OBLYTECH Logo
OBLYTECH Logo

UI Builder Responsive Authoring: Breakpoints and Layouts

Responsive authoring is the UI Builder setting that lets one page take its own layout, styles and visibility at each screen width. Three built-in form factors (desktop, tablet and mobile) come with the setting, and up to three custom breakpoints can be added. Changes made at a larger size carry down to smaller ones.

A layout built for a laptop can turn into a long, cramped column on a phone. Responsive authoring keeps the same page usable at each size without building a separate page for each. For the wider editor, see the UI Builder page explained guide.

The three default form factors and their pixel ranges

The editor opens on the desktop view. The stage switches between sizes using these ranges:

Form factor Width range Role in the cascade
Desktop 1281 px and wider Starting point; its changes reach tablet and mobile
Tablet 1280 px down to 501 px Inherits desktop changes; its own changes reach mobile
Mobile 500 px and narrower Inherits from both larger sizes; its own changes override them

You can also type a pixel width on the stage. The stage snaps to the nearest range, so 850 px displays the tablet form factor. Preview offers the same choices.

Adding custom breakpoints for widths the defaults miss

Custom breakpoints suit devices whose width sits well away from the standard 500 px mobile line. A breakpoint at 360 px, for example, can give small phones their own settings beneath the default mobile form factor. Adding one requires the ui_builder_admin role:

  1. Open a page created from scratch with responsive authoring, or create one.
  2. Select the menu icon beside the three form factor icons.
  3. Select Add breakpoint, type a width in pixels, and select Add.
  4. Select the new icon whenever you want to edit the page at that size.

A custom breakpoint works as a range, not an exact size. A breakpoint at 800 px applies at 800 px and below, so a 750 px screen uses the 800 px settings unless a second breakpoint exists at 750 px. In practice, list the widths from largest to smallest before you start, because each one covers the range beneath it. To edit or delete a custom breakpoint, open the same menu, point to its name, and select the edit or delete icon. The three defaults cannot be edited or removed.

Choosing responsive authoring or reflow for a new page

Responsive authoring applies to pages created from scratch. Existing pages and template-built pages keep the reflow model, a restriction in place since Xanadu Store Release 1. The build step selects responsive authoring by default; choosing to build without it switches the page to reflow.

Reflow stacks the page into a vertical view without losing content or function when a visitor zooms the browser to 400 percent, which helps people with low vision. Responsive authoring gives direct control over each size but asks for deliberate choices at each one. Pick it when the layout must change in specific ways, and reflow when a page can stack without help. Responsive dashboards in the Core UI are a separate subject, covered in the reporting and dashboards guides.

How changes cascade from larger to smaller form factors

A change made at one size carries down to each smaller size. A tablet change reaches mobile, and a later mobile edit overrides the inherited value, so you can refine the smallest size without touching the ones above it. Changes do not travel upward: a tablet adjustment leaves the desktop view as it was.

Changed fields carry a cascade icon for the size where the change was made, which separates customised values from inherited ones.

Setting Can differ by form factor?
Showing or hiding a component Yes
Component configuration Yes
Styles Yes
Column layout options Yes, except Number of columns, Stack columns below (pixels), and the Accessibility options
Controller properties No, they are global to the page

Because controller properties apply across all sizes, set up data bindings once on the desktop view.

Adjusting the layout of a component for a smaller screen

Tabs make a clear example. On the desktop view, add a single column and a Tabs component with three tabs labelled Tab 1, Tab 2 and Tab 3. Tab IDs fill in automatically for added tabs (tab_2, tab_3); type tab_1 yourself for the first tab. Check the tablet view next; the spacing usually holds at that width. At mobile size, the three tabs take more horizontal room than the screen can comfortably give them.

Select Column 1 under Column layout 1, then set its Direction to the row option for the mobile view. The stage updates: tab 1 stays visible and a dropdown appears beside it. In mobile preview, a More menu lists the remaining tabs, while desktop and tablet keep the full tab bar. In practice, shorter labels leave more room for the visible tab, so it is worth trimming them.

