OBLYTECH Logo
OBLYTECH Logo

BCM in ServiceNow: Plans, Roles and Workflow

Business Continuity Management (BCM) in ServiceNow takes an organisation from business impact analysis, through writing and approving continuity plans, to testing them with exercises and responding to crisis events. Plans move through Draft, In review, Pending approval, Approved and Archived, and roles such as administrator, program manager, planner and viewer split access.

What the BCM application covers

The application is built around four connected areas, each with its own structured workflow.

  • Business impact analysis (BIA) assesses how a disruption could affect business processes and IT applications, and estimates recovery times, with dependencies assessed per item.
  • Business continuity planning (BCP) defines response strategies, scope, documentation, loss scenarios, recovery teams and approvals.
  • Exercises test and refine continuity plans on scheduled dates, and event tasks are tracked through to completion.
  • A crisis event is a significant disruption that threatens business operations; the application tracks recovery actions to limit downtime and operational disruption.

The Business Continuity Workspace

The Business Continuity Workspace is the configurable, role-driven interface for BCM. It is reached from Workspaces, or under the Business Continuity menu. What a user sees depends on their role, so a planner and a viewer open the same application and get different functions.

The workspace brings together:

  • A Home page that shows continuity tasks and activity in one view.
  • A My tasks page with pending tasks, tasks assigned to a group and watchlist items, with quick actions.
  • A crisis map. The crisis map lets users manage alerts, identify threats and see their locations relative to assets.

Emergency notifications to stakeholders go through an Everbridge integration. Sending a notification creates an incident in Everbridge, which delivers it to the matching contacts and groups.

Roles that control who can do what

These are the main roles installed with the application in current releases. A fuller breakdown of who does what is on the roles, responsibilities and RACI page.

Role What it grants
Administrator (sn_bcm.admin) Create, read, write and delete on all tables, including core data
Program Manager (sn_bcm.program_manager) Create, read, write and delete on all of the application tables
Planner (sn_bcm.planner) Mostly read access; a planner can add assets or plans to an exercise, but only the exercise owner can remove them
Contributor Read access to BIA, exercise and crisis event tables; can update RTO, RPO and dependency assessment state
Viewer (sn_bcm.viewer) Read access to all application data
Recovery Team Member Views recovery tasks for crisis events and exercises assigned by the program manager
BCP Plan Manager (sn_bcp.plan_manager) Create, read, write and delete on all plans
Approval Configurator Administrator (sn_grc_appr.admin) Full access to the approval configurator setup tables

Crisis events add a further set of roles for recovery events: an event manager with full access, event member and event user roles that can read, write and create, and an event viewer with read access.

In terms of the work done, the BCM administrator sets up the application and templates. The BCM program manager works on BIAs, plans, exercises and crisis events alongside the BIA administrator, BCP administrator and planner. A BIA administrator creates business impact analyses, and a BCP administrator builds continuity plans and requests approval. The BCM lead reviews and approves BIAs and plans, and the BCM planner creates exercises and starts crisis events.

Starting with the business impact analysis

Creating a BIA calls for sn_bia.bia_admin, sn_bia.bia_manager, sn_bcm.program_manager or sn_bcm.planner. It begins in the Business Continuity Workspace: open the list view, choose Business Impact Analysis and select New. The record is saved in the Draft state.

On the Details tab, complete the required fields of the Create New Impact analysis form. Recovery objectives are handled with some care.

  • Finalized RTO is calculated automatically from the recovery time objective and the Adjusted RTO field, and Finalized RPO works the same way with the recovery point fields.
  • An adjusted value must be entered together with a reason, and the finalized value then uses the adjusted figure.

The BIA owner or a BCM manager can add contributors from the Contributors panel. A contributor has read access and can complete assessments, but cannot edit the list of contributors.

The Assessments tab holds cards for Recovery time objective, Recovery point objective and Dependency assessment. The assessment owner opens a card, answers the questions and selects Submit, and a card can be reopened to retake and resubmit. In the dependency assessment, dependencies such as applications, teams, hardware, vendors and locations are added, and the related item’s finalized RTO and RPO, together with its BIA and recovery tier, are pulled in from that dependency’s own BIA. The BIA owner uses those values to set the required recovery timeframe and the data backup needs.

