The ServiceNow Upgrade Console brings upgrade preparation, monitoring, history, and skipped record rules into one experience. To handle customization decisions, define a skipped record rule with clear conditions and an action, check its scope, then review the upgrade results. Start with a controlled review of the records you intend to affect.
Choose the ServiceNow Upgrade Console task first
Begin with the question you need to answer. Upgrade History provides records and reports for earlier and recent upgrades. Upgrade Monitor supports scheduling, progress monitoring, and analysis after completion. The Upgrade Skipped Record Rules Editor defines condition-based actions for skipped records, with execution during an upgrade or on demand afterward.
For this workflow, the decision is what should happen to a defined set of customization conflicts. Write that decision before opening the editor: which records belong in scope, what outcome is acceptable, and who will review the result. In most reviews, a rule that assigns work needs a different check from a rule that retains a customization, because assignment moves the decision to someone else.
Menu labels and availability change between ServiceNow releases, so confirm each name on your instance before you apply these steps. For the wider sequence of preparation and acceptance, use the guide to upgrades and release readiness.
Inspect retained customizations before adding rules
Some skipped records may already have been handled by default rules. Starting with Xanadu, default skipped rules retain certain customizations when skipped records are generated as metadata files from specified tables. Check the retained population before deciding that your team needs another rule covering the same work.
The table list includes sys_ui_section, sys_ui_form, sys_ui_form_section, sysevent_email_action, sys_ui_related_list, sys_ui_list, sys_choice, sys_choice_set, sys_report, pa_dashboards, and wf_workflow. For skipped records generated from wf_workflow_version, the default rules set Keep My Modifications (Always Retain). Treat these names as scope details when investigating why a record was retained.
Find automatically retained records in the Skipped Changes Reviewed related list. A comment identifies the related table from which each retained record was generated. Use that information to distinguish default handling from a decision your team still needs to make. Do not infer that a small outstanding review queue means few customization decisions occurred.
As a working practice, record one example of expected retention and one record that still needs a decision. This gives the reviewer a concrete comparison when checking a proposed rule. Keep the business reason alongside the record reference so another reviewer can understand why the customization matters.
Create a rule with a bounded purpose
The admin role is required to create a skipped record rule. Open All > Upgrade Center > Administration > Skipped Record Rules Editor. The list shows the available rules, including inactive sample rules you can activate if you choose to use them.
- Select New to open the Upgrade Skipped Record Rules form.
- Enter a Name that describes the intended decision and record population.
- Review Order, which determines execution order. Its number increments from the last rule order created.
- Check Active. New rules are active by default; make the rule inactive if it should not be used yet.
- Define Conditions for the skipped records you intend to handle.
- Choose an Action and read the explanatory message shown for that selection.
- Add a Comment explaining the conditions, then select Submit.
Conditions apply to skipped records that have not been reviewed. A disposition condition set to something other than skipped records does not work for this purpose. Check that boundary explicitly when a condition appears sensible but does not describe the population the editor can act on.
Before submitting, ask a second reviewer to describe the rule’s scope in ordinary language. If their description differs from yours, refine the conditions or explanation. This is a suggested review control: the aim is to catch a mismatch between the intended business decision and the technical selection before execution.
Choose the action that matches the decision
The Action field offers Keep My Modifications (Always Retain), Revert and Keep Inactive, Assign Skipped Records to User, and Assign Tags to Skipped Records. Preserve those distinctions in the review conversation. Assignment and tagging organize records for handling; retention and reversion express different decisions about customization.
For example, if a reviewer still needs to assess whether a customization should survive, define the routing or tagging need before considering a retention action. Avoid treating a rule as approved merely because its conditions identify the right records. The action must also reflect the decision the responsible owner has authorized.
Use the Comment field to explain why the population belongs together. A concise explanation might describe the business requirement and the evidence reviewers should check. Avoid a comment that simply repeats the rule name. For ownership decisions, connect this review to the upgrade roles and responsibilities.
When the difficult part is agreeing which customizations to retain, use ServiceNow implementation support to frame that discussion around the required behavior, the affected records, and acceptance evidence. Prepare those inputs before asking for help so the review can address a specific decision.
Run deliberately and review the result
Skipped record rules can execute automatically during an upgrade or on demand afterward. The admin role is required for the on-demand procedure. Its navigation is All > Upgrade Center > Administration > Skipped Record Rules Editor. Choose the execution route with attention to how many active rules it will run.
To run a selected rule, open it from the list and select Run Now from the configuration list action items. A progress bar displays execution progress. For the alternative route, select View Latest Upgrade History to open the System Upgrades form, then select Run skipped Record Rules. That route executes all active rules; it does not let you choose individual active rules.
On-demand execution applies to the latest upgrade. Before using the all-active-rules route, review the active list and the upgrade being targeted. Make the choice explicit in your change record: a selected rule and the complete active set are different scopes of work, even when both are started from the editor workflow.