Adjusting styles so spacing and headings fit small screens

Take a stylized text component on desktop. Set Margin under Spacing on the Styles tab to Large, and centre the block with Alignment. The tablet view reads well at that setting. At mobile size the block takes a great deal of vertical space, so set Margin back to 0 for the mobile view, then change the HTML tag to H3 on the Configure tab. Afterwards, check the tablet and desktop icons to confirm the change stayed at mobile size.

Pick the tag from the page outline, and use styles for the visual size.

Hiding and showing components by form factor

Take three buttons labelled Tasks, Incidents and Changes. On desktop and tablet they sit in a row; on mobile a dropdown replaces them. Add a single column, three Button components with those labels, a margin of XS on each, and a row direction for the column. Desktop and tablet look right, but at mobile the buttons fill almost the full width.

Add a Dropdown component after the third button, clear its placeholder text, and set its icon to menu-outline. Hide it at desktop and tablet using Component visibility and Hide component on the Configure tab. Then switch to the mobile icon, hide each button with the same option, and clear Hide component on the dropdown.

Two indicators confirm a mobile setting: a mobile icon beside the Hide component option, and a hidden icon on the component in the content tree. In mobile preview, the dropdown shows a menu icon. Its default items are placeholders, so configure them to read Tasks, Incidents and Changes.

Form factor Buttons Dropdown
Desktop Shown in a row Hidden
Tablet Shown in a row Hidden
Mobile Hidden Shown, with the three destinations

Smaller buttons can help the layout, but they still need enough size for a thumb to press reliably. Check the target on a real phone rather than assuming the desktop size translates.

Configuring a list component for small screens

A List component at mobile size, for instance, can show both vertical and horizontal scroll bars. Make these changes on the mobile view.

Section Change at mobile size Result
Columns Number of displayed columns set to 1 Horizontal scroll bar removed
Header Size Small; hide last refresh information; hide list actions Smaller header, no refresh time, no actions icon
Pagination Hide range, row count and rows per page selector Those controls removed; the row count still shows at the top

Changed options carry the mobile cascade icon, so you can confirm that the desktop and tablet lists are unchanged.

Reusing styles with classes and the experience theme

Style classes save repeated styling. They reference CSS, so they apply to any container or component without inline styles. Open the Styles tab on a component, select the menu beside the Style class field, add a class or rule with a name and CSS, select Apply, then pick it from the field, save and preview. This task needs the admin role.

Underneath, UI Builder experiences use the Polaris theme by default. Theme Builder offers a visual way to create and apply Next Experience themes. An admin comfortable with style records and JSON can build a custom theme for typefaces, colours and images such as the banner and logo.

A sequence for building a responsive page

  1. Create the page from scratch with responsive authoring selected.
  2. Design the desktop view first, including layout, content and data bindings.
  3. Add custom breakpoints where a real device width falls outside the defaults.
  4. Adjust tablet, then confirm the desktop view has not changed.
  5. Adjust mobile for layout, styles, configuration and visibility, then preview at each size and at an in-between width.

Frequently asked questions

Can the tablet layout differ from the desktop layout?

Yes. Desktop changes carry down to tablet, and tablet can override them.

Why did a tablet change not appear on desktop?

Changes flow downward. Make a desktop change while the desktop view is open.

Can responsive authoring be turned on for an existing page?

No. Responsive authoring is available only for pages created from scratch. Existing and template-built pages keep reflow, so a new page built from scratch is the route.

Which role is needed?

The ui_builder_admin role covers the breakpoint, layout, style and visibility tasks. Creating a style class requires the admin role.

Next steps

Responsive authoring is a per-size editing layer on top of one page. Start with the desktop view, add just the breakpoints a real device needs, and keep mobile changes small enough to review later. The UI Builder and workspaces hub lists the related guides.