OBLYTECH Logo
OBLYTECH Logo

Core UI Settings for Users

If a user reaches the wrong landing page or cannot open or change a dashboard or report, check Core UI navigation settings and access permissions separately. Identify the experience first, then inspect the login destination, saved preference, role, or sharing setting behind the failed action.

Identify the Core UI experience in ServiceNow

Begin with the screen the user actually needs: a landing page, a dashboard, or a report. Record what happens, which user sees it, and whether another user gets a different result. This separates a navigation problem from a content permission problem before someone changes a shared setting.

Check your instance and release before following these steps. On new Brazil instances and instances migrated to Platform Analytics experience, Data Visualizations replace Core UI Reporting. Core UI Reporting is in maintenance mode, with security fixes rather than feature development. Creating Core UI reports in Brazil requires the property com.snc.par.coreui.report_create.enabled to be true. New instances from Yokohama onward cannot create Core UI interactive filters.

Next Experience can still present a Core UI landing page. Its navigation shell does not, by itself, tell you which reporting tools a user has. For the broader relationship between experiences, start with the guide to UI Builder and workspaces.

Set the landing page and check preference overrides

An administrator with the admin role can configure an instance-wide Core UI landing page for Next Experience. Treat this as a shared navigation decision: choose the destination users need when they begin work, and identify who will test it before changing the default.

  1. Enter sys_properties.list in the filter navigator field.
  2. Find glide.login.home and edit its value.
  3. For Dashboards Overview, use $pa_dashboard.do. For a particular dashboard, use the destination portion beginning with $pa_dashboard.do.
  4. Decode copied entities as needed; replace %24 with $.
  5. Select Update, then log out and log back in to test the result.

If a user still lands somewhere else, check my_home_navigation_page. That user preference takes precedence over glide.login.home. A preference record with no user specified overrides the property for all users. Repeatedly editing the property will not resolve a preference that wins over it.

Keep the previous destination in your change notes. Ask testers to describe the page they reached after a fresh login, rather than whether the change “worked.” If the requested change concerns a portal or workspace experience, use the separate guidance on portal and workspace experience settings to frame that requirement.

Separate Core UI dashboard access from permission to change it

The permissions in this section apply to Core UI dashboards. Platform Analytics dashboards have separate permissions; confirm which dashboard experience the user has before applying these checks. A dashboard being visible does not mean the user can edit it. On Core UI dashboards, users with any role can create dashboards and share dashboards they own with users and groups, subject to administrator restrictions on sharing. Users without a role can view dashboards shared with them, but cannot create or edit dashboards.

For a user who needs to change someone else’s dashboard, check whether it was shared with edit permissions. Users with dashboard_admin or admin can edit and manage users, groups, and roles for any dashboard, and can change its owner. Dashboard deletion is restricted to its owner or users with either of those roles.

Users with pa_admin or pa_power_user can manage users, groups, and roles on dashboards they can edit. Adding Performance Analytics widgets requires pa_power_user, pa_admin, or admin. Do not treat an edit grant as evidence that a person has permission for that separate action.

Record visibility, editing, and sharing as separate requirements. Grant the access needed for the task instead of choosing an administrator role simply because it removes the immediate obstacle.

Understand report options before changing a shared report

The report_user role is required for the Reports module to appear in the application navigator. A person with no role can view reports shared with them. Users with report_user or itil can create reports and view shared reports, but cannot share, edit, or delete reports shared with them.

The report_group role allows management and sharing of reports shared with groups the user belongs to. The report_admin role allows management, sharing, publication, and scheduling across reports, and access to Reports > Administration. Use that administrative route for report administration rather than asking an ordinary report reader to change permissions.

When the goal is a different personal view, copying can be the better request. The copy procedure accepts itil, report_user, report_group, report_global, report_admin, or admin.

  1. Navigate to sys_report.list and select the report.
  2. Select View Report.
  3. Open the arrow beside Save or the Share icon, depending on the permissions presented.
  4. Select Insert and Stay, then modify the resulting copy.

Sharing settings are not copied by Insert and Stay. Check the new report’s audience deliberately. For a team change involving navigation and access together, see ServiceNow implementation.

Make dashboard filters follow the intended reports

A choice list interactive filter narrows report widgets using a choice field, such as Priority. Creating one requires hp_publisher_admin and report_admin. Before adding a filter, agree on the table, field, and reports it should affect. A control that looks right but targets the wrong data will confuse users.

  1. Navigate to All > Performance Analytics Administration > Core UI Artifacts > Interactive Filters.
  2. Inspect an existing filter on the same table and use Other filters on Table under Related Links to check for a suitable filter.
  3. If needed, select New and choose Choice list in Filter based on.
  4. Complete Name, Look up name, UI control type, Table, and Field. Set Default value if required.
  5. Select Submit and add the filter to a dashboard.
  6. For each visualization that should respond, select Edit widget and enable Follow interactive filter.

