ServiceNow Audit Management offers a three-step and a two-step route for evidence requests, and the Control tests tab on an engagement shows every control test in one grid. This page explains both evidence routes, the grid, and how control tests are created, with the fields and roles each step uses.
Ways to start an evidence request
Evidence can be requested from three starting points, and the first creates an evidence record while the other two create an evidence request first.
| Starting point | What gets created first |
|---|---|
| An evidence record in the My Evidence module | An evidence record |
| Request Evidence on the related lists of an engagement (Entity, Control, Audit Task, Control Test Issue, Other Issues) | An evidence request, with tasks added afterward |
| The Entity, Control, Control Objective, Control Test, Engagement and Issue tables | An evidence request record, with evidence request tasks added afterward |
For requests from an engagement, open the engagement from Audit, Engagements, My Engagements, select the rows you need, and choose Request Evidence from the Action on selected rows list. Then select Create an evidence request task on the Request evidence page. For the wider policy and evidence picture, see the GRC policy and audit evidence page.
Choosing the three-step or two-step route
The Request evidence form has a Skip collection detail check box, and it sets the route. Leave it clear for the three-step route, which creates an Evidence collection details record as an intermediate step for extra organization and context. Tick it for the two-step route, which skips that record and moves straight to evidence submission. The two-step route suits simpler requests where the collection instructions are minimal.
The Skip collection detail check box switches the request to the two-step route.
| Form element | Three-step (box clear) | Two-step (box ticked) |
|---|---|---|
| Request state after clicking Request | Draft | Work in Progress |
| Evidence collection details related list | Created, with a New button | Not created |
| Context and Evidence collection instructions fields | Shown | Hidden |
| New button on the Evidence related list | Not shown | Shown |
The check box can be changed only while the request is in Draft and has no evidence collection details. Once the request is in Work in Progress it is locked, so choose the route before you click Request. When the box is ticked, the Description field appears so that you can enter the evidence details.
Completing a two-step request
After you tick the box and select Request, the response appears on the Evidence related list. The request’s Details tab shows Skip collection detail selected, the record in Work in Progress, and a work note stating that Skip Collection is enabled. To add evidence, select New on the Evidence related list, which opens the two-step Evidence form.
| Field | What it holds |
|---|---|
| Name | The name of the request |
| Type | Defaults to Audit |
| Request reason | Why the evidence is requested |
| Due date | The expected date of evidence submission |
| Context | The context for the evidence |
| Assignment group | The group assigned to the request |
| Assigned to | The user assigned to the request |
| Evidence collection instructions | Evidence details and collection instructions; appears only on this form in the two-step route |
Select Request on this form to create the response. Because the instructions field lives here in the two-step route, the assignee’s instructions sit on this form rather than on the request record. This is the streamlined path, and it needs no Evidence collection details record.
Completing a three-step request
On the standard route the request stays in Draft, no New button appears on the Evidence related list, and an Evidence collection details related list appears with its own New button. Each collection detail holds the evidence request task number, the record that needs the evidence (Evidence for), an assignment group, an assignee, and the collection instructions. Members of the assignment group need the sn_grc.business_user role.
Select OK, then Submit, then Request Evidence. If the request is already in Work in Progress when you add a new collection detail, the task goes to the assignee at once. The assignee receives an email notification, and the request state changes to Work in Progress.
Roles, watch lists and access
Audit Management requires the sn_audit.user role. Lite Audit uses four evidence roles: sn_grc_advanced.evidence_reader, sn_grc_advanced.evidence_requester, sn_grc_advanced.evidence_responder and sn_grc_advanced.evidence_admin.
Watch list users open requests through Audit, then Evidence Request, then Watched Evidence Requests. Records marked confidential on a control test are visible only to the assigned confidential users or groups. For the instance-wide view of roles and access, see the instance security and access control guides.
The control-test grid on an engagement
The Control tests tab on an engagement record lists every control test for that engagement in one view. Two views are available. The List view, the default, shows each control test as a flat row with its key details. The Hierarchical view places each control test above its own test steps, so the steps can be read without opening the record, and applicable fields can be edited on the row.
| Column group | What it holds |
|---|---|
| Control test | Unique identifier and name |
| Design test | Design effectiveness and design results |
| Operational test | Operating effectiveness and operational results |
| Test steps | Number of steps and step details |
To add columns such as Reference, Implementation Statement or State, select the menu icon in a column header, choose Personalize columns, search for the field, and tick or clear it. Use New, Delete and Refresh to manage rows, and select Request evidence on a row to request evidence for that control test without opening it.
Deleting a control test that has related assessment procedures shows a confirmation listing each related record that will also be deleted. Read that list before you confirm. In the grid, the assigned user can edit design effectiveness, operating effectiveness, design results and operational results, and the other fields are view only there. Users with the sn_audit.admin or sn_audit.manager role can change those other fields on the control test record.
Creating a control test from an engagement
There are two routes. From the Engagements menu, go to All, Audit, Engagements, All Engagements, open the engagement, select New on the Audit Tasks related list, and choose Control Test in the Audit Tasks Interceptor. From the Audit Workspace, go to All, Audit, Audit Workspace, select the lists icon, choose All engagements or My engagements in the Execution list, and open the engagement from its Name column. Then use the grouped button below the related lists and select New control test.
Engagements in Validate or Fieldwork accept new control tests through Audit Workspace; the Audit Tasks route also lists Awaiting approval. The form groups its fields as follows.
| Field group | Fields and notes |
|---|---|
| Identity and state | Number. State is Open (the default), Work in Progress, Review, Closed Complete, Closed Incomplete or Closed Skipped. |
| Links | Control effectiveness, Issue, Test plan and Assigned to |
| Schedule | Planned and actual start and end dates, planned and actual duration. Durations take the control test schedule into account. |
| Design test | Design effectiveness (Effective, Ineffective or None), design expectations, design assessment procedures and design results. Design effectiveness takes one of three values: None, Effective or Ineffective. |
| Operation test | Operation effectiveness with the same choices, plus operation expectations, assessment procedures and results |
| Activity | Work notes, visible only to the audit manager and audit supervisor; Additional comments, visible to customers; and the Confidentiality flag |
After the form is completed and saved, add test steps from the Test steps related list with New. In the Audit Workspace procedure, each step takes an identifier, an assessment objective and an objective effectiveness value. For the policy side of the controls under test, see the policy and compliance management guides.
Design testing and operational testing
Keep the two judgements apart when you write results. The design test asks whether the control was built to meet its objective, and the operational test asks whether it works in practice. A control can be designed well and still fail in operation, or the reverse, so the grid’s side-by-side view supports the comparison without replacing the expectations and procedures on each record. For the wider governance context, see the governance, risk and compliance guides.
Documents on engagements, control tests and evidence
From Audit Management 23.x.x, Word and PDF documents can be stored in a Documents panel beside Attachments on evidence, engagement and control test records. On a control test, documents can be added, versioned and given permissions while the test is not Closed Complete, Closed Incomplete or Closed Skipped.
Frequently asked questions
What happens to a request when Skip collection detail is ticked?
It goes straight to Work in Progress with no collection details record, and the assignee adds evidence from the New button on the Evidence related list.
Can I change the route after the request is saved?
Only while the request is in Draft with no collection details. Work in Progress locks the check box, so decide before you click Request.
What happens when I delete a control test that has assessment procedures?
A confirmation lists every related record that will be deleted too, so read the list before you confirm.
For the wider picture of planning and running audits in this application, see the Audit Management guides and services page. For the testing side of the work, the risk assessment and control testing service page shows how it fits with the rest of a control testing programme.