OBLYTECH Logo
OBLYTECH Logo

Add a Live Feed UI action on a table

To add a Live Feed UI action on a table, open System Definition > UI Actions with the ui_action_admin or admin role. Open an existing Live Feed action, select the destination in Table, then right-click the header and choose Insert. Repeat for the remaining Live Feed actions so users can follow records.

Prepare the table and the Live Feed actions

Start with a clear record-following requirement: which table should support Live Feed, and where will people use the action? Write down the table name before opening a UI action. A similar display name is a reason to pause and verify the selection, especially when several applications have related record types.

The role required for adding these table actions is ui_action_admin or admin. Treat that as the configuration requirement for this procedure. It does not establish which records another user may access or what feed information that user should see. Plan a separate check with a representative user after creating the copies.

Use an existing Live Feed action as the starting point. Follow on Live Feed is a list UI action that can serve as the first example. Make an inventory of the Live Feed actions you intend to copy, recording the source action and destination table for each. This gives you a way to distinguish a complete configuration from a single successful copy.

The steps here use Brazil behavior; check the labels and resulting behavior on your instance and release. Before making changes, choose a test record and define the expected outcome in plain language: the intended user can follow that record through the chosen interface.

Add a Live Feed UI action on a table

  1. Navigate to System Definition > UI Actions.
  2. Open an existing Live Feed UI action. Begin with Follow on Live Feed if you are checking the list action first.
  3. Set the Table field to the table that needs the action.
  4. Right-click the form header and select Insert. This creates a copy for the selected table.
  5. Repeat the process for the other Live Feed UI actions, checking the destination table before each insertion.

The distinction between changing the Table field and completing the insertion matters. The intended result is a copied action associated with the destination table. After inserting, inspect the resulting record and compare its table with the name in your preparation notes. Record which source action produced that copy.

If you interrupt the work, leave a record of the completed copies before returning to the UI Actions list. Work through the inventory one action at a time and log each completed copy with its source action and destination table, so similarly named entries cannot be mixed up.

Keep the initial change focused on the table association and the copy operation. If you also intend to alter what an action does, review that change separately. Combining a table copy with a behavior change makes it harder to identify why a later test differs from the starting action.

Verify the copied actions in the intended interface

Review configuration and user behavior as separate checks. First, inspect the copied action records and confirm that they target the selected table. Then open the relevant interface with the test record and check whether the expected action is available. An action record in the configuration list is one piece of evidence; a successful user interaction is another.

For the Follow on Live Feed list action, test from the list context rather than treating a record form as an equivalent test. Note the table, record, user, and interface used. If the action appears in one place and not another, those details will help you isolate the difference without making speculative changes.

Check the follow operation with a representative user as well as the person configuring the action. The administrative role used to create a UI action should not become the acceptance test for the audience that needs it. Describe any failure precisely: missing action, unexpected placement, or an outcome that does not meet the record-following requirement.

  • Confirm that the copied record points to the intended table.
  • Compare the completed copies with the planned Live Feed action inventory.
  • Test the interface where the audience will actually work.
  • Record the observed outcome and the user context.

If the project also involves a heavily used task table, keep action acceptance separate from the broader checks in task table performance planning. This helps the review identify whether a concern belongs to record following or to the surrounding table experience.

Check workspace form actions before changing scripts

A table UI action and its presentation in Configurable Workspace involve related configuration. For the ITSM migration, the migration utility maps UI actions (sys_ui_action) to UX form actions (sys_ux_form_action) before it can carry them into Service Operations Workspace. The legacy UI action table is sys_ui_action, while the corresponding workspace form action table is sys_ux_form_action. During migration, a UI action is eligible only when it maps to a UX form action record, so check that mapping before expecting the action in the workspace.

If the Live Feed copy exists but your acceptance target is a workspace, inspect that relationship before rewriting the action. Record whether a corresponding form action exists and whether the expected workspace presentation has been configured. Do not use a successful list test as proof that a workspace form has the same setup.

For adjacent client-side interaction work, see UXF client actions in ServiceNow. Keep the decision tied to the interface requirement: copying an existing table action and designing a client interaction are different pieces of configuration to review.

During migration from ITSM Agent Workspace to Service Operations Workspace for ITSM, the migration utility considers mappings among UI actions, UX form actions, layout items, and layouts. Those relationships matter when an action is present but its grouping differs from what the team expected. A layout provides the container used to group actions.

If the team needs help with the rollout, the ServiceNow implementation service page covers the planning work.

Review migrated layouts when action placement differs

The post-migration review of UI actions and layouts requires admin. It applies after the UI actions and layouts option was selected during migration. Open corresponding records in Service Operations Workspace and ITSM Agent Workspace, then compare the actions and layout. Choose a record from the table whose configuration was migrated.

To review layout order, navigate to All > sys_ux_form_action_layout.list and select the relevant table record. Inspect whether the layout is unified. A unified record does not display the Unify action button; for a record that is not unified, the Unify action option performs the unification. Review that change in the context of the migration before applying it.

After unification, the actions appear under the UX Form Action Layout Items related list. Change their order there when rearranging the target table’s record layout. Keep a record of the desired arrangement so another reviewer can compare the final workspace with the acceptance requirement.

If migration failed, use View migration details on the migration completion page in SOW Admin Center, then the Go to system logs icon. Identify the failed item and step before deciding what to repair. Keep those findings separate from the result of copying the Live Feed table action.

When troubleshooting also involves navigation parameters, use ServiceNow URL parameters as a separate investigation aid. Record an observed navigation issue before changing parameters; it should not obscure whether the table action and workspace mapping are correct.

Questions about the scope of a Live Feed action change

What should a handover include for another administrator?

Include the target table, the source actions used, the resulting copies, and the interface tested. Add the acceptance result for the representative user. This lets the next administrator review the completed change without reconstructing your choices from action names alone.

How should a request covering several tables be organized?

Use a separate inventory and acceptance result for each table. Complete one table’s configuration and test before carrying the same requirement to another. That keeps a partial rollout visible and prevents a successful test on one record type from standing in for the rest.

What is a sensible stopping point when the action is unavailable?

Pause further changes once you have captured the copied action, destination table, user context, and interface where it is missing. Review that evidence before adding another copy. Repeating the insertion without understanding the first result makes the configuration harder to assess.

Should a larger redesign be bundled into the initial change?

Plan the follow requirement as a discrete acceptance item. If the team also wants new interactions or a different workspace arrangement, document those outcomes separately. That gives reviewers a clear result for record following and a separate decision about the wider interface work.