OBLYTECH Logo
OBLYTECH Logo

Survey distribution and recipients in ServiceNow

Survey distribution in ServiceNow reaches people by invitation, by link, through a navigation module, by email, through a chat, or inside an Outlook message. Recipients come from survey users, recipients lists, or both. This page covers each route and the settings that decide who sees a survey.

Survey distribution methods at a glance

Start by asking whether the person needs a message pushed to them, and whether the survey needs a named audience or an open link.

Route Recipient gets Reaches
Send Invitations An instance per listed survey user, with email if set Survey users and recipients lists
Assign Survey An instance per selected user Chosen users, not saved as survey users
General URL A link that opens the survey for eligible, signed-in users Anyone eligible with the link
Instance URL A link tied to one instance The assigned user, signed in as them
Survey module A menu entry that creates or opens an instance Users who see the entry
Outlook embed Questions answered inside the email Recipients of the Survey Invitation
Connect chat A survey link shown after an agent ends the chat The user who chatted with that queue

Build a recipients list

A recipients list is a reusable target group, useful when one audience will receive several surveys. Lists live under All > Survey > Administration > Recipients Lists.

Choose the list type and method

The Type field offers Contacts or Internal Users. Internal Users points the list at the user table, shown as User [sys_user]. The Method field offers Upload File, for a fixed group held in a spreadsheet, or Dynamic Condition, for a group defined by a rule. The State field reads New until the list is generated, In Progress while a very large list is being built, and Complete when it is ready.

Upload a file or write a condition

For Upload File, download the Excel template for your type. Accounts use sys_id and account number columns. Contacts, consumers and internal users use sys_id and email columns. Keep the layout intact. On submit, the platform validates the file and lists valid and invalid records, so check the invalid ones.

For Dynamic Condition, write a script or use the condition builder. The Table field follows your Type, and the User Field names the table field that points to users. Conditions combine a field, an operator and a value, joined with AND or OR.

Attach recipients to a survey

Attach lists once the survey definition exists. If you are still building it, Survey Designer guide on building and publishing a survey covers that stage first.

From the definition under All > Survey > View Surveys, use the Survey Recipients Lists related list: choose New, select the list and submit. In Survey Designer, open the Availability tab, set Accessible By to Specific users, pick the list under Add recipients lists, and choose Save and Publish to send the survey to those users.

Send Invitations sends to the survey users and to each attached recipients list, and it is available when at least one list or survey user exists. A person in both places receives the invite once.

Survey users, groups and schedule periods

When a survey lists specific users, it is restricted to them unless an administrator assigns it to someone else.

To designate users one at a time, open the definition (it needs at least one category), choose New in the Survey Users related list, select a user and submit. For many users at once, use the Survey Category form.

Group users with survey user groups

A survey user group is a group whose Type is set to survey. Any user group can be assigned to a survey. Create one under All > Survey > Administration > User Groups, then add members through the Group Members related list.

Check the default Survey Creators group before adding anyone. Its members receive the survey_creator role, which lets them create surveys, quizzes or assessments and view the ones they created.

What designating a user does not do

Designating a user does not create an instance by itself. The system generates one automatically when the schedule period is Daily, Weekly, Monthly or Yearly and the user has no incomplete instance and no instance that has not reached its expiration date. Each new period then gives each survey user a fresh instance.

If the survey has trigger conditions, assign users through the Trigger Conditions form rather than adding survey users directly.

Survey URLs and access links

A survey URL gives a link to the questionnaire. The general URL lets any eligible signed-in user open it; an instance URL is tied to one assigned user. There are two kinds.

The general URL

Open a survey definition under All > Survey > View Surveys and click View Survey URL. That link is shown when the definition is Active. The Email button, which sends the link, is shown for a published public survey.

When someone opens the link, the system checks they are signed in and looks for an instance assigned to them. If several instances are active, meaning Ready to take or In progress, the one with the earliest due date opens. If none exists, the system creates one and opens the questionnaire.

