggestions. Judge whether the suggestions help express the intended question.
- Search starting points: Check recent and popular searches. Recent searches reflect the user’s own history; popular searches reflect common queries across the instance.
- Typing mistakes: Try a misspelling of a term represented in indexed content. AI Search bases typo correction on that content.
- Vocabulary: Try a term employees use alongside an alternative expression for the same need. Synonym handling expands the language considered in a search.
- Result narrowing: Use navigation tab filters to inspect the relevant category instead of judging the combined result list alone.
- Next action: Where a Genius result card provides an action, test the action as well as the answer.
For query-entry investigation, see search suggestions and autocomplete rules. Keep a record of the text entered, suggestion selected, category inspected, and result opened. That sequence is more informative than reporting that mobile search seems inaccurate.
Genius result cards can present relevant answers with actions such as making a call, sending an email, or adding to a shopping basket. Treat these as supported examples, not a checklist of buttons that must appear on each card. Acceptance should follow the action your configured experience actually provides.
Diagnose gaps without mixing unrelated changes
When a result is missing, first classify the expected content. Is it a knowledge article, a service, a person, or a task or request expected from a different search design? Then confirm which launcher and search field the tester used. This avoids spending time tuning an experience that was never intended to retrieve the requested category.
For content availability work, use indexed source setup and reindexing as the next investigation. For a vocabulary mismatch, review search profiles, synonyms, and stop words. Keep these investigations tied to a reproducible query rather than making several changes together.
Assign an owner to each unresolved example before handover. A content availability issue, a result presentation issue, and a query wording issue need different follow-up decisions. Preserve the original test wording so later comparisons remain meaningful.
Repeat the original test after a change and record whether the expected result became available, moved within the results, or displayed differently. These are separate outcomes. Keep the mobile configuration record names alongside the test evidence so another administrator can reproduce the path from search entry to completed action.
For example, a tester looking for equipment guidance may find a knowledge article that answers the question, while another tester needs a catalog service to request equipment. Write both outcomes into the test plan. A matching word in a title does not establish that the result supports the intended task.
During review, ask the tester to explain what they expected before showing them the configured result. Capture where they hesitated: forming the query, choosing a category, understanding the card, or continuing to the next step. This gives the administrator a specific part of the mobile journey to examine.
Questions to settle before mobile search handover
What should a user report when a card opens the wrong destination?
Ask for the query, selected result, and intended destination. Include the category and the action selected, if present. This distinguishes a correct answer with an unsuitable next step from an incorrect search match.
How should a team choose its first test queries?
Collect examples from the people who will use the launcher. Include a short phrase, a fuller question, and a term that could refer to more than one category. Use a stated expected outcome for each example.
Should acceptance testing include someone new to the search experience?
Yes. As a testing recommendation, include a user without an established search routine alongside a returning user. Their observations help separate discoverability problems from expectations shaped by previous use.
What belongs in the administrator handover?
Include the launcher purpose, selected engine and profile, changed item configurations, and reproducible test cases. Record unresolved failures with their expected outcomes so later work starts with evidence instead of a broad request to improve search.