Give the filter two names with different purposes: Name labels its dashboard widget, while Look up name identifies it in the Add content menu. Leaving the lookup name blank makes that menu use the Name value. Use the lookup name to distinguish filters that people might otherwise confuse when adding dashboard content.

For a filter with several starting selections, choose a control that supports multiple values, such as Select Multiple Input. If more than 50 default values are needed, split them across multiple interactive filters. The same approach applies if the instance displays This is exceeding the GET call limitation.

Test a specific selection and then All. All shows the unfiltered report; data for choices in the Exclusion list remains included in that result. A user’s selection overrides the global default for that user. Automatic application of a default or last selected value is available on responsive dashboards.

Write down which widgets should follow the filter and compare them after a selection. If the requirement instead concerns interactions in a custom experience, continue with UI Builder data resources and event handlers.

Validate what the user can actually see

For Core UI dashboards, test with the intended user’s access: open the dashboard, inspect its widgets, and attempt the permitted editing or sharing action. A dashboard can open while a widget shows an empty placeholder because the user lacks the widget’s required access. List widgets omit records the user cannot access. An aggregate chart and its drilldown list can therefore show different amounts of information.

Performance Analytics widgets require separate attention: dashboard viewers can see those widgets without the widget ACL checks used elsewhere. For real-time scores, the logged-in user’s roles and the facts table ACLs affect the score. Inspect the actual widget type before interpreting a mismatch as a broken setting.

Finish with a small acceptance record covering the reader’s and editor’s results: login destination, dashboard visibility, permitted editing, report copy audience, filter selection, and expected data. This gives the administrator a specific failure to investigate if a later access or configuration change affects the experience.

Questions about less obvious Core UI options

Can a scheduler email a report they cannot manage?

The report_scheduler role permits scheduling email for reports the user can see, including reports they cannot manage. The user also needs another role granting permission to create, edit, and share reports. Include both requirements when reviewing a scheduling request.

Which role changes report field descriptions?

The report_description_admin role permits reading and updating table and field descriptions for reports. It is included in the Table and field description configuration for report plugin, com.glideapp.report.description_config. This is a separate task from changing a report’s chart or audience.

Does saving a personal report as global create a copy?

Saving a personal report as a group or global report changes its security state rather than copying the report. Decide whether the request is to change the existing report’s audience or preserve it and create a separate version before proceeding.

Which report type suits a queue review?

In most cases, a bar report suits comparisons between categories, a time series helps reveal changes across dates, and a list lets the reader inspect individual records. Choose the presentation by the decision the user needs to make.

Can external users view a shared dashboard by default?

When Explicit Roles are activated, Core UI dashboards are internal resources. Users with snc_external cannot view them by default. Include that condition in access troubleshooting when sharing appears correct but an external user still cannot open the dashboard.

What accessibility preferences do agents get in Next Experience workspaces, and how should a pilot test them?

The Zurich release, dated July 2025, adds two accessibility preferences for agents in Next Experience workspaces: one that disables workspace lazy loading so a screen reader gets more consistent output, and one that stops page alerts from auto-dismissing. Treat both as documented options, not proof of accessibility compliance, and test them with agents on your exact release.

Which two preferences are documented

  • Disable workspace lazy loading. Zurich introduces this preference to keep screen-reader output more consistent.
  • Do not auto-dismiss page alerts. Alerts are kept visible rather than removed automatically, which is worth testing with slower readers and assistive technology users.

How to run the pilot

  1. Record the release, the patch level, and whether Next Experience was active by default after the upgrade. In Zurich, Next Experience is active by default on loading or upgrading, so a pilot can begin on an instance where nobody chose it.
  2. Select a test group with at least one agent who uses a screen reader and one who navigates by keyboard only.
  3. Give each tester the same scripted tasks with each preference off, then on, using the same test records so timing and failures can be compared.
  4. For alerts, trigger a page alert during a task, leave the page alone, and check whether the alert is still there when the tester returns.
  5. For lazy loading, move through a long workspace page with a screen reader and note any section that is skipped, repeated or read out of order.
  6. Count every move back to the classic interface, with the task, the page and the reason given.

What automated tests will not cover

For the Brazil release, dated 10 September 2026, the automated test framework does not support UI Builder pages, configurable workspaces or landing pages. Write manual scripts for workspace pages, and do not promise full automated coverage.

What to record during the pilot

  • Accessibility blockers, with the preference state in which each one appeared.
  • Task completion time and task failures for each scripted task.
  • Fallback-to-classic frequency per agent.
  • Weekly administrator effort spent on workspace settings and fixes.

These are working definitions for a pilot, not ServiceNow benchmarks. Agree them with the agents’ team lead before testing starts, so the figures at the end mean the same as the figures at the start.

What to ask for before the pilot starts

  • Release notes for your exact version and patch, listing the accessibility preferences that version exposes.
  • Confirmation of whether each preference is set per user or for the whole instance, and what an agent sees by default.
  • A list of known workspace loading and navigation defects for your patch level, so testers do not report a problem that is already on the list.