For automatic execution, the Skipped list prediction card in Upgrade Preview shows predicted rule execution. After execution, review the summary in Upgrade Summary within Upgrade Monitor. Skipped record rules and upgrade plans cannot be implemented together in an upgrade, so resolve that choice during planning rather than leaving conflicting expectations for the execution team.
Use a separate acceptance record to compare intended scope, chosen action, observed handling, and follow-up owner. The upgrade testing and acceptance checklist helps connect record handling to the behavior the business needs to accept.
Use history and monitoring for the next handoff
Upgrade Monitor shows ongoing upgrade progress and provides an Upgrade Summary Report after completion. It also supports examining records with conflicts. When an altered record affected by an upgrade produces a skip log record, processing the skipped records list helps reconcile the customized and upgraded versions.
Upgrade History maintains the instance’s upgrade record and provides complete reports for old and recently completed upgrades. Use it to anchor the review to the relevant run. In the handoff, identify the upgrade, what you checked, the unresolved decisions, and the person responsible for the next action.
Record technical completion and business acceptance as two separate entries. A successful run shows that a rule executed; it does not show that the business behavior is right. The acceptance entry should name the behavior that was checked and any exceptions still open, so the next reviewer can continue without rebuilding the original decision.
Questions that arise during console planning
Does production have a different set of console tools?
The Upgrade Console tool set is the same for production and sub-production instances. As a planning practice, identify the intended instance explicitly in review notes so a shared tool name does not cause a mistaken handoff between environments.
What data source does the cloning tool use?
System Clone duplicates an instance database using the latest nightly backup as its source. When planning a rehearsal, note the business data period you need represented and compare it with the proposed clone source before agreeing on test evidence.
Can a clone target run a different version?
The Cloning tool supports cloning to a target running a different version. Treat the source, target, and version combination as explicit planning inputs. Agree on the rehearsal’s purpose before selecting the environment combination.
What does Upgrade Preview contribute before execution?
Upgrade Preview shows how an upgrade to a chosen release would affect your current configuration before you commit to it. Its predicted-changes table lists the records expected to change, and the Skipped list prediction card shows how the rules would act on the skipped records. Use both to build the review agenda and assign an owner to each open decision before the upgrade starts.
Which Australia and Brazil upgrade steps sit outside the upgrade run itself?
Outside the upgrade run, Australia and Brazil add three groups of work: gates checked before the build starts, such as Java versions for Edge Encryption and MID Servers; follow-up tasks after the run, such as updating robot and desktop automation and moving Dynatrace alerts to the Grail connector; and Basic Authentication planning, which is not a Brazil upgrade prerequisite.
Gates to clear before the target build starts
Edge Encryption proxies need Java 21 or later before the Brazil upgrade. A scheduled Edge Encryption upgrade also needs Zurich Patch 13 or Australia Patch 6 or later, and does not work from earlier versions. As of November 2026, MID Servers need at least JRE 17.0.10, and Australia recommends 21.0.7. Several Windows services pointing at one installation folder stop upgraded MID Servers from starting, so check the services before the cutover window opens.
Some gates depend on your starting version or configuration. Service Exchange users should not target the original Australia release, and should wait for Patch 1 because of a known RPS issue. Discovery customizations that call findOrCreateRelationshipType need updating before an affected target version, because that call no longer creates missing relationship types. Replace it with findCIRelationshipType. Upgrades from San Diego or Tokyo to Australia need one conditional property set beforehand: glide.rollback.blacklist.TableParentChange.change set to false, created if absent.
Work to finish after the run
Robot and desktop automation need their installed MSI applications updated, because older robot versions do not work on Australia. Close any current AI Desktop Actions executions and the desktop app before you install the update. Playbooks need Workflow Studio updated from the Store after the upgrade. Kubernetes Visibility Agent deployments in each cluster need updating to the matching agent version after the Store application update.
Dynatrace is the step with a hard consequence: the classic event integration is replaced by the Grail connector, and migration is required to keep receiving alerts. Direct Xanadu or Yokohama to Australia CMDB upgrades also run a named scheduled job that removes CMDB roles from the ITIL roles and adds CUD access to the CMDB Admin and Editor roles. The job must run, but it is not a universal pre-upgrade step, so confirm whether your path needs it before setting the cutover order.
Basic Authentication and access testing
As of November 2026, Basic Authentication is planning work rather than an upgrade gate. Brazil supports a tracking period on the Basic Auth restriction page before allowlist-based enforcement, and it prepares inbound Basic Authentication for future deprecation, pointing customers toward OAuth 2.0, mutual TLS, or federated token-based authentication. Basic Authentication remains supported pending a future release, so the work is to list the integrations that still use it and assign an owner to each one.
Plan security regression testing around six areas: ITSM authentication ACLs, CSM viewer roles, CMDB role inheritance, request-management access, public reports, and custom client scripts that touch read-only fields. Treat these as compatibility points to check, not proof that every customization needs changing.