Building a business continuity plan

A plan can start from a plan template that arrives with documentation sections or loss scenarios already defined. The order is usually this, and the implementation roadmap shows where it fits in a rollout:

  1. Create the plan, with New in the Lists view or with Create BIA on the Home page.
  2. Fill in the Documentation tab with goals, objectives and scope, using the templates where they help.
  3. Update dependencies with the Update dependencies button, which refreshes the asset details from the latest unarchived BIA record.
  4. Add loss scenarios, such as the loss of a data centre or a vendor disruption, with the asset dependencies or recovery strategies that answer them.
  5. Create recovery teams with the New button in the Recovery teams related list.
  6. Add recovery tasks in an order that reflects their dependencies, since tasks can run in parallel or in sequence.

A plan holds documentation sections, scopes and asset dependencies (with RTO, RPO and recovery tier for each asset), loss scenarios and strategies, recovery teams, recovery tasks and related plans.

Configuring where the dependencies come from is an administrator task. Under Business Continuity > General Administration > Planning dependency update configuration, an administrator sets the dependency sources (the CMDB or the BIA upstream and downstream links), email notifications, the plan fields that are updated and the plan types the configuration applies to.

When a plan is added to a recovery task the system checks that the dependency does not create a cycle, so avoid adding a plan that is already part of the hierarchy.

How a plan moves through its states

The lifecycle turns a document into a controlled record. For the wider ownership picture, see the governance model.

State How it is reached
Draft The default when a plan is created with New or Create BIA; the plan can be edited
In review Submit for review, from Draft
Pending approval Submit for approval
Approved Approve; an approved plan cannot be edited further
Archived Archive; from BCM 9.0.x onward, Edit reverts an archived plan to Draft
Returned Reject; the plan can be edited in this state

Other actions on the plan form include Save, Edit, Generate PDF, the 360-degree view and Delete. The Overview tab shows the plan’s progression through its states, with the current state marked In progress.

Approval levels and how to read them

Approval is configured, not hard-wired. Approval configurations can route a plan through groups, users or rules, and a plan can pass through more than one level. Each level has a state of its own.

  • Not Yet Requested: the approval has not yet been sent to approvers at that level.
  • Requested: the approval has been sent to approvers at that level, and all later levels are set to Not Yet Requested.
  • Approved: one or more approvers approved the plan at that level, and the next level moves to Requested.
  • Rejected: one or more approvers rejected the plan at that level, and all succeeding levels move to No Longer Required.
  • No Longer Required: set on the later levels once an earlier level has been rejected, because they are no longer needed.

If no approval record is in the Requested state, the plan can be approved or rejected directly.

To follow a plan’s approval path, a user with sn_bcm.planner, sn_bcm.program_manager or sn_bcm.viewer opens the Business Continuity Workspace, selects the lists icon, and opens the plan from the Name column. Approval records are visible for plans in any state except Draft and In review. The Approvals related list shows each approval’s name, level, state and approvers, whether users or groups. Opening an approval record and going to its Details tab reveals an Approval History related list, which shows approvers with the date and time each entry was created.

For a wider view of recovery planning, see the page on disaster recovery planning, and the plain-language guide for newcomers.

Frequently asked questions

What does BCM in ServiceNow include?

It includes business impact analysis, business continuity plans, exercises and crisis events.

Which states does a continuity plan go through?

Draft, In review, Pending approval, Approved and Archived. A plan that is rejected moves to Returned, and a Returned plan can be edited.

Can an approved plan still be edited?

An approved plan is read-only. An archived plan can be taken back to Draft with Edit from BCM 9.0.x onward.

Who approves a BIA or a plan?

The BIA owner or the BCM lead for that BIA can approve it. Approval levels and approvers come from approval configurations.

How are recovery targets set on a BIA?

Where the Finalized fields are present, Finalized RTO and RPO are calculated from the recovery objectives and any adjusted values. An adjusted value is entered with a reason.

Where do users open BCM?

In the Business Continuity Workspace, reached from Workspaces or under the Business Continuity menu.