The instance URL and survey states

An instance URL is tied to one assigned user, who must be signed in as that user. What opens depends on the instance state.

Instance state What opens
Ready to take The questionnaire, with nothing saved yet
In progress The questionnaire with saved responses
Complete A new instance if the schedule period is No Limit or has expired; otherwise an error

A URL for an unpublished or deactivated survey shows an error. If survey users are attached, the URL is restricted to them, so test it after you change the audience.

Stop the second email

Sending the general link can produce two messages. When the user clicks it and an instance is generated, the default auto-notification sends a second, system-generated email. To stop that second message, open the Survey Invitation notification under All > System Notification > Email > Notifications. In the Who will receive section, clear Send to event creator, which is selected by default.

Email notifications and the Outlook embed

A non-triggered survey is one an administrator creates and assigns. The assigned user gets an email whose link opens the survey. A triggered survey is sent when a trigger condition is met, and the condition invokes the base Survey Invitation notification. You do not need to build an event or notification for either. For the wider model behind these messages, see the notification concept page. Its recipient teams and message content can be edited. For how the message itself is put together, see the email template page.

Embed the survey inside the email

An embedded survey lets the recipient answer and submit from the email client without opening a browser tab. The Outlook Actionable Messages plugin (sn_ms_oam) must be active.

Actionable messages work for mail sent from the platform’s own sending address. A custom sender must register a service with Microsoft at Organization scope and enter the provider ID in the sn_ms_oam.outlookactionable.originator property. Verification uses SPF and DKIM, so mail routed through an external provider may not render the card. Default templates cannot be customized, and some Outlook versions do not support actionable messages.

Setup has three steps. Add ${mail_script:include_survey_actionable} to the Message field of the Survey Invitation notification, in the What it will contain tab. On the survey, tick Send notifications and Outlook Actionable Message, and save. Then use Assign Survey.

Question types carry limits. Image Scale and Template questions with images need a single-question survey. Date/Time questions work in Outlook web but not the desktop client. Attachment, Reference and Ranking questions, dependent questions and signatures are not supported.

Modules, chat and retakes

Open a survey from a navigation module

In Core UI, select the edit pencil beside the application menu; in UI15, choose Edit Application Menu. In the Modules related list, choose New, set Link type to Assessment and pick the survey. Do not choose Survey, which is for legacy surveys. Clicking the module creates a new instance, opens an existing one, or shows an error.

Offer a survey after a chat

The Connect Support plugin (com.glide.connect.support) must be active. Go to All > Connect Support > Support Administration > Chat Survey, choose New, and complete the Survey, Type (Connect), Chat queue, Active and Description fields. When an agent in the queue’s assignment group ends a chat, the survey appears in the chat window. For the handoff side of that flow, see the Virtual Agent page on live agent handoff and chat queues.

In the Virtual Agent chat widget the survey URL is not clickable, so the user has to copy and paste it. For the wider Virtual Agent setup, see the Virtual Agent section.

Allow retakes

Add the Allow retake field to the Survey Definition form. Then open the survey under All > Surveys > View Surveys, tick Allow retake and click Update. Recipients can resubmit as often as they like up to the due date. Results are not calculated until the configured duration has passed, and the card stays in the recipient’s queue with a retake button until the due date. For reporting on what is collected, see the reporting and dashboards section.

Frequently asked questions

Can one survey go to a recipients list and to named survey users at once?

Yes. Send Invitations reaches both, and a person in both places receives one invitation.

Does adding someone as a survey user create their survey straight away?

Not by itself. The schedule period must be Daily, Weekly, Monthly or Yearly, and the user must have no incomplete instance.

What happens when someone clicks the general link more than once?

While an instance is active, the link opens the one with the earliest due date rather than creating another.

Why does a survey URL show an error?

The survey may be unpublished or deactivated. A completed instance also shows an error when its schedule period still restricts a new attempt.