Assessment metrics are the traits and values that an assessment uses to score a set of records. In the Assessments application, each metric sits inside a metric category, carries a numeric weight, and either asks a questionnaire question or runs a database script. This page explains how the pieces fit together and the order to set them up in.
How the terms fit together
Assessment metrics make sense inside a short chain of records. A metric type sets the group of records to measure. Its assessable records are the individual items in that group. Each assessable record is judged through categories, which are themes, and each category holds metrics, which are the individual traits or values.
| Term | What it holds | Example |
|---|---|---|
| Metric type | The set of records to evaluate | Vendors, projects or employees |
| Assessable record | One source record linked to a metric type | The company record for a vendor |
| Metric category | A theme for judging assessable records, with a weight | Support Rating for vendors |
| Metric | One trait or value inside a category | Quality of product documentation |
| Metric definition | One answer option for a Choice or Likert Scale metric | One point on a satisfaction scale |
One source record can produce more than one assessable record. A company record that meets the conditions of two metric types becomes two assessable records, and each is evaluated with its own categories and metrics.
Set up the metric type and its assessable records
Go to Assessments > Metric Definition > Types, click New, and complete the form. Name, Scale factor and Table are required. The scale factor is the best possible score, and all results for the type are scaled to it. Ten is generally a good value. The field locks once you save, so settle it first.
The Table field names the source table, and the condition builder narrows which of its records qualify. With no condition, all records in the table qualify. Click Generate Assessable Records to create the first set. After that, a business rule creates an assessable record whenever a matching record is added. If you change the table or conditions later, click Generate Assessable Records again.
Smaller settings are easy to skip:
- Assessment duration defaults to 14 days and sets the due date on each assessment instance.
- Notify manager if overdue emails a person’s manager when a questionnaire is missed.
- Active turns generation off and stops users from taking existing assessments. Clear it to pause a type.
- Filter field, Filter condition and Default matrix filter control the choices on decision matrixes and scorecards. After you change the table or filter condition, refresh the default matrix filter, or the system picks the first available choice on save.
For planning a larger assessment programme, see the ServiceNow assessments readiness page on this site.
Group metrics into categories and weight them
A metric category is a theme. For a vendor type, Support Rating holds metrics about the quality of a vendor’s customer support. Create categories after the metric type has generated its assessable records, from Assessments > Metric Definition > Categories. Each category and each metric needs a weight, a number that sets how much it counts against its neighbours. Higher numbers count for more, and the default is 10.
The guidance is to choose a small range and keep to it. A 1 to 10 scale is usually appropriate, and the same scale for categories and metrics keeps the numbers easy to remember.
| Weighting choice | Effect on results |
|---|---|
| The same weight on all categories and metrics | Weighting is effectively switched off |
| A 1 to 10 scale on categories and metrics | A small, easy-to-compare range |
| Increasing the maximum weight value | Changes all related result calculations |
Assessable records must be associated with a category before its metrics can evaluate them. You manage which assessable records a category evaluates by adding or removing those associations. Deleting a category also deletes its category users and stakeholders.
Define each metric as a question or a script
A metric’s Method decides how its value is collected. Assessment is the non-scripted method, so the metric becomes a questionnaire question. Script is the scripted method, which runs code that queries the database for an objective value. The method also limits the data types you can pick.
| Data type | Assessment method | Script method |
|---|---|---|
| Duration | No | Yes |
| Number and Percentage | Yes | Yes |
| Attachment, Checkbox, Choice, Date, Date/Time, Likert Scale, String, Template and Yes/No | Yes | No |
In a scripted metric, the Min and Max fields set the range of its scaled value. The Scale definition then sets the good direction. High, the default, means larger scaled numbers are better. Low suits a measure such as an incident count.
- Mandatory stops a questionnaire being submitted until the respondent gives valid answers.
- Allow not applicable adds a Not Applicable option, and those responses are left out of result calculations.
- Order sets position within a category section, smallest first. The default is 100.
- Randomize answers can reduce bias from option order. It suits options with no natural sequence.
Use Depends on and Displayed when to build a follow-up question. Circular dependencies are blocked. A dependency also locks some fields: the category cannot change while Depends on is set, and the data type cannot change while another metric depends on this one.
Answer definitions for Choice and Likert Scale metrics
A Choice or Likert Scale metric needs metric definitions, because each definition becomes one answer option. For a question such as how easy the vendor’s portal is to use, three definitions could be Very difficult, Neutral and Very easy. Each definition has a Display text and a numeric Value of zero or more, and respondents see the options ordered from lowest value to highest. Avoid giving two definitions the same value, since results would be ambiguous.
The step that is easy to miss is the order of operations. Reopen the Assessment Metric form after you submit it and add the definitions. If a questionnaire goes out while a Choice or Likert question has no options, recipients cannot answer it, and a mandatory question stops the whole questionnaire from being submitted.
Protect results when the table or conditions change
By default, the system keeps assessable records that no longer match a type’s table or conditions. Ticking Enforce condition changes that, but nothing is deleted until you click Generate Assessable Records with the box ticked. Repeat that click for each later clean-up. Deleting an assessable record also deletes its stakeholders.
Deleting a whole metric type runs in a fixed order. Delete the metric and category results, then the assessment instances (questions first), then the assessment groups, then the type. The type’s deletion removes its scheduled job, business rule, assessable records, categories, category users, stakeholders, metrics, definitions and decision matrixes.
Test on demand, then move to scheduled
Test first. An on-demand assessment does not use pre-configured stakeholders, so you can check the questionnaire before setting up the people side. Set the schedule type to On demand, generate the assessable records, create categories and metrics, publish, run an on-demand assessment, and review the result in a scorecard or decision matrix.
When the test reads correctly, change the schedule type to Scheduled, create category users, link them to records as stakeholders, and set a schedule or generate assessments manually. The Scheduled job and Business rule fields on the metric type are admin only, and administrators configure the recurring generation schedule. Each switch back to Scheduled creates a new job, and the earlier schedule is not saved.
The Roles field on a metric type gives extra users read access to the type, its assessable records and its scorecards. The Vendor metric type, for example, grants read access to users with the vendor_manager role. Users with those roles cannot open the Assessments modules unless they are also assessment administrators. For how roles control access to records, see the access control list explainer. Building the questionnaire layout is a separate step, covered in the survey designer guide on this site.
Reading and sharing results
A scorecard shows one assessable record and compares it with others. For the wider reporting setup, see the reporting and dashboards page. A decision matrix plots two axes across several records. A bubble chart keeps one axis per category and sizes each bubble by the scores in a third category. To move a metric type between instances, right-click it under Assessments > Metric Definition > Types and choose Export Assessment. The result is one XML file with the type, its records, categories, metrics, definitions, category users, stakeholders and decision matrixes. Result data is not included. For the wider picture of moving configuration between instances, see the update sets and release management page.
Frequently asked questions
What is the difference between a metric type and a metric category?
A metric type defines which records you assess, such as vendors. A metric category is a theme used to judge those records, such as Support Rating, and each category holds its own metrics.
Can one record be assessed by two metric types?
Yes. A source record that matches the conditions of two types produces two assessable records, each evaluated with the categories attached to its own type.
Why can respondents not submit my questionnaire?
Check for a mandatory question without a valid answer, and for a Choice or Likert Scale question with no metric definitions. Add the definitions by reopening the Assessment Metric form.
Does switching the schedule type keep my schedule?
No. Changing from Scheduled to On demand deletes the scheduled job. Changing back creates a new job, and the earlier schedule is not restored.